{"id":10594,"date":"2017-04-21T06:13:35","date_gmt":"2017-04-20T19:43:35","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=10594"},"modified":"2024-10-02T11:05:51","modified_gmt":"2024-10-02T01:35:51","slug":"kidston-solar-farm-mb0005","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/","title":{"rendered":"Queensland&#8217;s 50MW Kidston Solar Project (Phase 1) On Track"},"content":{"rendered":"<div id=\"attachment_10595\" style=\"width: 646px\" class=\"wp-caption alignnone\"><img decoding=\"async\" aria-describedby=\"caption-attachment-10595\" class=\"size-full wp-image-10595\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg\" alt=\"Kidston Solar Project - KSP1\" width=\"636\" height=\"391\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg 636w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project-300x184.jpg 300w\" sizes=\"(max-width: 636px) 100vw, 636px\" \/><p id=\"caption-attachment-10595\" class=\"wp-caption-text\">Soon to be home to 540,000 solar panels &#8211; Image: Genex Power<\/p><\/div>\n<p>Phase One of the Kidston Solar Project (KSP1) remains on budget and on track for first electricity generation in the final quarter of this year according to the project&#8217;s developer, Genex Power.<\/p>\n<p><!--more-->The 50MW (AC) <a href=\"http:\/\/www.genexpower.com.au\/the-kidston-solar-project-phase-one-50mw.html\" target=\"_blank\" rel=\"noopener\"> project<\/a> is located approximately 270km north-west of Townsville, near Georgetown and on the site of the old Kidston Gold Mine.<\/p>\n<p>The site boasts some of the highest solar radiation levels in Australia and will apparently be hosting the only major solar project (so far) located in the so-called &#8220;red zone&#8221; (&gt;24MJ\/m2 per day) that&#8217;s also connected to the National Electricity Market (NEM).<\/p>\n<p>540,000 solar panels are to be installed at the site; with the first phase to be fully completed in the first quarter of next year. The facility has an expected service life of 30 years.<\/p>\n<p>Genex provided an update on the solar farm&#8217;s progress yesterday, stating that site clearing was now more than 50% complete, access road construction was in progress and construction site facilities had been installed.<\/p>\n<p>The company says civil works have also been completed at the Ergon substation and earthworks were underway for the solar farm substation and operations and maintenance platform. An area for storing material and components is 70% complete and an order has been placed for the main transformer for the solar farm&#8217;s substation.<\/p>\n<p>&#8220;Genex remains very focused on delivering the project on time and on budget,&#8221; <a href=\"http:\/\/media.abnnewswire.net\/media\/en\/docs\/ASX-GNX-2A1009923.pdf\" target=\"_blank\" rel=\"noopener\">said<\/a> Managing Director of Genex Power Michael Addison.<\/p>\n<p>The project is providing much-needed jobs in the area. According to the <a href=\"http:\/\/www.townsvillebulletin.com.au\/news\/kidston-solar-farm-recruiting-65-staffers-for-groundbreaking-project\/news-story\/ae3668bf51e1541b89825daa79a1dabf\" target=\"_blank\" rel=\"noopener\">Townsville Bulletin<\/a>, 20 staff have already been hired, with Genex to recruit another 65.<\/p>\n<p>Once up and running, KSP1 will generate in the region of 145 gigawatt hours of solar electricity per year; providing enough power to meet the electricity needs of the equivalent of 26,484 Australian homes while avoiding 120,000 tonnes of carbon dioxide emissions annually.<\/p>\n<p>But wait, there&#8217;s more &#8211; also in the works are <span style=\"color: #2a2a2a;\">the\u00a0Kidston Pumped\u00a0Storage Hydro Project (250MW) and Phase Two of the Kidston Solar Project ( 270MW); with the latter to well and truly dwarf this initial stage.<\/span><\/p>\n<p><span style=\"color: #2a2a2a;\">Things are certainly powering ahead in Queensland with regard to large-scale PV and the state also leads the way in terms of small-scale solar power installations. According to the <a href=\"http:\/\/www.cleanenergyregulator.gov.au\/RET\/Forms-and-resources\/Postcode-data-for-small-scale-installations\" target=\"_blank\" rel=\"noopener\">most recent data<\/a> from Australia&#8217;s Clean Energy Regulator, Queensland is home to more than 503,000 <a href=\"https:\/\/www.solarquotes.com.au\/how-does-solar-power-work\/how-much-power-do-i-need\/\">solar panel systems<\/a>. Added to that are nearly 260,000 <a href=\"https:\/\/www.solarquotes.com.au\/hot-water\/\">solar hot water systems<\/a> and <a href=\"https:\/\/www.solarquotes.com.au\/hot-water\/heat-pump\/\">heat pumps<\/a>.\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Phase One of the Kidston Solar Project (KSP1) remains on budget and on track for first electricity generation in the final quarter of this year according to the project&#8217;s developer, Genex Power.<\/p>\n","protected":false},"author":17,"featured_media":10595,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-10594","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Queensland&#039;s 50MW Kidston Solar Project (Phase 1) On Track - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"Phase One of the Kidston Solar Project (KSP1) remains on budget and on track for first electricity generation in the final quarter of this year.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Queensland&#039;s 50MW Kidston Solar Project (Phase 1) On Track\" \/>\n<meta property=\"og:description\" content=\"Phase One of the Kidston Solar Project (KSP1) remains on budget and on track for first electricity generation in the final quarter of this year.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2017-04-20T19:43:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-02T01:35:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"636\" \/>\n\t<meta property=\"og:image:height\" content=\"391\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Queensland&#8217;s 50MW Kidston Solar Project (Phase 1) On Track\",\"datePublished\":\"2017-04-20T19:43:35+00:00\",\"dateModified\":\"2024-10-02T01:35:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/\"},\"wordCount\":428,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/\",\"name\":\"Queensland's 50MW Kidston Solar Project (Phase 1) On Track - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg\",\"datePublished\":\"2017-04-20T19:43:35+00:00\",\"dateModified\":\"2024-10-02T01:35:51+00:00\",\"description\":\"Phase One of the Kidston Solar Project (KSP1) remains on budget and on track for first electricity generation in the final quarter of this year.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg\",\"width\":636,\"height\":391,\"caption\":\"Soon to be home to 540,000 solar panels - Image: Genex Power\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Queensland&#8217;s 50MW Kidston Solar Project (Phase 1) On Track\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Queensland's 50MW Kidston Solar Project (Phase 1) On Track - SolarQuotes Blog","description":"Phase One of the Kidston Solar Project (KSP1) remains on budget and on track for first electricity generation in the final quarter of this year.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/","og_locale":"en_US","og_type":"article","og_title":"Queensland's 50MW Kidston Solar Project (Phase 1) On Track","og_description":"Phase One of the Kidston Solar Project (KSP1) remains on budget and on track for first electricity generation in the final quarter of this year.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2017-04-20T19:43:35+00:00","article_modified_time":"2024-10-02T01:35:51+00:00","og_image":[{"width":636,"height":391,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Queensland&#8217;s 50MW Kidston Solar Project (Phase 1) On Track","datePublished":"2017-04-20T19:43:35+00:00","dateModified":"2024-10-02T01:35:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/"},"wordCount":428,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/","url":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/","name":"Queensland's 50MW Kidston Solar Project (Phase 1) On Track - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg","datePublished":"2017-04-20T19:43:35+00:00","dateModified":"2024-10-02T01:35:51+00:00","description":"Phase One of the Kidston Solar Project (KSP1) remains on budget and on track for first electricity generation in the final quarter of this year.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg","width":636,"height":391,"caption":"Soon to be home to 540,000 solar panels - Image: Genex Power"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-farm-mb0005\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Queensland&#8217;s 50MW Kidston Solar Project (Phase 1) On Track"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kidston-solar-project.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-2KS","jetpack-related-posts":[{"id":27062,"url":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-energy-generation-mb0895\/","url_meta":{"origin":10594,"position":0},"title":"Kidston Cranking A Heap Of Solar Electricity Goodness &#8211; And Cash","author":"Michael Bloch","date":"January 11, 2019","format":false,"excerpt":"Genex Power has released a revenue update for its 50MW Kidston Solar Project (KS1) in North Queensland, along with some energy generation statistics. Located 270 kilometres north-west of Townsville and built on the\u00a0 tailings storage facility of the closed Kidston Gold Mine, KS1 boasts 540,000 solar panels mounted on single\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Kidston solar energy project","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/kidston-solar-power.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/kidston-solar-power.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/kidston-solar-power.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/kidston-solar-power.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":17576,"url":"https:\/\/www.solarquotes.com.au\/blog\/adani-loan-veto-mb0363\/","url_meta":{"origin":10594,"position":1},"title":"PM Turnbull Receives Dear Malcolm Letter Re: Adani Coal Loan","author":"Michael Bloch","date":"December 13, 2017","format":false,"excerpt":"Queensland Premier Annastacia Palaszczuk has made good on an election promise to veto a $1 billion concessional loan to Adani for the Northern Galilee Basin Rail Project, part of its Carmichael mine project. As one of her first acts after being sworn in as Premier yesterday, Ms. Palaszczuk wrote to\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Adani coal project loan veto","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/12\/adani-coal-veto.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/12\/adani-coal-veto.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/12\/adani-coal-veto.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":77038,"url":"https:\/\/www.solarquotes.com.au\/blog\/big-bessie-battery\/","url_meta":{"origin":10594,"position":2},"title":"Tesla Operated \u201cBig Bessie\u201d Battery Rocks Rockhampton","author":"Richard Chirgwin","date":"July 18, 2023","format":false,"excerpt":"Rockhampton residents will soon reap the benefits of grid-scale renewable storage soaking up excess solar production, with Powerlink flicking the switch on a 50MW\/100MWh battery in Bouldercombe. The battery will be fully operational later this year. \u201cBig Bessie\u201d (BESS stands for Battery Energy Storage System) comprises 40 Tesla Megapack 2.0\u2026","rel":"","context":"In &quot;Battery Storage&quot;","block_context":{"text":"Battery Storage","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/battery-storage\/"},"img":{"alt_text":"bessie the battery","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/bessie-battery.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/bessie-battery.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/bessie-battery.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/bessie-battery.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/bessie-battery.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":53111,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-bhp-nickel-mb2121\/","url_meta":{"origin":10594,"position":3},"title":"BHP Boosts Offtake From Merredin Solar Farm","author":"Michael Bloch","date":"August 18, 2021","format":false,"excerpt":"A solar power purchase agreement (PPA) between Risen Energy and BHP has been expanded for BHP's Nickel West operations. The 132 MW (dc) Merredin Solar Farm is situated approximately 260 kilometres east of Perth in Western Australia\u2019s Central Wheatbelt region. Featuring 354,452 Risen Energy solar panels, it has an estimated\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Merredin Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/merredin-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/merredin-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/merredin-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/merredin-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/merredin-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":10616,"url":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-plant-mb0006\/","url_meta":{"origin":10594,"position":4},"title":"Massive Battery Plant Could Bring Jobs Boom To Townsville","author":"Michael Bloch","date":"April 24, 2017","format":false,"excerpt":"A consortium has inked an agreement with Queensland's Townsville City Council to investigate the viability of constructing of a huge battery manufacturing facility capable of churning out one million home batteries annually. The Boston Energy and Innovation (BEI) led consortium signed an exclusive Memorandum of Understanding with Council last week.\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Energy storage manufacturing in Townsville","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/townsville-battery-manufacturing.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/townsville-battery-manufacturing.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/townsville-battery-manufacturing.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":53076,"url":"https:\/\/www.solarquotes.com.au\/blog\/lg-energy-nickel-cobalt-mb2119\/","url_meta":{"origin":10594,"position":5},"title":"LG Energy Solution Inks Major Australian Battery Metals Deal","author":"Michael Bloch","date":"August 17, 2021","format":false,"excerpt":"South Korean EV battery manufacturer LG Energy Solution is to take all the nickel and cobalt from Australian Mines' proposed Sconi Project based in Queensland. Under the six-year supply deal that commences from the end of 2024, LG Energy Solution has dibs on 71,000 tonnes of nickel and 7,000 tonnes\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"LG Energy Solution and Australian Mines Ltd","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/lg-nickel-cobalt.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/lg-nickel-cobalt.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/lg-nickel-cobalt.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/lg-nickel-cobalt.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/lg-nickel-cobalt.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/10594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=10594"}],"version-history":[{"count":5,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/10594\/revisions"}],"predecessor-version":[{"id":87183,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/10594\/revisions\/87183"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/10595"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=10594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=10594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=10594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}