{"id":13861,"date":"2017-08-08T06:13:49","date_gmt":"2017-08-07T19:43:49","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=13861"},"modified":"2017-08-08T06:13:49","modified_gmt":"2017-08-07T19:43:49","slug":"renewables-400-queensland-mb0156","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/","title":{"rendered":"Registration Period Opens For Queensland&#8217;s Renewables 400"},"content":{"rendered":"<div id=\"attachment_13862\" style=\"width: 710px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-13862\" class=\"size-full wp-image-13862\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/solar-storage-queensland.jpg\" alt=\"Renewables 400\" width=\"700\" height=\"421\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/solar-storage-queensland.jpg 700w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/solar-storage-queensland-300x180.jpg 300w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><p id=\"caption-attachment-13862\" class=\"wp-caption-text\">Solar farm image: <a href=\"https:\/\/commons.wikimedia.org\/w\/index.php?curid=48566977\" target=\"_blank\" rel=\"nofollow noopener\">junilly<\/a>, CC BY 3.0<\/p><\/div>\n<p>The Palaszczuk Government says its Renewables 400 initiative will support companies wanting to build large scale renewables and energy storage projects in the state through a reverse auction process.<\/p>\n<p><!--more-->Part of the Powering Queensland Plan, a reverse auction will soon be conducted for up to 400 megawatts capacity, including 100 megawatts of energy storage.<\/p>\n<blockquote><p>\u201cEnergy storage will play an important role in the transition to higher levels of renewable energy and this process will support the accelerated deployment of this important technology,&#8221; <a href=\"https:\/\/goo.gl\/EsbAxx\" target=\"_blank\" rel=\"noopener\">said<\/a> Premier Annastacia Palaszczuk.<\/p><\/blockquote>\n<p>The Government is now calling for <a href=\"https:\/\/www.hpw.qld.gov.au\/qtenders\/tender\/display\/tender-details.do?action=display-tender-details&amp;id=21943&amp;CSRFNONCE=766C9A1EC53E427C765EBCF862B15EFA\" target=\"_blank\" rel=\"noopener\">registrations of interest<\/a> from developers of standalone renewable energy or storage and integrated projects. Companies wanting to be included when the auction process kicks off must register before 5pm on August 28.<\/p>\n<p>The Premier said Renewables 400 was a <span id=\"releaseContent0\">natural follow on from the Solar 150 program; which<\/span><span id=\"releaseContent1\">, in collaboration with the Australian Renewable Energy Agency (ARENA), has helped fund four large-scale solar projects in the state that have commenced construction or are about to.\u00a0<\/span><\/p>\n<h2>How will the reverse auction work?<\/h2>\n<p>In a normal auction (forward auction), buyers compete with each other, which often results in prices being pushed higher. In a reverse auction, sellers compete for a project, putting downwards pressure on pricing and\/or offering better value for money. The use of reverse auctions in the renewable energy sector was pioneered in the ACT; which set an example other states and countries have followed.<\/p>\n<p>In the Renewables 400 auction, companies\u00a0 will be encouraged to bid the lowest electricity price needed to support their project.<\/p>\n<blockquote><p>\u00a0\u201cSuccessful bidders will be awarded financial contracts with the Government for some or all of the electricity they generate, which will provide them with long-term certainty allowing them to secure the financing required to deliver their project,\u201d said Treasurer and Acting Energy Minister Curtis Pitt.<\/p><\/blockquote>\n<p>Another important aspect of bid evaluation will be the potential for support of local businesses and job creation.<\/p>\n<p>The<a href=\"https:\/\/www.dews.qld.gov.au\/__data\/assets\/pdf_file\/0008\/1253825\/powering-queensland-plan.pdf\" target=\"_blank\" rel=\"noopener\"> Powering Queensland Plan<\/a> (PQP), announced in June, is a $1.16 billion strategy that the Government says will stabilise electricity costs, create jobs, stimulate investment and lead the transition to Queensland&#8217;s clean energy future.<\/p>\n<p>The Queensland Government has committed to achieving a 50 per cent renewable energy target by 2030 and one million rooftops with <a href=\"https:\/\/www.solarquotes.com.au\/solar101.html\">solar power systems<\/a> or 3,000 megawatts of solar PV across the state by 2020.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Palaszczuk Government says its Renewables 400 initiative will support companies wanting to build large scale renewables and energy storage projects in the state through a reverse auction process.<\/p>\n","protected":false},"author":17,"featured_media":13862,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-13861","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Registration Period Opens For Queensland&#039;s Renewables 400 - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"The Palaszczuk Government says its Renewables 400 initiative will support companies in building large scale renewables and energy storage projects in QLD.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Registration Period Opens For Queensland&#039;s Renewables 400\" \/>\n<meta property=\"og:description\" content=\"The Palaszczuk Government says its Renewables 400 initiative will support companies in building large scale renewables and energy storage projects in QLD.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2017-08-07T19:43:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/solar-storage-queensland.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"421\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Registration Period Opens For Queensland&#8217;s Renewables 400\",\"datePublished\":\"2017-08-07T19:43:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/\"},\"wordCount\":399,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/08\\\/solar-storage-queensland.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/\",\"name\":\"Registration Period Opens For Queensland's Renewables 400 - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/08\\\/solar-storage-queensland.jpg\",\"datePublished\":\"2017-08-07T19:43:49+00:00\",\"description\":\"The Palaszczuk Government says its Renewables 400 initiative will support companies in building large scale renewables and energy storage projects in QLD.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/08\\\/solar-storage-queensland.jpg\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/08\\\/solar-storage-queensland.jpg\",\"width\":700,\"height\":421,\"caption\":\"Solar farm image: junilly, CC BY 3.0\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/renewables-400-queensland-mb0156\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/solar-battery-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Registration Period Opens For Queensland&#8217;s Renewables 400\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/michael\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Registration Period Opens For Queensland's Renewables 400 - SolarQuotes Blog","description":"The Palaszczuk Government says its Renewables 400 initiative will support companies in building large scale renewables and energy storage projects in QLD.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/","og_locale":"en_US","og_type":"article","og_title":"Registration Period Opens For Queensland's Renewables 400","og_description":"The Palaszczuk Government says its Renewables 400 initiative will support companies in building large scale renewables and energy storage projects in QLD.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2017-08-07T19:43:49+00:00","og_image":[{"width":700,"height":421,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/solar-storage-queensland.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Registration Period Opens For Queensland&#8217;s Renewables 400","datePublished":"2017-08-07T19:43:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/"},"wordCount":399,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/solar-storage-queensland.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/","url":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/","name":"Registration Period Opens For Queensland's Renewables 400 - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/solar-storage-queensland.jpg","datePublished":"2017-08-07T19:43:49+00:00","description":"The Palaszczuk Government says its Renewables 400 initiative will support companies in building large scale renewables and energy storage projects in QLD.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/solar-storage-queensland.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/solar-storage-queensland.jpg","width":700,"height":421,"caption":"Solar farm image: junilly, CC BY 3.0"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/renewables-400-queensland-mb0156\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Registration Period Opens For Queensland&#8217;s Renewables 400"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/solar-storage-queensland.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-3Bz","jetpack-related-posts":[{"id":32279,"url":"https:\/\/www.solarquotes.com.au\/blog\/qld-renewables-cleanco-mb1146\/","url_meta":{"origin":13861,"position":0},"title":"Shortlist For Queensland&#8217;s Renewables 400 Reverse Auction Announced","author":"Michael Bloch","date":"July 24, 2019","format":false,"excerpt":"It's been around two years in the making so far, but the Queensland Government's Renewables 400 reverse auction is now another step closer. Queensland Energy Minister Dr Anthony Lynham announced this morning CleanCo would commence trading in the national electricity market on October 31 and complete the Government\u2019s Renewables 400\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"CleanCo - renewable energy auction","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/07\/cleanco-renewables-auction.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/07\/cleanco-renewables-auction.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/07\/cleanco-renewables-auction.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/07\/cleanco-renewables-auction.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/07\/cleanco-renewables-auction.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":16752,"url":"https:\/\/www.solarquotes.com.au\/blog\/victoria-renewables-auction-mb0303\/","url_meta":{"origin":13861,"position":1},"title":"650MW Renewables Reverse Auction Launches In Victoria","author":"Michael Bloch","date":"November 15, 2017","format":false,"excerpt":"The Victorian government's renewable energy reverse auction is expected to drive up to $1.3 billion in new investment in large-scale projects in the state. Minister for Energy, Environment and Climate Change Lily D\u2019Ambrosio kicked off the process yesterday. Companies with existing planning permits for projects can now start bidding for\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Victoria renewable energy auction","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/victoria-renewables-auction.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/victoria-renewables-auction.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/victoria-renewables-auction.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/victoria-renewables-auction.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":65918,"url":"https:\/\/www.solarquotes.com.au\/blog\/queensland-energy-jobs-mb2655\/","url_meta":{"origin":13861,"position":2},"title":"Queensland Pumping Up Renewable Energy Goals","author":"Michael Bloch","date":"September 29, 2022","format":false,"excerpt":"Queensland Premier Annastacia Palaszczuk was pretty pumped about a \"bold clean energy future\" for Queensland yesterday - particularly concerning the role pumped hydro will play. Announcing the $62 billion Queensland Energy and Jobs Plan, Premier Palaszczuk said it would mean cheaper, cleaner and secure energy for Queenslanders. So, What's In\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Annastacia Palaszczuk - Queensland Energy and Jobs Plan","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/09\/palaszczuk-energy-jobs.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/09\/palaszczuk-energy-jobs.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/09\/palaszczuk-energy-jobs.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/09\/palaszczuk-energy-jobs.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/09\/palaszczuk-energy-jobs.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":63872,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-aces-queensland-mb2573\/","url_meta":{"origin":13861,"position":3},"title":"200,000 Solar Panels Installed On QLD Schools\u00a0Under ACES","author":"Michael Bloch","date":"July 29, 2022","format":false,"excerpt":"After four years, Queensland's Advancing Clean Energy Schools (ACES) has wrapped up with 912 schools across the Sunshine State benefiting. The ACES program kicked off in 2018. After a few teething issues and revisions to targets, the initiative has delivered 20,000 more solar panels and 40 more installations than previously\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Queensland solar schools","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/07\/qld-solar-schools.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/07\/qld-solar-schools.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/07\/qld-solar-schools.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/07\/qld-solar-schools.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/07\/qld-solar-schools.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":39004,"url":"https:\/\/www.solarquotes.com.au\/blog\/stubbo-solar-farm-mb1488\/","url_meta":{"origin":13861,"position":4},"title":"400MW Stubbo Solar Farm Project Progress","author":"Michael Bloch","date":"April 16, 2020","format":false,"excerpt":"The scoping report has been submitted for a proposed major solar energy facility in New South Wales' Mid-Western Regional Council local government area. The Stubbo Solar Farm project is a 400-megawatt facility to be situated 10 kilometres north town of Gulgong in New South Wales. Developer UPC\\AC Renewables Australia says\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Stubbo solar farm proposed site","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/04\/stubbo-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/04\/stubbo-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/04\/stubbo-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/04\/stubbo-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/04\/stubbo-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":70297,"url":"https:\/\/www.solarquotes.com.au\/blog\/cairns-townsville-supergrid-mb2802\/","url_meta":{"origin":13861,"position":5},"title":"Cairns &#8211; Townsville SuperGrid Link Work Charging Ahead","author":"Michael Bloch","date":"January 25, 2023","format":false,"excerpt":"Work currently underway on a 275kV SuperGrid Link between Cairns and Townsville will unlock up to 500MW of additional renewable energy capacity says the Palaszczuk Government. The project involves Powerlink upgrading a section of the existing 132kV coastal transmission line to permanently operate at 275kV capacity. The Palaszczuk Government has\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Queensland SuperGrid Link - Cairns to Townsville","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/queensland-supergrid-link.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/queensland-supergrid-link.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/queensland-supergrid-link.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/queensland-supergrid-link.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/queensland-supergrid-link.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/13861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=13861"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/13861\/revisions"}],"predecessor-version":[{"id":13864,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/13861\/revisions\/13864"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/13862"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=13861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=13861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=13861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}