{"id":15122,"date":"2017-09-19T08:10:49","date_gmt":"2017-09-18T21:40:49","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=15122"},"modified":"2017-09-19T08:10:49","modified_gmt":"2017-09-18T21:40:49","slug":"ross-river-solar-farm-townsville-mb0213","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/","title":{"rendered":"Ross River Solar Farm Update"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-15123\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg\" alt=\"Ross River Solar Farm\" width=\"700\" height=\"393\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg 700w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm-300x168.jpg 300w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/p>\n<p>Initial preparation works are under way at the site of the 148-megawatt Ross River Solar Farm near Townsville in Queensland.<\/p>\n<p><!--more-->An update from ESCO Pacific says a new site road entry, installation of perimeter fencing and a site office and facilities for the plant&#8217;s construction team are currently being built.<\/p>\n<p><a href=\"https:\/\/goo.gl\/thBvcf\" target=\"_blank\" rel=\"noopener\">Ross River Solar Farm<\/a> is expected to be completed within 12 months. During the peak construction phase, up to 250 workers will be required on-site and where possible, local workers will be utilised.<\/p>\n<blockquote><p>\u201cRecruitment is happening now to ensure we have a pool of appropriately skilled local workers to work alongside our specialist project team and operations staff,&#8221; <a href=\"https:\/\/goo.gl\/vWPgTq\" target=\"_blank\" rel=\"noopener\">said<\/a> Project Director, Lyndon Frearson.<\/p><\/blockquote>\n<p>The company says it is placing the community at the forefront of the development.<\/p>\n<blockquote><p>\u201cWe\u2019re putting in place a number of strategies to prevent or reduce some of the less desirable consequences of major construction works like traffic delays, noise and dust,\u201d Mr Frearson said. \u201cWe\u2019re not taking shortcuts when it comes to resident engagement, this will be a priority to ensure those living closest to the site experience minimal impact.\u201d<\/p><\/blockquote>\n<p align=\"left\">All structures on the site will be a maximum of\u00a0 3 metres high and vegetation buffers will be planted at either end of the 202-hectare site.<\/p>\n<p>Located 20 kilometres north of <a href=\"https:\/\/www.solarquotes.com.au\/installers\/townsville\/\">Townsville<\/a>, Ross River Solar Farm will be comprised of 417,600 solar panels installed on ground-mounted single axis tracking systems. The facility will generate enough clean electricity to power the equivalent of 54,000 homes, and has an expected service life of up to 40 years.<\/p>\n<blockquote><p>&#8220;Ross River Solar Farm is a significant investment that will help to reshape Australia\u2019s energy future. The project will also bring the City of Townsville one step closer to its goal of becoming a \u2018solar city\u2019,&#8221; states Esco Pacific.<\/p><\/blockquote>\n<h2>Townsville Thinking Big On Solar\u00a0 &#8211; And Storage<\/h2>\n<p>Solar power may also play an important role in securing water supplies for Townsville. In July, a Water Taskforce report <a href=\"https:\/\/www.solarquotes.com.au\/blog\/townsville-pipeline-solar-pumping-mb0106\/\">recommended solar energy<\/a> should be used to power its proposed water pumping project, with the systems connected to National Energy Market to sell any excess solar electricity generated.<\/p>\n<p>Part of Townsville&#8217;s solar city credentials could also include a leading role in energy storage.<\/p>\n<p>In April, we reported Townsville City Council had signed an agreement with a consortium led by Boston Energy and Innovation to look into the potential of constructing a <a href=\"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-plant-mb0006\/\">major battery manufacturing facility<\/a> in the region, capable of producing a million home <a href=\"https:\/\/www.solarquotes.com.au\/battery-storage\/comparison-table\/\">solar batteries<\/a> annually.<\/p>\n<p>In June, Council approved a planning report that recommended it offer a portion of land at Woodstock for the proposed facility in exchange for equity in the project.<\/p>\n<p>Boston Energy and Innovation <a href=\"https:\/\/www.bostonenergyandinnovation.com\/australian-project\" target=\"_blank\" rel=\"noopener\">states<\/a> the 15GWh manufacturing facility would create up to 1,000 direct jobs in the plant, an additional 1,000 new jobs in direct support businesses and up to 5,000 new jobs in downstream original equipment manufacturing (OEM).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Initial preparation works are under way at the site of the 148-megawatt Ross River Solar Farm near Townsville in Queensland.<\/p>\n","protected":false},"author":17,"featured_media":15123,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-15122","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ross River Solar Farm Update - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"Initial preparation works are under way at the site of the 148-megawatt Ross River Solar Farm near Townsville in Queensland.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ross River Solar Farm Update\" \/>\n<meta property=\"og:description\" content=\"Initial preparation works are under way at the site of the 148-megawatt Ross River Solar Farm near Townsville in Queensland.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2017-09-18T21:40:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"393\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Ross River Solar Farm Update\",\"datePublished\":\"2017-09-18T21:40:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/\"},\"wordCount\":481,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/\",\"name\":\"Ross River Solar Farm Update - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg\",\"datePublished\":\"2017-09-18T21:40:49+00:00\",\"description\":\"Initial preparation works are under way at the site of the 148-megawatt Ross River Solar Farm near Townsville in Queensland.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg\",\"width\":700,\"height\":393,\"caption\":\"Ross River Solar Farm\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Ross River Solar Farm Update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ross River Solar Farm Update - SolarQuotes Blog","description":"Initial preparation works are under way at the site of the 148-megawatt Ross River Solar Farm near Townsville in Queensland.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/","og_locale":"en_US","og_type":"article","og_title":"Ross River Solar Farm Update","og_description":"Initial preparation works are under way at the site of the 148-megawatt Ross River Solar Farm near Townsville in Queensland.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2017-09-18T21:40:49+00:00","og_image":[{"width":700,"height":393,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Ross River Solar Farm Update","datePublished":"2017-09-18T21:40:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/"},"wordCount":481,"commentCount":1,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/","url":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/","name":"Ross River Solar Farm Update - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg","datePublished":"2017-09-18T21:40:49+00:00","description":"Initial preparation works are under way at the site of the 148-megawatt Ross River Solar Farm near Townsville in Queensland.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg","width":700,"height":393,"caption":"Ross River Solar Farm"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Ross River Solar Farm Update"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-3VU","jetpack-related-posts":[{"id":27529,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-river-robertstown-mb0918\/","url_meta":{"origin":15122,"position":0},"title":"Solar River Project Update","author":"Michael Bloch","date":"January 30, 2019","format":false,"excerpt":"South Australia's huge Solar River Project, in the Robertstown region in the state's Mid-North, is gearing up to get under way. The first stage of the Solar River Project is to include 200MW of solar panel capacity and a 100MW lithium- ion battery system (the project web site just notes\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar energy project near Robertstown","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/solar-river-project.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/solar-river-project.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/solar-river-project.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/solar-river-project.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":17708,"url":"https:\/\/www.solarquotes.com.au\/blog\/mulwala-solar-farm-mb0371\/","url_meta":{"origin":15122,"position":1},"title":"140MW Solar Farm Proposed For Mulwala","author":"Michael Bloch","date":"December 18, 2017","format":false,"excerpt":"A 140MW solar farm that may include battery storage has been proposed for a site near the town of Mulwala in New South Wales. Mulwala is located in the Federation Council local government area in the Riverina district. It's situated on Lake Mulwala, an artificial lake that was formed by\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Mulwala Solar Farm - ESCO Pacific","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/12\/mulwala-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/12\/mulwala-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/12\/mulwala-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/12\/mulwala-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":11458,"url":"https:\/\/www.solarquotes.com.au\/blog\/sunshine-coast-solar-farm-mb0038\/","url_meta":{"origin":15122,"position":2},"title":"Sunshine Coast Solar Farm Fully Operational Soon","author":"Michael Bloch","date":"May 16, 2017","format":false,"excerpt":"The 15 megawatt Sunshine Coast Solar Farm in Valdora, Queensland, powered by Trina Solar panels, is on track to be fully operational within the next couple of months. According to Sunshine Coast Council, the project will enable it to become Australia\u2019s first local government body to offset more than 100\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Sunshine Coast Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/05\/sunshine-coast-solar-trina.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/05\/sunshine-coast-solar-trina.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/05\/sunshine-coast-solar-trina.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":18587,"url":"https:\/\/www.solarquotes.com.au\/blog\/esco-solar-farms-queensland-mb0426\/","url_meta":{"origin":15122,"position":3},"title":"Childers And Susan River Solar Farms Construction To Start Soon","author":"Michael Bloch","date":"January 23, 2018","format":false,"excerpt":"Commencement of construction of Esco Pacific's Childers And Susan River Solar Farms in Queensland isn't far off, and other Esco large-scale PV projects are progressing.\u00a0 Childers River Solar Farm To be situated 60km south of the Bundaberg's CBD and 15km south-east from the township of Childers, the project web site\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Esco Pacific Queensland Solar Power Projects","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-farms-queensland.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-farms-queensland.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-farms-queensland.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-farms-queensland.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":26516,"url":"https:\/\/www.solarquotes.com.au\/blog\/darlington-point-solar-farm-mb0862\/","url_meta":{"origin":15122,"position":4},"title":"$407 Million Darlington Point Solar Farm Approved","author":"Michael Bloch","date":"December 13, 2018","format":false,"excerpt":"The NSW Department of Planning and Environment announced yesterday it had approved a 275-megawatt solar power project to be situated approximately 10km south of Darlington Point, near Griffith. Darlington Point is a small town (population a whisker over 1,000) located on the banks of the Murrumbidgee River in western New\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Darlington Point Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/darlington-point-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/darlington-point-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/darlington-point-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/darlington-point-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":27378,"url":"https:\/\/www.solarquotes.com.au\/blog\/bluewater-solar-farm-mb0911\/","url_meta":{"origin":15122,"position":5},"title":"Townsville City Council Approval For Bluewater Solar Farm","author":"Michael Bloch","date":"January 24, 2019","format":false,"excerpt":"Things are looking good for FRV's Bluewater Solar Farm project near Townsville in Queensland, but there are still some hurdles it will need to clear. The proposed 100MWdc\/80MWac\u00a0 facility will be located 7 kilometres north of Bluewater and approximately 38 kilometres north-west of Townsville. It will feature approximately 300,000 solar\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Bluewater Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/15122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=15122"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/15122\/revisions"}],"predecessor-version":[{"id":15125,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/15122\/revisions\/15125"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/15123"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=15122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=15122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=15122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}