{"id":16689,"date":"2017-11-14T05:07:24","date_gmt":"2017-11-13T18:37:24","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=16689"},"modified":"2017-11-14T05:07:24","modified_gmt":"2017-11-13T18:37:24","slug":"clermont-wemen-solar-farm-mb0300","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/","title":{"rendered":"RCR Tomlinson Preferred Contractor For Two Major Solar Farms"},"content":{"rendered":"<div id=\"attachment_16691\" style=\"width: 710px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-16691\" class=\"size-full wp-image-16691\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg\" alt=\"Clermont Solar Farm - Wemen Sun Farm\" width=\"700\" height=\"464\" \/><p id=\"caption-attachment-16691\" class=\"wp-caption-text\">Image: <a href=\"https:\/\/pixabay.com\/en\/solar-panels-solar-energy-sun-2813032\/\" target=\"_blank\" rel=\"nofollow noopener\">plonk66<\/a><\/p><\/div>\n<p>RCR Tomlinson Ltd announced yesterday it has been chosen as the preferred Engineering, Procurement and Construction contractor for two new large-scale solar farms in Australia.<!--more--><\/p>\n<p>Subject to financial close, the company will be providing EPC plus operations and maintenance (O&amp;M) services associated with the Clermont Solar Farm (Stage 1) and Wemen Sun Farm.<\/p>\n<p><a href=\"http:\/\/clermontsolarfarm.com.au\/\" target=\"_blank\" rel=\"noopener\">Clermont Solar Farm<\/a>, located a few kilometres south west of the town of Clermont in central Queensland, is a 150MWac project to be constructed in two 75MW phases. Using solar modules on single-axis trackers, the project is expected to boast one of Australia&#8217;s highest per-unit energy yields.<\/p>\n<p>Construction of the facility will generate up to 200 jobs per phase and is expected to be completed next year.<\/p>\n<p>The 88MWac Wemen Sun Farm will be located outside Wemen, Victoria, which is approximately <span class=\"st\">110 kilometres from <a href=\"https:\/\/www.solarquotes.com.au\/installers\/mildura\/\">Mildura<\/a>. That facility is scheduled to be connected to the grid mid-2018.<\/span><\/p>\n<p>The developer of both facilities is Wirsol Energy Ltd.<\/p>\n<blockquote><p>&#8220;The Australian market plays an exceedingly important role for our international growth strategy,&#8221; <a href=\"https:\/\/wirsol.co.uk\/wirsol-acquires-additional-110mwp-solar-project-for-construction-in-australia\/\" target=\"_blank\" rel=\"noopener\">said the company<\/a> back in September when it acquired the Wemen Sun Farm project. &#8220;In coming years, we will be making a significant contribution to the expansion of renewables and setting up important power production facilities with our solar parks.&#8221;<\/p><\/blockquote>\n<p>Wirsol has five solar farms in construction in Queensland and Victoria, with a total solar generation capacity of\u00a0 ~400MWp, all of which are scheduled to be connected to the grid by mid-2018. The company said it also had additional projects in its pipeline totaling approximately 670MWp.<\/p>\n<p>Once Clermont Solar Farm and Wemen Sun Farm are commissioned, RCR will initially provide O&amp;M services for two years, with options for up to a further 13 years.<\/p>\n<p>\u201cWe are very pleased to continue our strong relationship with Wirsol to deliver these two large-scale solar energy projects,&#8221; <a href=\"https:\/\/www.rcrtom.com.au\/media\/2396\/131117-rcr-preferred-for-clermont-and-wemen-solar-projects.pdf\" target=\"_blank\" rel=\"noopener\">said<\/a> RCR Managing Director &amp; CEO, Dr Paul Dalgleish. &#8220;We are now supporting Wirsol in the development of over 200MWac of renewable energy solar projects.&#8221;<\/p>\n<p>Last week, RCR Tomlinson also announced it had been awarded a contract to commence work under a Limited Notice to Proceed (\u201cLNTP \u201d) for the 100MWac Haughton Solar Farm, which is being developed by Pacific Hydro.<\/p>\n<p>The site of <a href=\"http:\/\/www.pacifichydro.com.au\/english\/projects\/development\/haughton-solar-farm\/\" target=\"_blank\" rel=\"noopener\">Haughton Solar Farm<\/a> is in central Queensland\u2019s Burdekin Shire, 40km west of Ayr and 60km south of <a href=\"https:\/\/www.solarquotes.com.au\/installers\/townsville\/\" target=\"_blank\" rel=\"noopener\">Townsville<\/a>. Pacific Hydro has planning approval to build out to 500MWac capacity, which it says would be enough to supply the equivalent of 170,000 households.<\/p>\n<p>RCR Tomlinson is also the EPC contractor for the <a href=\"https:\/\/www.solarquotes.com.au\/blog\/hayman-daydream-solar-farms-mb0172\/\">Daydream and Hayman solar farms<\/a> in Queensland.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>RCR Tomlinson Ltd announced yesterday it has been chosen as the preferred Engineering, Procurement and Construction contractor for two new large-scale solar farms in Australia.<\/p>\n","protected":false},"author":17,"featured_media":16691,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-16689","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>RCR Tomlinson Preferred Contractor For Two Major Solar Farms<\/title>\n<meta name=\"description\" content=\"RCR Tomlinson Ltd announced yesterday it has been chosen as the preferred EPC contractor for two new large-scale solar farms in Australia.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"RCR Tomlinson Preferred Contractor For Two Major Solar Farms\" \/>\n<meta property=\"og:description\" content=\"RCR Tomlinson Ltd announced yesterday it has been chosen as the preferred EPC contractor for two new large-scale solar farms in Australia.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2017-11-13T18:37:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"464\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"RCR Tomlinson Preferred Contractor For Two Major Solar Farms\",\"datePublished\":\"2017-11-13T18:37:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/\"},\"wordCount\":444,\"commentCount\":2,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/\",\"name\":\"RCR Tomlinson Preferred Contractor For Two Major Solar Farms\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg\",\"datePublished\":\"2017-11-13T18:37:24+00:00\",\"description\":\"RCR Tomlinson Ltd announced yesterday it has been chosen as the preferred EPC contractor for two new large-scale solar farms in Australia.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg\",\"width\":700,\"height\":464,\"caption\":\"Image: plonk66\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"RCR Tomlinson Preferred Contractor For Two Major Solar Farms\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"RCR Tomlinson Preferred Contractor For Two Major Solar Farms","description":"RCR Tomlinson Ltd announced yesterday it has been chosen as the preferred EPC contractor for two new large-scale solar farms in Australia.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/","og_locale":"en_US","og_type":"article","og_title":"RCR Tomlinson Preferred Contractor For Two Major Solar Farms","og_description":"RCR Tomlinson Ltd announced yesterday it has been chosen as the preferred EPC contractor for two new large-scale solar farms in Australia.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2017-11-13T18:37:24+00:00","og_image":[{"width":700,"height":464,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"RCR Tomlinson Preferred Contractor For Two Major Solar Farms","datePublished":"2017-11-13T18:37:24+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/"},"wordCount":444,"commentCount":2,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/","url":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/","name":"RCR Tomlinson Preferred Contractor For Two Major Solar Farms","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg","datePublished":"2017-11-13T18:37:24+00:00","description":"RCR Tomlinson Ltd announced yesterday it has been chosen as the preferred EPC contractor for two new large-scale solar farms in Australia.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg","width":700,"height":464,"caption":"Image: plonk66"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"RCR Tomlinson Preferred Contractor For Two Major Solar Farms"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-4lb","jetpack-related-posts":[{"id":25759,"url":"https:\/\/www.solarquotes.com.au\/blog\/wemen-gannawarra-solar-storage-mb0822\/","url_meta":{"origin":16689,"position":0},"title":"More Large-Scale Solar And Energy Storage Progress In Victoria","author":"Michael Bloch","date":"November 13, 2018","format":false,"excerpt":"Gannawarra Solar Farm is operating at full capacity, construction of its colocated battery system has been completed and Wemen Solar Farm is connected to the grid says developer Wirsol. Gannawarra Solar Farm\/Energy Storage System Wirsol announced yesterday the 60MW Gannawarra Solar Farm 13 kilometres west of Kerang in north-west Victoria\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Gannawarra Energy Storage System - Tesla Powerpack","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":21161,"url":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/","url_meta":{"origin":16689,"position":1},"title":"All Systems Go For Queensland&#8217;s Haughton Solar Farm Construction","author":"Michael Bloch","date":"May 2, 2018","format":false,"excerpt":"RCR Tomlinson Ltd announced on Monday it has received a notice to go ahead with its contract for the 100MWac Haughton Solar Farm, being developed by Pacific Hydro. In November, the company was awarded a contract to commence work under a Limited Notice to Proceed (\u201cLNTP\u201d), pending a final investment\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Haughton solar farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":18632,"url":"https:\/\/www.solarquotes.com.au\/blog\/darling-downs-solar-farm-mb0428\/","url_meta":{"origin":16689,"position":2},"title":"Darling Downs Solar Farm Progress","author":"Michael Bloch","date":"January 24, 2018","format":false,"excerpt":"Work has commenced on the transmission line that will connect APA's Darling Downs Solar Farm in Queensland to the state's electricity network. Darling Downs Solar Farm is a 110-megawatt project situated approximately 40 kilometres from the town of Dalby and 250 kilometres from Brisbane. The clean power station will feature\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Darling Downs Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/darling-downs-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/darling-downs-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/darling-downs-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/darling-downs-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":14215,"url":"https:\/\/www.solarquotes.com.au\/blog\/hayman-daydream-solar-farms-mb0172\/","url_meta":{"origin":16689,"position":3},"title":"More Progress On Queensland&#8217;s Hayman And Daydream Solar Farms","author":"Michael Bloch","date":"August 18, 2017","format":false,"excerpt":"Interconnection agreements have been finalised for Edify Energy's Daydream and Hayman Solar Farms, which will be connected to Powerlink\u2019s 275kV network near Collinsville in Queensland. As part of the agreement,\u00a0 Powerlink will construct a dedicated transmission line, a new 275kV dedicated substation and an additional feeder bay at its existing\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar farms in Queensland","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/hayman-daydream-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/hayman-daydream-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/hayman-daydream-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/hayman-daydream-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":27378,"url":"https:\/\/www.solarquotes.com.au\/blog\/bluewater-solar-farm-mb0911\/","url_meta":{"origin":16689,"position":4},"title":"Townsville City Council Approval For Bluewater Solar Farm","author":"Michael Bloch","date":"January 24, 2019","format":false,"excerpt":"Things are looking good for FRV's Bluewater Solar Farm project near Townsville in Queensland, but there are still some hurdles it will need to clear. The proposed 100MWdc\/80MWac\u00a0 facility will be located 7 kilometres north of Bluewater and approximately 38 kilometres north-west of Townsville. It will feature approximately 300,000 solar\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Bluewater Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":23534,"url":"https:\/\/www.solarquotes.com.au\/blog\/sun-metals-solar-farm-mb0710\/","url_meta":{"origin":16689,"position":5},"title":"Sun Metals&#8217; Solar Farm Officially Opened","author":"Michael Bloch","date":"August 16, 2018","format":false,"excerpt":"Queensland Premier Annastacia Palaszczuk officially opened the Sun Metals Solar Farm on Tuesday, a huge facility incorporating more than 1.3 million solar panels. The 124MWac solar power station will supply equivalent to around one-third of the electricity needed by the Sun Metals zinc refinery, which is located approximately 15 kilometres\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Sun Metals Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/08\/sun-metals-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/08\/sun-metals-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/08\/sun-metals-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/08\/sun-metals-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/16689","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=16689"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/16689\/revisions"}],"predecessor-version":[{"id":16693,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/16689\/revisions\/16693"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/16691"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=16689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=16689"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=16689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}