{"id":18877,"date":"2018-02-02T05:09:18","date_gmt":"2018-02-01T18:39:18","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=18877"},"modified":"2018-02-02T05:09:18","modified_gmt":"2018-02-01T18:39:18","slug":"solar-storage-projects-nsw-mb0444","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/","title":{"rendered":"Solar + Storage Projects Proposed For Wee Waa And Gunnedah"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-18879\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg\" alt=\"Overland Sun Farming - solar and battery storage\" width=\"700\" height=\"400\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg 700w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage-300x171.jpg 300w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/p>\n<p>Even more big solar may be on its way in New South Wales &#8211; Overland Sun Farming has submitted proposals for major solar farms near the towns of Gunnedah and Wee Waa.<!--more--><\/p>\n<h2>Wee Waa Sun Farm<\/h2>\n<p>Wee Waa is situated on the north-western slopes of the New England region and is part of Narrabri Shire.<\/p>\n<p>The total installed capacity of the proposed Wee Waa Sun Farm, located approximately 3.5 kilometres south-east of the town, would be up to 55 MW and consist of approximately 165,000 solar panels. The Overland <a href=\"https:\/\/majorprojects.accelo.com\/public\/c31917c29e23fcaf9e7dd1366c707aae\/Wee%20Waa%20Solar%20-%20Preliminary%20Environmental%20Assessment\">proposal<\/a> also mentions the potential for battery storage, the capacity of which will be determined during the detailed design stage.<\/p>\n<p>The project will connect to either the Essential Energy 66kV electricity distribution network via Essential&#8217;s Wee Waa substation or the Narrabri to Wee Waa 66kV transmission line.<\/p>\n<p>There&#8217;s no word yet as to how the residents of Wee Waa feel about the project, but many would already be quite familiar with solar power. Clean Energy Regulator data shows a total of 455 <a href=\"https:\/\/www.solarquotes.com.au\/solar101.html\">solar power systems<\/a> (&lt; 100kW capacity) in the 2388 postcode, with a collective capacity of 1.63MW. That&#8217;s a great effort for an area with a population of around 2,700.<\/p>\n<h2>Orange Grove Sun Farm<\/h2>\n<p>Situated approximately 12 kilometres from Gunnedah in north-eastern New South Wales, Orange Grove Sun Farm would be up to 110MW and consist of approximately 330,000 solar modules.<\/p>\n<p>As with Wee Waa, the Orange Grove facility may also incorporate battery storage, but details of capacity haven&#8217;t been fleshed out as yet.<\/p>\n<p><a href=\"https:\/\/majorprojects.accelo.com\/public\/caed22ceba0cbbb4ec9788007f336ea4\/Orange%20Grove%20Solar%20-%20Preliminary%20Environmental%20Assessment.pdf\" target=\"_blank\" rel=\"noopener\">The project<\/a> would connect to the mains grid via TransGrid&#8217;s 132kV electricity distribution network originating at TransGrid\u2019s Gunnedah Substation.<\/p>\n<p>In the Gunnedah region (postcode 2380, population ~10,400), 750 small-scale solar panel systems have been installed, representing 3.25MW of capacity.<\/p>\n<p>In both cases, approvals will need to come from NSW&#8217;s Department of Planning rather than the respective councils as the projects are considered State Significant Developments (SSDs). From the commencement of site works, the projects would take around nine months to construct. Each would require 80 full-time equivalent workers during construction, and three during operations.<\/p>\n<p>Secretary\u2019s Environmental Assessment Requirements (SEARs) have been issued for both projects. The next stage is preparation of environmental impact statements and development applications.<\/p>\n<h2>Overland&#8217;s Hay Sun Farm Approved<\/h2>\n<p>As we mentioned in December, Overland had a recent win after New South Wales&#8217; Department of Planning and Environment approved development of the $150 million, 100MW (AC) <a href=\"https:\/\/www.solarquotes.com.au\/blog\/hay-sun-farm-mb0389\/\" target=\"_blank\" rel=\"noopener\">Hay Sun Farm<\/a>, a decision that was welcomed by Hay Shire Council.<\/p>\n<p><a href=\"http:\/\/www.overlandsunfarming.com.au\/\" target=\"_blank\" rel=\"noopener\">Overland Sun Farming<\/a> currently has four solar projects under construction &#8211; three in Victoria and one in Queensland &#8211; with a collective capacity of more than 355MW. It looks like New South Wales will be a focus for the company for a while &#8211; in addition to the three projects mentioned above, it has another two in the pipeline for the state.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Even more big solar may be on its way in New South Wales &#8211; Overland Sun Farming has submitted proposals for major solar farms near the towns of Gunnedah and Wee Waa.<\/p>\n","protected":false},"author":17,"featured_media":18879,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-18877","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Solar + Storage Projects Proposed For Wee Waa And Gunnedah<\/title>\n<meta name=\"description\" content=\"Even more big solar may be on its way in NSW - Overland Sun Farming has submitted proposals for major solar farms near the towns of Gunnedah and Wee Waa.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Solar + Storage Projects Proposed For Wee Waa And Gunnedah\" \/>\n<meta property=\"og:description\" content=\"Even more big solar may be on its way in NSW - Overland Sun Farming has submitted proposals for major solar farms near the towns of Gunnedah and Wee Waa.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-02-01T18:39:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Solar + Storage Projects Proposed For Wee Waa And Gunnedah\",\"datePublished\":\"2018-02-01T18:39:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/\"},\"wordCount\":482,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/\",\"name\":\"Solar + Storage Projects Proposed For Wee Waa And Gunnedah\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg\",\"datePublished\":\"2018-02-01T18:39:18+00:00\",\"description\":\"Even more big solar may be on its way in NSW - Overland Sun Farming has submitted proposals for major solar farms near the towns of Gunnedah and Wee Waa.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg\",\"width\":700,\"height\":400,\"caption\":\"Overland Sun Farming - solar and battery storage\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Solar + Storage Projects Proposed For Wee Waa And Gunnedah\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Solar + Storage Projects Proposed For Wee Waa And Gunnedah","description":"Even more big solar may be on its way in NSW - Overland Sun Farming has submitted proposals for major solar farms near the towns of Gunnedah and Wee Waa.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/","og_locale":"en_US","og_type":"article","og_title":"Solar + Storage Projects Proposed For Wee Waa And Gunnedah","og_description":"Even more big solar may be on its way in NSW - Overland Sun Farming has submitted proposals for major solar farms near the towns of Gunnedah and Wee Waa.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2018-02-01T18:39:18+00:00","og_image":[{"width":700,"height":400,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Solar + Storage Projects Proposed For Wee Waa And Gunnedah","datePublished":"2018-02-01T18:39:18+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/"},"wordCount":482,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/","url":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/","name":"Solar + Storage Projects Proposed For Wee Waa And Gunnedah","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg","datePublished":"2018-02-01T18:39:18+00:00","description":"Even more big solar may be on its way in NSW - Overland Sun Farming has submitted proposals for major solar farms near the towns of Gunnedah and Wee Waa.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg","width":700,"height":400,"caption":"Overland Sun Farming - solar and battery storage"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Solar + Storage Projects Proposed For Wee Waa And Gunnedah"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-4Ut","jetpack-related-posts":[{"id":22232,"url":"https:\/\/www.solarquotes.com.au\/blog\/nsw-solar-farms-eis-mb0624\/","url_meta":{"origin":18877,"position":0},"title":"EIS Exhibition Period Begins For NSW Large-Scale Solar Power Projects","author":"Michael Bloch","date":"June 13, 2018","format":false,"excerpt":"The Environmental Impact Statements (EIS) have gone on display for two large scale solar farm developments in New South Wales - Orange Grove Solar and Suntop Solar Farm. Orange Grove Solar Overland Sun Farming Pty Ltd is proposing a 110MW facility to be constructed around 12km east of Gunnedah, in\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"NSW solar farms","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":25774,"url":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-mb0824\/","url_meta":{"origin":18877,"position":1},"title":"Gunnedah Solar Farm Referred To Independent Planning Commission","author":"Michael Bloch","date":"November 14, 2018","format":false,"excerpt":"A major solar farm proposed for the Gunnedah area in New South Wales has been referred to the IPC as a result of the number of objections lodged.\u00a0 Photon Energy Australia Pty Ltd wants to build a 165MW solar farm approximately 9 kilometres outside of Gunnedah that will generate an\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Gunnedah Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/gunnedah-solar-farm.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/gunnedah-solar-farm.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/gunnedah-solar-farm.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/gunnedah-solar-farm.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":28694,"url":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/","url_meta":{"origin":18877,"position":2},"title":"Go-Ahead Granted For Gunnedah Solar Farm","author":"Michael Bloch","date":"March 13, 2019","format":false,"excerpt":"New South Wales' Independent Planning Commission has approved a contentious $200-million solar farm project near Gunnedah - with some added conditions. Gunnedah Solar Farm is a 165MW[1. IPC notes it as 150MW, but that may be the facility's AC rating - or perhaps the capacity has been reduced.] project proposed\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Gunnedah Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":61345,"url":"https:\/\/www.solarquotes.com.au\/blog\/silverleaf-solar-farm-mb2454\/","url_meta":{"origin":18877,"position":3},"title":"Green Light For Narrabri&#8217;s Silverleaf Solar Farm","author":"Michael Bloch","date":"April 29, 2022","format":false,"excerpt":"A solar farm pretty much on the doorstep of the NSW town of Narrabri recently received development approval after quite a lengthy review process. Engie's proposed $191 million 120MW (ac) Silverleaf Solar Farm is to be situated on approximately 330 hectares around 4km from Narrabri, in New South Wales' North\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Silverleaf Solar Farm - Narrabri","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/silverleaf-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/silverleaf-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/silverleaf-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/silverleaf-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/silverleaf-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":26829,"url":"https:\/\/www.solarquotes.com.au\/blog\/narrabri-south-solar-mb0882\/","url_meta":{"origin":18877,"position":4},"title":"Narrabri South Solar Farm Approved","author":"Michael Bloch","date":"January 1, 2019","format":false,"excerpt":"The NSW Government has been keen to announce its recent large-scale solar approvals. Here's one it appears to have missed - a 60MW facility near Narrabri. Canadian Solar's Narrabri South Solar Farm is to be built on a 190- hectare site on Old Gunnedah Road, around 10 km to the\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Narrabri South Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":14745,"url":"https:\/\/www.solarquotes.com.au\/blog\/brewongle-solar-farm-bathurst-mb0193\/","url_meta":{"origin":18877,"position":5},"title":"129MW Solar Farm Flagged For Bathurst Region","author":"Michael Bloch","date":"September 5, 2017","format":false,"excerpt":"Photon Energy Australia has proposed construction of a 129 MW solar power plant near Bathurst in New South Wales and provided a progress update on its Suntop Solar Farm project. Assuming the necessary approvals can be secured, the proposed solar power station will be built in Brewongle, which is around\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Brewongle Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/brewongle-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/brewongle-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/brewongle-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/brewongle-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/18877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=18877"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/18877\/revisions"}],"predecessor-version":[{"id":18881,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/18877\/revisions\/18881"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/18879"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=18877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=18877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=18877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}