{"id":19684,"date":"2018-03-05T05:22:20","date_gmt":"2018-03-04T18:52:20","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=19684"},"modified":"2018-03-05T05:22:20","modified_gmt":"2018-03-04T18:52:20","slug":"emu-downs-solar-farm-mb0488","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/","title":{"rendered":"Western Australia&#8217;s Emu Downs Solar Farm Completed"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-19685\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg\" alt=\"Emu Downs Solar Farm\" width=\"700\" height=\"440\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg 700w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm-300x189.jpg 300w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/p>\n<p>The Australian Renewable Energy Agency (ARENA) announced on Friday completion of Emu Downs Solar Farm, which is located approximately 200 kilometres north of Perth and 30 kilometres east of Cervantes.<!--more--><\/p>\n<p>An APA Group project, the 20-megawatt solar farm is comprised of 75,000 <a href=\"https:\/\/www.solarquotes.com.au\/panels\/cost\/\">solar panels<\/a> and was constructed adjacent to APA&#8217;s 80MW Emu Downs Wind Farm in order to complement the site&#8217;s wind resources.<\/p>\n<blockquote><p>\u201cYou\u2019ve got the profile of the wind in the morning, which dips in the middle of the day, and you\u2019ve got the solar picking up in the middle of the day. It fits in really nicely,\u201d <a href=\"https:\/\/arena.gov.au\/blog\/emu-downs\/\" target=\"_blank\" rel=\"noopener\"> says<\/a> APA Group&#8217;s Adam Pegg.<\/p><\/blockquote>\n<p>The wind farm&#8217;s existing transmission connection infrastructure is being used for the new PV facility, with only minor upgrades required to made to the existing substation.<\/p>\n<p>It&#8217;s taken under a year to get the solar farm operational, with construction starting in April 2017. Electricity generated by the facility and its associated large-scale certificates (LGCs) will be bought by Synergy out to 2030 under a power purchase agreement struck in 2016.<\/p>\n<p>Emu Downs is the first of 12 large scale solar farms to be completed that received funding under ARENA&#8217;s\u00a0 $92 million competitive round in 2016\u00a0 &#8211; and is also the first co-located wind and solar farm in Western Australia <sup class='endnote'><a href='https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#en-19684-1' id='enref-19684-1' onclick='return hhEndnotes_show(19684)'>1<\/a><\/sup> .<\/p>\n<blockquote><p>\u201cAPA\u2019s Emu Downs Solar Farm marks the beginning of a quick succession of our large scale solar farms reaching completion this year, injecting $1.1 billion into solar PV,\u201d <a href=\"https:\/\/arena.gov.au\/news\/first-cab-off-rank-first-12-large-scale-solar-farms-completed-emu-downs-western-australia\/\">said<\/a> ARENA CEO Ivor Frischknecht.<\/p><\/blockquote>\n<p>ARENA says the funding round was the catalyst for large-scale solar energy really getting into gear in Australia, pushing prices down and boosting investor confidence. Some large-scale solar projects are now being built without government funding as a result.<\/p>\n<p>Mr. Frischknecht stated there was only 10MW of large-scale solar in Australia just six years ago<sup class='endnote'><a href='https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#en-19684-2' id='enref-19684-2' onclick='return hhEndnotes_show(19684)'>2<\/a><\/sup>. By the end of this year, there will be more than 1800 MW in place, with over 10 GW capacity in the pipeline.<\/p>\n<p>Among those projects is another APA Group development &#8211; the 110-megawatt <a href=\"https:\/\/www.solarquotes.com.au\/blog\/darling-downs-solar-farm-mb0428\/\">Darling Downs Solar Farm<\/a>, which is located approximately 40 kilometres from Dalby in Queensland. That development is being supported by a $20 million grant from ARENA. Darling Downs is expected to be operational by the end of this year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Australian Renewable Energy Agency (ARENA) announced on Friday completion of Emu Downs Solar Farm, which is located approximately 200 kilometres north of Perth and 30 kilometres east of Cervantes.<\/p>\n","protected":false},"author":17,"featured_media":19685,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-19684","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Western Australia&#039;s Emu Downs Solar Farm Completed - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"The Australian Renewable Energy Agency (ARENA) announced on Friday completion of Emu Downs Solar Farm, which is located approximately 200 kilometres north of Perth\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Western Australia&#039;s Emu Downs Solar Farm Completed\" \/>\n<meta property=\"og:description\" content=\"The Australian Renewable Energy Agency (ARENA) announced on Friday completion of Emu Downs Solar Farm, which is located approximately 200 kilometres north of Perth\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-03-04T18:52:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Western Australia&#8217;s Emu Downs Solar Farm Completed\",\"datePublished\":\"2018-03-04T18:52:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/\"},\"wordCount\":434,\"commentCount\":2,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/\",\"name\":\"Western Australia's Emu Downs Solar Farm Completed - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg\",\"datePublished\":\"2018-03-04T18:52:20+00:00\",\"description\":\"The Australian Renewable Energy Agency (ARENA) announced on Friday completion of Emu Downs Solar Farm, which is located approximately 200 kilometres north of Perth\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg\",\"width\":700,\"height\":440,\"caption\":\"Emu Downs Solar Farm\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Western Australia&#8217;s Emu Downs Solar Farm Completed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Western Australia's Emu Downs Solar Farm Completed - SolarQuotes Blog","description":"The Australian Renewable Energy Agency (ARENA) announced on Friday completion of Emu Downs Solar Farm, which is located approximately 200 kilometres north of Perth","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/","og_locale":"en_US","og_type":"article","og_title":"Western Australia's Emu Downs Solar Farm Completed","og_description":"The Australian Renewable Energy Agency (ARENA) announced on Friday completion of Emu Downs Solar Farm, which is located approximately 200 kilometres north of Perth","og_url":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2018-03-04T18:52:20+00:00","og_image":[{"width":700,"height":440,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Western Australia&#8217;s Emu Downs Solar Farm Completed","datePublished":"2018-03-04T18:52:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/"},"wordCount":434,"commentCount":2,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/","url":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/","name":"Western Australia's Emu Downs Solar Farm Completed - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg","datePublished":"2018-03-04T18:52:20+00:00","description":"The Australian Renewable Energy Agency (ARENA) announced on Friday completion of Emu Downs Solar Farm, which is located approximately 200 kilometres north of Perth","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg","width":700,"height":440,"caption":"Emu Downs Solar Farm"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/emu-downs-solar-farm-mb0488\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Western Australia&#8217;s Emu Downs Solar Farm Completed"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/emu-downs-solar-farm.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-57u","jetpack-related-posts":[{"id":18632,"url":"https:\/\/www.solarquotes.com.au\/blog\/darling-downs-solar-farm-mb0428\/","url_meta":{"origin":19684,"position":0},"title":"Darling Downs Solar Farm Progress","author":"Michael Bloch","date":"January 24, 2018","format":false,"excerpt":"Work has commenced on the transmission line that will connect APA's Darling Downs Solar Farm in Queensland to the state's electricity network. Darling Downs Solar Farm is a 110-megawatt project situated approximately 40 kilometres from the town of Dalby and 250 kilometres from Brisbane. The clean power station will feature\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Darling Downs Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/darling-downs-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/darling-downs-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/darling-downs-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/darling-downs-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":55372,"url":"https:\/\/www.solarquotes.com.au\/blog\/western-downs-solar-mb2213\/","url_meta":{"origin":19684,"position":1},"title":"Huge QLD Solar + Battery Storage Project Progresses","author":"Michael Bloch","date":"October 29, 2021","format":false,"excerpt":"Western Downs Green Power Hub is another step closer to prime time, with grid connection now completed by Powerlink. Situated 22km south-east of Chinchilla in Queensland's Western Downs region, the Neoen project is a 460MW(ac)\/400MW(dc) solar power station that will generate an estimated 1,080 GWh of clean electricity per year\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Western Downs solar farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/10\/western-downs-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/10\/western-downs-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/10\/western-downs-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/10\/western-downs-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/10\/western-downs-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":14375,"url":"https:\/\/www.solarquotes.com.au\/blog\/delga-solar-farm-shell-mb0179\/","url_meta":{"origin":19684,"position":2},"title":"Queensland&#8217;s Delga Solar Farm Gets Green Light","author":"Michael Bloch","date":"August 24, 2017","format":false,"excerpt":"Western Downs Regional Council has approved development of another large solar farm in its region - this one a Shell Australia project. The proposed 250MW Delga Solar Farm is to be situated approximately 25 kilometres south-west of Wandoan on 400 hectares of land and connected to Powerlink's Wandoan South substation.\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Shell Australia solar project","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/shell-western-downs-solar.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/shell-western-downs-solar.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/shell-western-downs-solar.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/shell-western-downs-solar.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":15502,"url":"https:\/\/www.solarquotes.com.au\/blog\/lilyvale-solar-farm-mb0228\/","url_meta":{"origin":19684,"position":3},"title":"QLD&#8217;s Lilyvale Solar Farm Reaches Financial Close","author":"Michael Bloch","date":"September 29, 2017","format":false,"excerpt":"It's all systems go for Fotowatio Renewable Ventures\u2019 100MW Lilyvale Solar Farm, which will soon commence construction at a site around 50 kilometres from Emerald in Queensland. Queensland's Energy Minister Mark Bailey announced yesterday the project had reached financial close, ensuring the developers will be able to secure the necessary\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Fotowatio Renewable Ventures - Lilyvale Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/lilyvale-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/lilyvale-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/lilyvale-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/lilyvale-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":15268,"url":"https:\/\/www.solarquotes.com.au\/blog\/western-downs-solar-farm-mb0218\/","url_meta":{"origin":19684,"position":4},"title":"Go-Ahead For 250MW Western Downs Solar Farm","author":"Michael Bloch","date":"September 22, 2017","format":false,"excerpt":"Western Downs Regional Council has announced approval of another large-scale solar farm in its region - the second to be approved by Council this week. The 250MW project will be located 23km south-east of Chinchilla, close to the site of Kogan Creek Power Station. According to project developer Tilt Renewables,\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Western Downs Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/western-downs-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/western-downs-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/western-downs-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/western-downs-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":31460,"url":"https:\/\/www.solarquotes.com.au\/blog\/yarranlea-solar-farm-update-mb1112\/","url_meta":{"origin":19684,"position":5},"title":"Yarranlea Solar Farm Shaping Up","author":"Michael Bloch","date":"June 27, 2019","format":false,"excerpt":"Construction of Risen Energy (Australia)\u2019s 121 MWdc\/100 MWac Yarranlea Solar Farm in Queensland is expected to be completed by October this year. Situated near Pittsworth, approximately 50 kilometres west of Toowoomba on Queensland's Darling Downs, the facility will connect to existing Ergon Energy infrastructure; enabling transmission of the solar energy\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Yarranlea Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/yarranlea-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/yarranlea-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/yarranlea-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/yarranlea-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/yarranlea-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/19684","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=19684"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/19684\/revisions"}],"predecessor-version":[{"id":19687,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/19684\/revisions\/19687"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/19685"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=19684"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=19684"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=19684"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}