{"id":21161,"date":"2018-05-02T08:02:25","date_gmt":"2018-05-01T21:32:25","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=21161"},"modified":"2024-07-03T11:29:16","modified_gmt":"2024-07-03T01:59:16","slug":"haughton-solar-farm-mb0569","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/","title":{"rendered":"All Systems Go For Queensland&#8217;s Haughton Solar Farm Construction"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-21162\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg\" alt=\"Haughton solar farm\" width=\"700\" height=\"436\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg 700w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm-300x187.jpg 300w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/p>\n<p>RCR Tomlinson Ltd announced on Monday it has received a notice to go ahead with its contract for the 100MWac Haughton Solar Farm, being developed by Pacific Hydro.<!--more--><\/p>\n<p>In November, the company was awarded a contract to commence work under a Limited Notice to Proceed (\u201cLNTP\u201d), pending a final investment decision (\u201cFID\u201d) by Pacific Hydro. With the FID now made, it&#8217;s full steam ahead.<\/p>\n<p>RCR Tomlinson is providing Engineering, Procurement and Construction (\u201cEPC\u201d) and Operation and Maintenance (\u201cO&amp;M\u201d) services for the project.<\/p>\n<p>The <a href=\"http:\/\/www.pacifichydro.com.au\/english\/projects\/development\/haughton-solar-farm\/\" target=\"_blank\" rel=\"noopener\">Haughton Solar Farm<\/a> site is located in Queensland\u2019s Burdekin Shire, 60km south of Townsville. While the first stage is 100MWac, Pacific Hydro has planning approval to build out to 500MWac capacity, enough to power the equivalent of 170,000 households the company says.<\/p>\n<blockquote><p>&#8220;The site has been identified as an area highly suitable for efficiently capturing solar energy \u2013 the region has one of the highest levels of solar irradiance in Australia, receiving 2,095 KWh\/m\u00b2 per annum,&#8221; <a href=\"http:\/\/www.pacifichydro.com.au\/english\/projects\/development\/haughton-solar-farm\/\">states<\/a> Pacific Hydro.<\/p><\/blockquote>\n<p>As well as cranking clean power, the project will create jobs; with up to 240 workers required onsite during construction. These positions will be provided to locals where possible. Pacific Hydro has also committed to improving local infrastructure assets, including roads and waterway crossings. While not a totally altruistic contribution as these upgrades will be required for the construction of Haughton Solar Farm, the local community will continue to benefit from the improvements once the construction dust has settled..<\/p>\n<p>It&#8217;s expected Stage 1 will be completed in the first quarter of next year.<\/p>\n<p>The Haughton Solar Farm project adds to RCR Tomlinson&#8217;s growing renewables portfolio, which includes:<\/p>\n<ul>\n<li>Emerald Solar Farm<\/li>\n<li><a href=\"https:\/\/www.solarquotes.com.au\/blog\/darling-downs-solar-farm-mb0428\/\"> Darling Downs Solar Farm<\/a><\/li>\n<li><a href=\"https:\/\/www.solarquotes.com.au\/blog\/hayman-daydream-solar-farms-mb0172\/\"> Daydream and Hayman Solar Farms<\/a><\/li>\n<li>Sun Metals Solar Farm<\/li>\n<li>Gannawarra Solar Farm<\/li>\n<li>Yaloak Wind Farm<\/li>\n<li>Longreach Solar Farm<\/li>\n<li>Broken Hill Solar Farm<\/li>\n<\/ul>\n<p>In March, the company <a href=\"https:\/\/www.rcrtom.com.au\/media\/2469\/220318-asx-announcement-battery-storage-final.pdf\" target=\"_blank\" rel=\"noopener\">announced<\/a> it had also been awarded a contract for the 25MW\/50MWh Gannawarra Energy Storage System, which will be integrated with the 50MWac Gannawarra Solar Farm. Tesla Powerpacks will be used for the project.<\/p>\n<p>In other related news, it has been <a href=\"http:\/\/www.pacifichydro.com.au\/english\/projects\/development\/haughton-solar-farm\/\">reported<\/a> preparations are under way for the commissioning of the Sun Metals Solar Farm, a 124MWac facility featuring more than 1 million <a href=\"https:\/\/www.solarquotes.com.au\/panels\/photovoltaic\/thin-film\/\"> thin-film solar panels<\/a>. The clean power station will supply electricity to Sun Metals&#8217; Zinc Refinery near <a href=\"https:\/\/www.solarquotes.com.au\/installers\/townsville\/\" target=\"_blank\" rel=\"noopener\">Townsville<\/a>.<\/p>\n<p>The facility will be Australia&#8217;s largest operating solar farm &#8211; and there&#8217;s plenty more big solar energy projects currently in the works. Green Energy Markets recently reported <a href=\"hhttps:\/\/www.solarquotes.com.au\/blog\/solar-statistics-australia-mb0550\/\">5,175 megawatts of large-scale renewables<\/a> were under construction in Australia by the end March and of that figure, 2,265MW were solar projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>RCR Tomlinson Ltd announced on Monday it has received a notice to go ahead with its contract for the 100MWac Haughton Solar Farm, being developed by Pacific Hydro.<\/p>\n","protected":false},"author":17,"featured_media":21162,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-21161","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>All Systems Go For Queensland&#039;s Haughton Solar Farm Construction<\/title>\n<meta name=\"description\" content=\"RCR Tomlinson Ltd announced on Monday it has received a notice to go ahead with its contract for the 100MWac Haughton Solar Farm, being developed by Pacific Hydro.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"All Systems Go For Queensland&#039;s Haughton Solar Farm Construction\" \/>\n<meta property=\"og:description\" content=\"RCR Tomlinson Ltd announced on Monday it has received a notice to go ahead with its contract for the 100MWac Haughton Solar Farm, being developed by Pacific Hydro.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-05-01T21:32:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-07-03T01:59:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"436\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"All Systems Go For Queensland&#8217;s Haughton Solar Farm Construction\",\"datePublished\":\"2018-05-01T21:32:25+00:00\",\"dateModified\":\"2024-07-03T01:59:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/\"},\"wordCount\":443,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2018\\\/05\\\/haughton-solar-farm.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/\",\"name\":\"All Systems Go For Queensland's Haughton Solar Farm Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2018\\\/05\\\/haughton-solar-farm.jpg\",\"datePublished\":\"2018-05-01T21:32:25+00:00\",\"dateModified\":\"2024-07-03T01:59:16+00:00\",\"description\":\"RCR Tomlinson Ltd announced on Monday it has received a notice to go ahead with its contract for the 100MWac Haughton Solar Farm, being developed by Pacific Hydro.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2018\\\/05\\\/haughton-solar-farm.jpg\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2018\\\/05\\\/haughton-solar-farm.jpg\",\"width\":700,\"height\":436,\"caption\":\"Haughton solar farm\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/haughton-solar-farm-mb0569\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/solar-battery-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"All Systems Go For Queensland&#8217;s Haughton Solar Farm Construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/michael\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"All Systems Go For Queensland's Haughton Solar Farm Construction","description":"RCR Tomlinson Ltd announced on Monday it has received a notice to go ahead with its contract for the 100MWac Haughton Solar Farm, being developed by Pacific Hydro.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/","og_locale":"en_US","og_type":"article","og_title":"All Systems Go For Queensland's Haughton Solar Farm Construction","og_description":"RCR Tomlinson Ltd announced on Monday it has received a notice to go ahead with its contract for the 100MWac Haughton Solar Farm, being developed by Pacific Hydro.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2018-05-01T21:32:25+00:00","article_modified_time":"2024-07-03T01:59:16+00:00","og_image":[{"width":700,"height":436,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"All Systems Go For Queensland&#8217;s Haughton Solar Farm Construction","datePublished":"2018-05-01T21:32:25+00:00","dateModified":"2024-07-03T01:59:16+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/"},"wordCount":443,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/","url":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/","name":"All Systems Go For Queensland's Haughton Solar Farm Construction","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg","datePublished":"2018-05-01T21:32:25+00:00","dateModified":"2024-07-03T01:59:16+00:00","description":"RCR Tomlinson Ltd announced on Monday it has received a notice to go ahead with its contract for the 100MWac Haughton Solar Farm, being developed by Pacific Hydro.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg","width":700,"height":436,"caption":"Haughton solar farm"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"All Systems Go For Queensland&#8217;s Haughton Solar Farm Construction"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-5vj","jetpack-related-posts":[{"id":16689,"url":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/","url_meta":{"origin":21161,"position":0},"title":"RCR Tomlinson Preferred Contractor For Two Major Solar Farms","author":"Michael Bloch","date":"November 14, 2017","format":false,"excerpt":"RCR Tomlinson Ltd announced yesterday it has been chosen as the preferred Engineering, Procurement and Construction contractor for two new large-scale solar farms in Australia. Subject to financial close, the company will be providing EPC plus operations and maintenance (O&M) services associated with the Clermont Solar Farm (Stage 1) and\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Clermont Solar Farm - Wemen Sun Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":27378,"url":"https:\/\/www.solarquotes.com.au\/blog\/bluewater-solar-farm-mb0911\/","url_meta":{"origin":21161,"position":1},"title":"Townsville City Council Approval For Bluewater Solar Farm","author":"Michael Bloch","date":"January 24, 2019","format":false,"excerpt":"Things are looking good for FRV's Bluewater Solar Farm project near Townsville in Queensland, but there are still some hurdles it will need to clear. The proposed 100MWdc\/80MWac\u00a0 facility will be located 7 kilometres north of Bluewater and approximately 38 kilometres north-west of Townsville. It will feature approximately 300,000 solar\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Bluewater Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":21685,"url":"https:\/\/www.solarquotes.com.au\/blog\/longreach-solar-farm-mb0597\/","url_meta":{"origin":21161,"position":2},"title":"Queensland&#8217;s Longreach Solar Farm Inaugurated","author":"Michael Bloch","date":"May 23, 2018","format":false,"excerpt":"Canadian Solar's $29 million Longreach Solar Farm project had its official inauguration yesterday. The 15MW AC (17.472 MWp DC) clean power station is being progressively commissioned and is currently operating at 50% capacity. The facility is located near Longreach in Central West Queensland, which is approximately 700 km west of\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Longreach solar farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/longreach-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/longreach-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/longreach-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/longreach-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":32279,"url":"https:\/\/www.solarquotes.com.au\/blog\/qld-renewables-cleanco-mb1146\/","url_meta":{"origin":21161,"position":3},"title":"Shortlist For Queensland&#8217;s Renewables 400 Reverse Auction Announced","author":"Michael Bloch","date":"July 24, 2019","format":false,"excerpt":"It's been around two years in the making so far, but the Queensland Government's Renewables 400 reverse auction is now another step closer. Queensland Energy Minister Dr Anthony Lynham announced this morning CleanCo would commence trading in the national electricity market on October 31 and complete the Government\u2019s Renewables 400\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"CleanCo - renewable energy auction","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/07\/cleanco-renewables-auction.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/07\/cleanco-renewables-auction.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/07\/cleanco-renewables-auction.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/07\/cleanco-renewables-auction.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/07\/cleanco-renewables-auction.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":14215,"url":"https:\/\/www.solarquotes.com.au\/blog\/hayman-daydream-solar-farms-mb0172\/","url_meta":{"origin":21161,"position":4},"title":"More Progress On Queensland&#8217;s Hayman And Daydream Solar Farms","author":"Michael Bloch","date":"August 18, 2017","format":false,"excerpt":"Interconnection agreements have been finalised for Edify Energy's Daydream and Hayman Solar Farms, which will be connected to Powerlink\u2019s 275kV network near Collinsville in Queensland. As part of the agreement,\u00a0 Powerlink will construct a dedicated transmission line, a new 275kV dedicated substation and an additional feeder bay at its existing\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar farms in Queensland","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/hayman-daydream-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/hayman-daydream-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/hayman-daydream-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/hayman-daydream-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":25759,"url":"https:\/\/www.solarquotes.com.au\/blog\/wemen-gannawarra-solar-storage-mb0822\/","url_meta":{"origin":21161,"position":5},"title":"More Large-Scale Solar And Energy Storage Progress In Victoria","author":"Michael Bloch","date":"November 13, 2018","format":false,"excerpt":"Gannawarra Solar Farm is operating at full capacity, construction of its colocated battery system has been completed and Wemen Solar Farm is connected to the grid says developer Wirsol. Gannawarra Solar Farm\/Energy Storage System Wirsol announced yesterday the 60MW Gannawarra Solar Farm 13 kilometres west of Kerang in north-west Victoria\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Gannawarra Energy Storage System - Tesla Powerpack","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/21161","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=21161"}],"version-history":[{"count":3,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/21161\/revisions"}],"predecessor-version":[{"id":84959,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/21161\/revisions\/84959"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/21162"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=21161"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=21161"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=21161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}