{"id":26814,"date":"2018-12-31T05:01:42","date_gmt":"2018-12-30T18:31:42","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=26814"},"modified":"2018-12-31T05:01:42","modified_gmt":"2018-12-30T18:31:42","slug":"yarrabee-solar-farm-mb0880","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/","title":{"rendered":"Approval Granted For 900MW Yarrabee Solar Project"},"content":{"rendered":"<div id=\"attachment_26815\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project.png\"><img decoding=\"async\" aria-describedby=\"caption-attachment-26815\" class=\"size-full wp-image-26815\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project.png\" alt=\"Yarrabee Solar Project\" width=\"800\" height=\"473\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project.png 800w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project-300x177.png 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project-768x454.png 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/a><p id=\"caption-attachment-26815\" class=\"wp-caption-text\">Image: Reach Solar Energy<\/p><\/div>\n<p>After a string of large-scale solar approvals leading into the end of the year, the NSW Government has left an announcement of the biggest to last.<!--more--><\/p>\n<p>Reach Solar Energy&#8217;s 900MW (AC) <a href=\"http:\/\/www.yarrabeesolar.com\/\" target=\"_blank\" rel=\"noopener\">Yarrabee Solar Project<\/a> is to be located approximately 23 kilometres southwest of Narrandera in the Riverina Region of Western NSW and will occupy a footprint of 2,600 hectares.<\/p>\n<p>The clean power station will be developed in stages. The full 900MW capacity being developed is contingent on a number of conditions being met, including establishing power purchase agreement\/s for the electricity generated and high voltage transmission network capacity being available.<\/p>\n<p>The project will require approximately 3 million <a href=\"https:\/\/www.solarquotes.com.au\/panels\/\"> solar panels<\/a> if all stages are completed, which will be mounted on 36,000 single axis tracking systems. 222 inverter stations will be distributed throughout site. A new high voltage substation is to be constructed adjacent to the existing Wagga 330kV to Darlington Point transmission line.<\/p>\n<p>If fully developed, Yarrabee Solar Project is expected to generate just over 2,000 GWh of electricity a year, which is equivalent to the electricity consumption of approximately 335,000 homes.<\/p>\n<p>Also in the plans is a potential 35MW\/70MWh energy storage facility located adjacent to the substation. At the time the Environmental Impact Statement (<a href=\"http:\/\/majorprojects.planning.nsw.gov.au\/index.pl?action=view_job&amp;job_id=9237\" target=\"_blank\" rel=\"noopener\">EIS<\/a>) was submitted, the likely contender for the battery storage aspect was a Tesla Powerpack based system. Powerpack is what&#8217;s used in the <a href=\"https:\/\/www.solarquotes.com.au\/blog\/tesla-big-battery-first-year\/\">Tesla Big Battery (Hornsdale Power Reserve)<\/a> installation in South Australia. Like Hornsdale, Yarrabee will be able to provide ancillary services to help stabilise the grid.<\/p>\n<p>It&#8217;s expected Yarrabee&#8217;s first stage of 300MW will take approximately 18 months to construct. Between 150 and 200 construction workers will be on site on any given day during construction, but during peak activities this could jump to 450 workers.\u00a0Post-construction, 10-15 full-time staff would be required at the site on a daily basis.<\/p>\n<p>The project\u2019s capital investment value has been pegged at $956,910,000.<\/p>\n<h2>Land Use Issues<\/h2>\n<p>Laud used by solar farms can be a touchy topic, particularly where agricultural land is involved.<\/p>\n<p>The entire Yarrabee Solar Project site has been classed as &#8220;moderate agricultural capability&#8221;; i.e. not prime agricultural, and may continue to be utilised for grazing activities throughout the life of the project &#8211; between 30 and 50 years.<\/p>\n<p>Between Yarrabee and other approved PV farms in the area (including the recently approved <a href=\"https:\/\/www.solarquotes.com.au\/blog\/darlington-point-solar-farm-mb0862\/\">Darlington Point<\/a> facility), 4,350 hectares of agricultural land will be &#8220;lost&#8221; to solar development. However, the Department Of Planning &amp; Environment <a href=\"https:\/\/majorprojects.accelo.com\/public\/6e449d3ad8ff17b8f31e8d7cca77dad9\/Yarrabee%20Solar%20-%20Assessment%20Report.pdf\" target=\"_blank\" rel=\"noopener\">states<\/a> this represents approximately 0.0005% of agricultural land in the region.<\/p>\n<p>This won&#8217;t be Reach Solar Energy&#8217;s first large-scale project. The company is also involved with <a href=\"https:\/\/www.solarquotes.com.au\/blog\/bungala-solar-project-mb0242\/\">Bungala Solar Project<\/a>, a 220MW facility situated near Port Augusta in South Australia. Stage One was connected to the grid in May 2018 and Stage 2 in early November.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After a string of large-scale solar approvals leading into the end of the year, the NSW Government has left an announcement of the biggest to last.<\/p>\n","protected":false},"author":17,"featured_media":26815,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-26814","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Approval Granted For 900MW Yarrabee Solar Project - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"After a string of large-scale solar approvals leading into the end of the year, the NSW Government has left an announcement of the biggest to last.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Approval Granted For 900MW Yarrabee Solar Project\" \/>\n<meta property=\"og:description\" content=\"After a string of large-scale solar approvals leading into the end of the year, the NSW Government has left an announcement of the biggest to last.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-12-30T18:31:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project.png\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"473\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Approval Granted For 900MW Yarrabee Solar Project\",\"datePublished\":\"2018-12-30T18:31:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/\"},\"wordCount\":473,\"commentCount\":10,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2018\\\/12\\\/yarrabee-solar-project.png\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/\",\"name\":\"Approval Granted For 900MW Yarrabee Solar Project - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2018\\\/12\\\/yarrabee-solar-project.png\",\"datePublished\":\"2018-12-30T18:31:42+00:00\",\"description\":\"After a string of large-scale solar approvals leading into the end of the year, the NSW Government has left an announcement of the biggest to last.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2018\\\/12\\\/yarrabee-solar-project.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2018\\\/12\\\/yarrabee-solar-project.png\",\"width\":800,\"height\":473,\"caption\":\"Image: Reach Solar Energy\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/yarrabee-solar-farm-mb0880\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/solar-battery-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Approval Granted For 900MW Yarrabee Solar Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/michael\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Approval Granted For 900MW Yarrabee Solar Project - SolarQuotes Blog","description":"After a string of large-scale solar approvals leading into the end of the year, the NSW Government has left an announcement of the biggest to last.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/","og_locale":"en_US","og_type":"article","og_title":"Approval Granted For 900MW Yarrabee Solar Project","og_description":"After a string of large-scale solar approvals leading into the end of the year, the NSW Government has left an announcement of the biggest to last.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2018-12-30T18:31:42+00:00","og_image":[{"width":800,"height":473,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project.png","type":"image\/png"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Approval Granted For 900MW Yarrabee Solar Project","datePublished":"2018-12-30T18:31:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/"},"wordCount":473,"commentCount":10,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project.png","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/","url":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/","name":"Approval Granted For 900MW Yarrabee Solar Project - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project.png","datePublished":"2018-12-30T18:31:42+00:00","description":"After a string of large-scale solar approvals leading into the end of the year, the NSW Government has left an announcement of the biggest to last.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project.png","width":800,"height":473,"caption":"Image: Reach Solar Energy"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/yarrabee-solar-farm-mb0880\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Approval Granted For 900MW Yarrabee Solar Project"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/yarrabee-solar-project.png","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-6Yu","jetpack-related-posts":[{"id":28130,"url":"https:\/\/www.solarquotes.com.au\/blog\/nsw-labor-solar-skills-mb0948\/","url_meta":{"origin":26814,"position":0},"title":"NSW Labor&#8217;s Latest Solar Power Pledge &#8211; Solar Skills Program","author":"Michael Bloch","date":"February 21, 2019","format":false,"excerpt":"A Labor Government in New South Wales will invest $11 million to train and accredit the thousands of electricians that will be needed for work generated by the party's Solar Homes Policy. Earlier this month, NSW Labor leader Michael Daley committed to a rebate of up to $2,200 per instance\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"NSW Labor Solar Skills Program","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/labor-solar-skills.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/labor-solar-skills.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/labor-solar-skills.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/labor-solar-skills.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/labor-solar-skills.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":26829,"url":"https:\/\/www.solarquotes.com.au\/blog\/narrabri-south-solar-mb0882\/","url_meta":{"origin":26814,"position":1},"title":"Narrabri South Solar Farm Approved","author":"Michael Bloch","date":"January 1, 2019","format":false,"excerpt":"The NSW Government has been keen to announce its recent large-scale solar approvals. Here's one it appears to have missed - a 60MW facility near Narrabri. Canadian Solar's Narrabri South Solar Farm is to be built on a 190- hectare site on Old Gunnedah Road, around 10 km to the\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Narrabri South Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":32826,"url":"https:\/\/www.solarquotes.com.au\/blog\/avonlie-solar-farm-mb1181\/","url_meta":{"origin":26814,"position":2},"title":"Avonlie Solar Farm Application Approved","author":"Michael Bloch","date":"August 21, 2019","format":false,"excerpt":"The Avonlie Solar Farm project in New South Wales recently received development approval from the state's Department of Planning & Environment. The proposed project's location is approximately 20km\u00a0south of Narrandera within the Narrandera Shire Council area on a 550 hectare site predominantly used for cropping purposes. Among the reasons the\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Avonlie solar farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/avonlie-solar-project.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/avonlie-solar-project.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/avonlie-solar-project.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/avonlie-solar-project.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/avonlie-solar-project.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":27777,"url":"https:\/\/www.solarquotes.com.au\/blog\/carisbrook-solar-farm-mb0929\/","url_meta":{"origin":26814,"position":3},"title":"Go- Ahead For Carisbrook Solar Farm","author":"Michael Bloch","date":"February 7, 2019","format":false,"excerpt":"Victoria's Central Goldfields Shire Council has granted a planning permit for the Carisbrook Solar Farm project, which will incorporate energy storage. The clean power station is proposed for a 300-hectare site located approximately six kilometres east of the township of Carisbrook, which is around 67 kilometres from Bendigo by road.\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Carisbrook Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/carisbrook-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/carisbrook-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/carisbrook-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/carisbrook-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/carisbrook-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":33405,"url":"https:\/\/www.solarquotes.com.au\/blog\/goyder-south-solar-mb1209\/","url_meta":{"origin":26814,"position":4},"title":"Another Huge Renewable Energy Park Proposed For South Australia","author":"Michael Bloch","date":"September 11, 2019","format":false,"excerpt":"Further details of a proposed $1 billion wind, solar and battery storage project for South Australia\u2019s Mid-North will be revealed today. The Adelaide Advertiser reports (paywall) French company Neoen will announce \"Goyder South\", which is to be constructed in the Burra region. The Advertiser states the total project involves 1200MW\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Goyder South - wind, solar and battery storage","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/wind-solar-burra.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/wind-solar-burra.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/wind-solar-burra.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/wind-solar-burra.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/wind-solar-burra.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":33562,"url":"https:\/\/www.solarquotes.com.au\/blog\/vodcast-episode-30-mb1215\/","url_meta":{"origin":26814,"position":5},"title":"SolarQuotes Vodcast Episode 30 &#8211; Solar Deeds Done Dirt Cheap","author":"Michael Bloch","date":"September 17, 2019","format":false,"excerpt":"https:\/\/youtu.be\/dyqov4yw34o Finn and Ronald discuss how much deposit you should pay your solar installer, a major proposed wind\/solar\/storage project in SA, Project EnergyConnect and much more. How Much Deposit Should You Pay A Solar Installer? 00:34 - Finn asked Richard to investigate what the rules were in states and territories\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"SolarQuotes Vodcast Episode 30","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/vodcast-episode-30.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/vodcast-episode-30.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/vodcast-episode-30.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/vodcast-episode-30.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/vodcast-episode-30.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/26814","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=26814"}],"version-history":[{"count":3,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/26814\/revisions"}],"predecessor-version":[{"id":26818,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/26814\/revisions\/26818"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/26815"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=26814"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=26814"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=26814"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}