{"id":28694,"date":"2019-03-13T06:39:28","date_gmt":"2019-03-12T20:09:28","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=28694"},"modified":"2024-07-03T11:35:27","modified_gmt":"2024-07-03T02:05:27","slug":"gunnedah-solar-farm-approved-mb0973","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/","title":{"rendered":"Go-Ahead Granted For Gunnedah Solar Farm"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-28695\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png\" alt=\"Gunnedah Solar Farm\" width=\"800\" height=\"458\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png 800w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm-300x172.png 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm-768x440.png 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p>New South Wales&#8217; Independent Planning Commission has approved a contentious $200-million solar farm project near Gunnedah &#8211; with some added conditions.<!--more--><\/p>\n<p>Gunnedah Solar Farm is a 165MW<sup class='endnote'><a href='https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#en-28694-1' id='enref-28694-1' onclick='return hhEndnotes_show(28694)'>1<\/a><\/sup> project proposed for a site approximately 9 kilometres outside of the town. Developer Photon Energy Australia Pty Ltd says the facility will generate an estimated 293,000 MWh of electricity a year &#8211; enough to supply the equivalent of 49,000 households&#8217; requirements. Photon Energy states the clean power station will avoid 236,302 tonnes of carbon dioxide emissions annually.<\/p>\n<p><a href=\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-mb0824\/\" target=\"_blank\" rel=\"noopener\">We reported<\/a> in November last year the project had been referred to the IPC as a result of 49 objections from the public (one a duplicate) being lodged. The threshold for IPC referral is 25 objections.<\/p>\n<p>The objections were mainly around issues relating to land use, heavy vehicle traffic, flood risk and concerns over aesthetics and potential impact on local property values.<\/p>\n<p>Since referral, Commissioners met with various parties including the developer and representatives of\u00a0 Gunnedah Shire Council and the Department of Planning &amp; Environment. A public meeting was also held to discuss residents&#8217; concerns.<\/p>\n<blockquote><p>&#8220;Following careful consideration of all the evidence and weighing the community\u2019s views, the Commission has today (Tuesday 12 March 2019) determined to approve the state significant development application, subject to conditions,&#8221; stated the Independent Planning Commission.<\/p><\/blockquote>\n<p>Those conditions include ensuring the distance of the solar panels from the project boundary and their height along with proposed vegetation screening would appropriately screen the site. Photon Energy will also be required\u00a0 to prepare a decommissioning and rehabilitation plan ensuring the site is restored to its pre-existing agricultural capability (it&#8217;s currently being used for cropping) at the end of the solar farm&#8217;s service life. The project has been designed for a lifespan of 25 years, but that may be extended.<\/p>\n<p>Other conditions laid down by the IPC <a href=\"https:\/\/www.ipcn.nsw.gov.au\/resources\/pac\/media\/files\/pac\/projects\/2018\/11\/gunnedah-solar-farm\/determination\/190312-gunnedah-solar.pdf\" target=\"_blank\" rel=\"noopener\">can be viewed here<\/a>.<\/p>\n<p>Photon Energy had hoped to make a start on construction during the first quarter of this year, but the referral to the Independent Planning Commission created a delay. At the time of publishing, the planned construction start for <a href=\"https:\/\/www.photonenergy.cz\/uploads\/news\/2017\/photon-energy-gunnedah-030817-en.pdf?width=400\">Gunnedah Solar Farm<\/a> is in the final quarter of this year and installation should take approximately 12\u201314 months.<\/p>\n<p>Photon Energy says the project will create approximately 100 jobs during construction and up to ten jobs during operation. The company has committed to employing local workers where possible.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>New South Wales&#8217; Independent Planning Commission has approved a contentious $200-million solar farm project near Gunnedah &#8211; with some added conditions.<\/p>\n","protected":false},"author":17,"featured_media":28695,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-28694","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Go-Ahead Granted For Gunnedah Solar Farm - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"New South Wales&#039; Independent Planning Commission has approved a contentious $200-million solar farm project near Gunnedah - with some added conditions.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Go-Ahead Granted For Gunnedah Solar Farm\" \/>\n<meta property=\"og:description\" content=\"New South Wales&#039; Independent Planning Commission has approved a contentious $200-million solar farm project near Gunnedah - with some added conditions.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-03-12T20:09:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-07-03T02:05:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"458\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Go-Ahead Granted For Gunnedah Solar Farm\",\"datePublished\":\"2019-03-12T20:09:28+00:00\",\"dateModified\":\"2024-07-03T02:05:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/\"},\"wordCount\":412,\"commentCount\":3,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/\",\"name\":\"Go-Ahead Granted For Gunnedah Solar Farm - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png\",\"datePublished\":\"2019-03-12T20:09:28+00:00\",\"dateModified\":\"2024-07-03T02:05:27+00:00\",\"description\":\"New South Wales' Independent Planning Commission has approved a contentious $200-million solar farm project near Gunnedah - with some added conditions.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png\",\"width\":800,\"height\":458,\"caption\":\"Gunnedah Solar Farm\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Go-Ahead Granted For Gunnedah Solar Farm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Go-Ahead Granted For Gunnedah Solar Farm - SolarQuotes Blog","description":"New South Wales' Independent Planning Commission has approved a contentious $200-million solar farm project near Gunnedah - with some added conditions.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/","og_locale":"en_US","og_type":"article","og_title":"Go-Ahead Granted For Gunnedah Solar Farm","og_description":"New South Wales' Independent Planning Commission has approved a contentious $200-million solar farm project near Gunnedah - with some added conditions.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2019-03-12T20:09:28+00:00","article_modified_time":"2024-07-03T02:05:27+00:00","og_image":[{"width":800,"height":458,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png","type":"image\/png"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Go-Ahead Granted For Gunnedah Solar Farm","datePublished":"2019-03-12T20:09:28+00:00","dateModified":"2024-07-03T02:05:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/"},"wordCount":412,"commentCount":3,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/","url":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/","name":"Go-Ahead Granted For Gunnedah Solar Farm - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png","datePublished":"2019-03-12T20:09:28+00:00","dateModified":"2024-07-03T02:05:27+00:00","description":"New South Wales' Independent Planning Commission has approved a contentious $200-million solar farm project near Gunnedah - with some added conditions.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png","width":800,"height":458,"caption":"Gunnedah Solar Farm"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-approved-mb0973\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Go-Ahead Granted For Gunnedah Solar Farm"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/gunnedah-solar-farm.png","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-7sO","jetpack-related-posts":[{"id":25774,"url":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-solar-farm-mb0824\/","url_meta":{"origin":28694,"position":0},"title":"Gunnedah Solar Farm Referred To Independent Planning Commission","author":"Michael Bloch","date":"November 14, 2018","format":false,"excerpt":"A major solar farm proposed for the Gunnedah area in New South Wales has been referred to the IPC as a result of the number of objections lodged.\u00a0 Photon Energy Australia Pty Ltd wants to build a 165MW solar farm approximately 9 kilometres outside of Gunnedah that will generate an\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Gunnedah Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/gunnedah-solar-farm.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/gunnedah-solar-farm.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/gunnedah-solar-farm.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/gunnedah-solar-farm.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":14745,"url":"https:\/\/www.solarquotes.com.au\/blog\/brewongle-solar-farm-bathurst-mb0193\/","url_meta":{"origin":28694,"position":1},"title":"129MW Solar Farm Flagged For Bathurst Region","author":"Michael Bloch","date":"September 5, 2017","format":false,"excerpt":"Photon Energy Australia has proposed construction of a 129 MW solar power plant near Bathurst in New South Wales and provided a progress update on its Suntop Solar Farm project. Assuming the necessary approvals can be secured, the proposed solar power station will be built in Brewongle, which is around\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Brewongle Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/brewongle-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/brewongle-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/brewongle-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/brewongle-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":25265,"url":"https:\/\/www.solarquotes.com.au\/blog\/gunnedah-coal-power-mb0794\/","url_meta":{"origin":28694,"position":2},"title":"Gunnedah Gunna Get Coal Power?","author":"Michael Bloch","date":"October 23, 2018","format":false,"excerpt":"The Gunnedah region could be the future home of a cogeneration power station that will burn cotton plant waste - and coal. Gunnedah Shire Council announced last week it had agreed to enter a non-binding Memorandum of Understanding (MoU) with China's Tongyu Heavy Industry to research the potential of building\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Coal power in Gunneday","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/gunnedah-coal-power.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/gunnedah-coal-power.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/gunnedah-coal-power.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/gunnedah-coal-power.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":22232,"url":"https:\/\/www.solarquotes.com.au\/blog\/nsw-solar-farms-eis-mb0624\/","url_meta":{"origin":28694,"position":3},"title":"EIS Exhibition Period Begins For NSW Large-Scale Solar Power Projects","author":"Michael Bloch","date":"June 13, 2018","format":false,"excerpt":"The Environmental Impact Statements (EIS) have gone on display for two large scale solar farm developments in New South Wales - Orange Grove Solar and Suntop Solar Farm. Orange Grove Solar Overland Sun Farming Pty Ltd is proposing a 110MW facility to be constructed around 12km east of Gunnedah, in\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"NSW solar farms","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":18877,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0444\/","url_meta":{"origin":28694,"position":4},"title":"Solar + Storage Projects Proposed For Wee Waa And Gunnedah","author":"Michael Bloch","date":"February 2, 2018","format":false,"excerpt":"Even more big solar may be on its way in New South Wales - Overland Sun Farming has submitted proposals for major solar farms near the towns of Gunnedah and Wee Waa. Wee Waa Sun Farm Wee Waa is situated on the north-western slopes of the New England region and\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Overland Sun Farming - solar and battery storage","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/02\/overland-solar-storage.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":26829,"url":"https:\/\/www.solarquotes.com.au\/blog\/narrabri-south-solar-mb0882\/","url_meta":{"origin":28694,"position":5},"title":"Narrabri South Solar Farm Approved","author":"Michael Bloch","date":"January 1, 2019","format":false,"excerpt":"The NSW Government has been keen to announce its recent large-scale solar approvals. Here's one it appears to have missed - a 60MW facility near Narrabri. Canadian Solar's Narrabri South Solar Farm is to be built on a 190- hectare site on Old Gunnedah Road, around 10 km to the\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Narrabri South Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/narrabri-south-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/28694","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=28694"}],"version-history":[{"count":4,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/28694\/revisions"}],"predecessor-version":[{"id":84962,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/28694\/revisions\/84962"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/28695"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=28694"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=28694"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=28694"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}