{"id":30853,"date":"2019-06-04T07:47:36","date_gmt":"2019-06-03T21:17:36","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=30853"},"modified":"2019-06-04T07:47:36","modified_gmt":"2019-06-03T21:17:36","slug":"cultana-solar-farm-mb1081","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/","title":{"rendered":"EPC Partner For Whyalla&#8217;s Cultana Solar Farm Announced"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-30854\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm-1024x538.jpg\" alt=\"Cultana Solar Farm - South Australia\" width=\"1024\" height=\"538\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm-768x403.jpg 768w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>SIMEC Energy Australia has inked the engineering, procurement and construction (EPC) contract for the Cultana Solar Farm project in South Australia &#8211; but it&#8217;s not with an Australian company.<!--more--><\/p>\n<p>The EPC guernsey went to Shanghai Electric, a Chinese multinational power generation and electrical equipment manufacturer. The company has been involved in everything from thermal coal to wind, solar and nuclear power related projects. Last year Shanghai Electric secured the EPC contract associated with a concentrated solar power (CSP) project in Dubai (700MW).<\/p>\n<blockquote><p>&#8220;We are confident of their performance, to deliver this project on time, and on budget, to the highest standards, supporting our commitment to the creation of hundreds of new local jobs in South Australia,&#8221; <a href=\"https:\/\/www.gfgalliance.com\/media\/gfg-alliance-enters-strategic-partnership-with-shanghai-electric-to-deliver-globally-competitive-renewable-energy-in-australia\/\" target=\"_blank\" rel=\"noopener noreferrer\">said<\/a> GFG Alliance Executive Chairman and CEO Sanjeev Gupta.<\/p><\/blockquote>\n<p>SIMEC Energy Australia is part of GFG Alliance; an international group of businesses founded and owned by the British Gupta Family.<\/p>\n<h2>About Cultana Solar Farm<\/h2>\n<p>Cultana Solar Farm will be constructed on land to the north of Whyalla Steelworks and at 280MW capacity will be one of Australia&#8217;s largest PV projects to date.<\/p>\n<p>Featuring 780,000 solar panels, Cultana Solar Farm is forecast to generate around 600 gigawatt-hours of clean electricity a year that will support the energy needs of GFG\u2019s Whyalla Primary Steel plant, and export to the national electricity market (NEM) via the existing Cultana and Whyalla substations. SIMEC says the solar power plant will avoid 492,000 tonnes of carbon dioxide annually.<\/p>\n<blockquote><p>\u201cCultana Solar Farm is an ambitious project that will deliver globally-competitive renewable energy on a large scale to power-heavy industry. It is a great step forward in our vision to revitalise industry and we look forward to working with our partners to bring our renewables projects to life,\u201d Mr Gupta said.<\/p><\/blockquote>\n<p>GFG Alliance says the facility will have a key role in its 10 Mtpa Whyalla Next-Gen steel plant project, which will &#8220;ignite a new industrial revolution in Australia&#8221;.<\/p>\n<p>SIMEC secured development approval for Cultana Solar Farm last month.<\/p>\n<h2>Chinese EPC Contractor &#8211; But Local Jobs<\/h2>\n<p>Around 350 direct jobs are expected to be created during Cultana&#8217;s construction phase and SIMEC says &#8220;many&#8221; of the workers required will be recruited from the local community. There will be approximately 10 ongoing operation and maintenance positions once the project is completed.<\/p>\n<h2>More Renewables To Come<\/h2>\n<p>Cultana Solar Farm is the first project of SIMEC Energy Australia\u2019s USD $1 billion (AUD $1.43 billion at current exchange rates) 1GW dispatchable renewable energy program in South Australia that includes solar energy, battery storage and pumped hydro. Following the SA rollout, SIMEC says it will turn its attention to other parts of the country, promising even bigger projects.<\/p>\n<p>In other recent related news, WhyallaNewsOnline <a href=\"https:\/\/www.whyallanewsonline.com.au\/story\/6191936\/simec-seek-battery-approval\/?cs=1550\" target=\"_blank\" rel=\"noopener noreferrer\">reported last week<\/a> SIMEC has commenced seeking regulatory approval for a 120MW battery system to be constructed in Port Augusta, and is hoping to secure the necessary approvals by July.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SIMEC Energy Australia has inked the engineering, procurement and construction (EPC) contract for the Cultana Solar Farm project in South Australia &#8211; but it&#8217;s not with an Australian company.<\/p>\n","protected":false},"author":17,"featured_media":30854,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-30853","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>EPC Partner For Whyalla&#039;s Cultana Solar Farm Announced<\/title>\n<meta name=\"description\" content=\"SIMEC Energy Australia has inked the engineering, procurement and construction (EPC) contract for the Cultana Solar Farm project in South Australia.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EPC Partner For Whyalla&#039;s Cultana Solar Farm Announced\" \/>\n<meta property=\"og:description\" content=\"SIMEC Energy Australia has inked the engineering, procurement and construction (EPC) contract for the Cultana Solar Farm project in South Australia.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-06-03T21:17:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"EPC Partner For Whyalla&#8217;s Cultana Solar Farm Announced\",\"datePublished\":\"2019-06-03T21:17:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/\"},\"wordCount\":482,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/\",\"name\":\"EPC Partner For Whyalla's Cultana Solar Farm Announced\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg\",\"datePublished\":\"2019-06-03T21:17:36+00:00\",\"description\":\"SIMEC Energy Australia has inked the engineering, procurement and construction (EPC) contract for the Cultana Solar Farm project in South Australia.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Cultana Solar Farm - South Australia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"EPC Partner For Whyalla&#8217;s Cultana Solar Farm Announced\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"EPC Partner For Whyalla's Cultana Solar Farm Announced","description":"SIMEC Energy Australia has inked the engineering, procurement and construction (EPC) contract for the Cultana Solar Farm project in South Australia.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/","og_locale":"en_US","og_type":"article","og_title":"EPC Partner For Whyalla's Cultana Solar Farm Announced","og_description":"SIMEC Energy Australia has inked the engineering, procurement and construction (EPC) contract for the Cultana Solar Farm project in South Australia.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2019-06-03T21:17:36+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"EPC Partner For Whyalla&#8217;s Cultana Solar Farm Announced","datePublished":"2019-06-03T21:17:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/"},"wordCount":482,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/","url":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/","name":"EPC Partner For Whyalla's Cultana Solar Farm Announced","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg","datePublished":"2019-06-03T21:17:36+00:00","description":"SIMEC Energy Australia has inked the engineering, procurement and construction (EPC) contract for the Cultana Solar Farm project in South Australia.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg","width":1200,"height":630,"caption":"Cultana Solar Farm - South Australia"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/cultana-solar-farm-mb1081\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"EPC Partner For Whyalla&#8217;s Cultana Solar Farm Announced"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/cultana-solar-farm.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-81D","jetpack-related-posts":[{"id":69799,"url":"https:\/\/www.solarquotes.com.au\/blog\/stubbo-solar-epc-mb2786\/","url_meta":{"origin":30853,"position":0},"title":"PCL Construction Scores Stubbo Solar Farm EPC","author":"Michael Bloch","date":"January 11, 2023","format":false,"excerpt":"There's been more progress on ACEN Australia's huge Stubbo Solar project in New South Wales, with the Engineering, Procurement and Construction (EPC) contract now awarded. Stubbo Solar will be a 400 MW PV power station situated around 10 kilometres north of Gulgong in the Mid-Western Regional Council local government area.\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Stubbo Solar","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/stubbo-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/stubbo-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/stubbo-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/stubbo-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/stubbo-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":16480,"url":"https:\/\/www.solarquotes.com.au\/blog\/sterling-wilson-solar-australia-mb0290\/","url_meta":{"origin":30853,"position":1},"title":"Sterling And Wilson Sets 500MW Australian Solar Goal","author":"Michael Bloch","date":"November 7, 2017","format":false,"excerpt":"Sterling and Wilson is moving beyond supplying diesel generators and cogeneration energy solutions in Australia - it has set its sights on scoring 500MW of large scale solar EPC contracts here in the next three years. Headquartered in Mumbai, India, the company has built a large solar EPC (Engineering, Procurement\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Sterling and Wilson - Solar Power","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/sterling-wilson-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/sterling-wilson-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/sterling-wilson-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/sterling-wilson-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":26899,"url":"https:\/\/www.solarquotes.com.au\/blog\/canadian-solar-finley-mb0887\/","url_meta":{"origin":30853,"position":2},"title":"Canadian Solar KuMax Panels For Finley Solar Farm","author":"Michael Bloch","date":"January 7, 2019","format":false,"excerpt":"Canadian Solar has announced it is supplying KuMax modules and Engineering, Procurement and Constructions (EPC) services for Finley Solar Farm in New South Wales. The $170 million dollar project is located on a\u00a0site approximately 6 kilometres west of the town of Finley and 140 kilometres west of Albury, in the\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Canadian Solar - Finley Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/finley-canadian-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/finley-canadian-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/finley-canadian-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/finley-canadian-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":16689,"url":"https:\/\/www.solarquotes.com.au\/blog\/clermont-wemen-solar-farm-mb0300\/","url_meta":{"origin":30853,"position":3},"title":"RCR Tomlinson Preferred Contractor For Two Major Solar Farms","author":"Michael Bloch","date":"November 14, 2017","format":false,"excerpt":"RCR Tomlinson Ltd announced yesterday it has been chosen as the preferred Engineering, Procurement and Construction contractor for two new large-scale solar farms in Australia. Subject to financial close, the company will be providing EPC plus operations and maintenance (O&M) services associated with the Clermont Solar Farm (Stage 1) and\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Clermont Solar Farm - Wemen Sun Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tomlinson-solar-epc.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":21161,"url":"https:\/\/www.solarquotes.com.au\/blog\/haughton-solar-farm-mb0569\/","url_meta":{"origin":30853,"position":4},"title":"All Systems Go For Queensland&#8217;s Haughton Solar Farm Construction","author":"Michael Bloch","date":"May 2, 2018","format":false,"excerpt":"RCR Tomlinson Ltd announced on Monday it has received a notice to go ahead with its contract for the 100MWac Haughton Solar Farm, being developed by Pacific Hydro. In November, the company was awarded a contract to commence work under a Limited Notice to Proceed (\u201cLNTP\u201d), pending a final investment\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Haughton solar farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/haughton-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":23322,"url":"https:\/\/www.solarquotes.com.au\/blog\/cubbie-solar-project-mb0697\/","url_meta":{"origin":30853,"position":5},"title":"Cubbie Solar Project EPC Contractor Announced","author":"Michael Bloch","date":"August 7, 2018","format":false,"excerpt":"It won't do anything about its controversial water use, but a large-scale solar power station at Cubbie Station will significantly reduce the cotton operation's electricity consumption. VivoPower Australian subsidiary Aevitas Group Limited has been awarded the contract for engineering design, procurement and construction (EPC) of the 3.6 MW Cubbie Solar\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Cubbie Station - solar project","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/08\/cubbie-solar-project.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/08\/cubbie-solar-project.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/08\/cubbie-solar-project.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/08\/cubbie-solar-project.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/30853","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=30853"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/30853\/revisions"}],"predecessor-version":[{"id":30856,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/30853\/revisions\/30856"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/30854"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=30853"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=30853"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=30853"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}