{"id":31467,"date":"2019-06-28T06:26:29","date_gmt":"2019-06-27T19:56:29","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=31467"},"modified":"2019-06-28T06:26:29","modified_gmt":"2019-06-27T19:56:29","slug":"sa-nsw-interconnector-mb1113","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/","title":{"rendered":"Proposed SA-NSW Interconnector Granted Major Project Status"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-31468\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector-1024x538.png\" alt=\"SA-NSW interconnector - Project EnergyConnect\" width=\"1024\" height=\"538\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector-1024x538.png 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector-300x158.png 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector-768x403.png 768w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>South Australia&#8217;s Marshall Government announced yesterday it had granted the proposed $1.5 billion &#8220;Project EnergyConnect&#8221; SA-NSW interconnector Major Project Status.<!--more--><\/p>\n<p>South Australia currently only has interconnection with Victoria. The Marshall Government says the addition of SA-NSW interconnector will bring cheaper power, improved reliability and boost electricity export opportunities for the state&#8217;s renewable energy sector.<\/p>\n<p>As to how much the average household will save on their electricity bills each year; the number is pegged at around $66 a year in SA and $30 in New South Wales. For South Australian businesses, an example provided of a service station consuming 509,000 kilowatt-hours of electricity annually indicated net annual savings of an estimated $6,710.<\/p>\n<blockquote><p>\u201cSignificantly reduced electricity bills for small businesses will be good for jobs, investment and the local economy,\u201d <a href=\"https:\/\/premier.sa.gov.au\/news\/interconnector-gets-major-project-status\" target=\"_blank\" rel=\"noopener noreferrer\"> said<\/a> South Australian Minister for Energy and Mining Dan van Holst Pellekaan.<\/p><\/blockquote>\n<p>The 330 kilovolt (kV) above-ground transmission line would run from Robertstown in South Australia\u2019s mid-north to Wagga Wagga in New South Wales, via Buronga &#8211; and there will be an added connection to Red Cliffs in north west Victoria. Overall, the line would run a distance of 900 kilometres.<\/p>\n<p>The route passes though renewable energy zones in South Australia, New South Wales and Victoria; meaning future renewable projects in these zones should have a comparatively easy time of connecting to the grid.<\/p>\n<p>At the SA end of the proposed interconnector, there has already been significant large-scale solar energy project activity near Robertstown in the form of <a href=\"https:\/\/www.solarquotes.com.au\/blog\/solar-river-robertstown-mb0918\/\">Solar River<\/a>, <a href=\"https:\/\/www.solarquotes.com.au\/blog\/roberstown-solar-storage-mb0919\/\">Robertstown Solar<\/a> and a couple of <a href=\"https:\/\/www.solarquotes.com.au\/blog\/roberstown-solar-power-mb0943\/\">SA Water PV projects<\/a>. While these projects aren&#8217;t reliant on the interconnector proceeding, it&#8217;s considered by the developers of Solar River and Robertstown Solar to be a bonus.<\/p>\n<p>The granting of Major Project Status means the environmental and planning approval process for Project EnergyConnect &#8211; which will be delivered through a <span id=\"DeltaPlaceHolderMain\">TransGrid\/ElectraNet partnership &#8211;<\/span> will be streamlined. But this doesn&#8217;t mean it will be smooth sailing.<\/p>\n<h2>Interconnector Route Ruffles Feathers<\/h2>\n<p>A small section of the current proposed route of the interconnector has raised some concerns. Birdlife Australia has flagged it will run through breeding territory of the <a href=\"https:\/\/en.wikipedia.org\/wiki\/Black-eared_miner\" target=\"_blank\" rel=\"noopener noreferrer\">black-eared miner<\/a>, a critically endangered bird, and other threatened species. The black-eared miner, pictured below, looks similar to the very common and much more boisterous noisy miner.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-31469\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/black-eared-miner.jpg\" alt=\"Black-eared miner\" width=\"800\" height=\"500\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/black-eared-miner.jpg 800w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/black-eared-miner-300x188.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/black-eared-miner-768x480.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<blockquote><p>&#8220;South Australia\u2019s Calperum Station is part of only five natural areas listed in our national #naturelaws to protect a threatened species, the Endangered Black-eared Miner,&#8221; <a href=\"https:\/\/www.facebook.com\/BirdLifeAustralia\/photos\/a.233227400113440\/1746860148750150\/\" target=\"_blank\" rel=\"noopener noreferrer\">said the group<\/a> on Facebook. &#8220;Alarmingly, a high voltage powerline route that will cut straight through this critical habitat has been proposed, and the proposal is currently open for public comment by the Australian Government.&#8221;<\/p><\/blockquote>\n<p>Apparently, more than 1,400 emails have been sent expressing concern. According to an Adelaide Advertiser <a href=\"https:\/\/www.adelaidenow.com.au\/news\/south-australia\/birdlife-australia-says-interconnector-threatens-a-critically-endangered-bird-the-blackeared-miner\/news-story\/6f78b8e632a5005b8cc785f756a7cb82\" target=\"_blank\" rel=\"noopener noreferrer\">report<\/a> (paywall), up to around 12 hectares of the area of concern will need to be cleared &#8211; or 0.003 per cent of the critical habitat area &#8211; but the bird hasn&#8217;t been sighted in the general area of the proposed alignment for years. Still, the fact remains the interconnector line would run through a defined critical habitat area and the situation regarding the black-eared miner will be scrutinised during environmental reviews of the project.<\/p>\n<p>Currently, Project EnergyConnect is undergoing a <a href=\"https:\/\/www.aer.gov.au\/networks-pipelines\/guidelines-schemes-models-reviews\/regulatory-investment-test-for-transmission-rit-t-and-application-guidelines-2010\" target=\"_blank\" rel=\"noopener noreferrer\">Regulatory Investment Test for Transmission<\/a>, the results of which should be known in second half of this year.<\/p>\n<p>You can learn more about <a href=\"https:\/\/www.projectenergyconnect.com.au\" target=\"_blank\" rel=\"noopener noreferrer\">Project EnergyConnect here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>South Australia&#8217;s Marshall Government announced yesterday it had granted the proposed $1.5 billion &#8220;Project EnergyConnect&#8221; SA-NSW interconnector Major Project Status.<\/p>\n","protected":false},"author":17,"featured_media":31468,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-31467","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Proposed SA-NSW Interconnector Granted Major Project Status<\/title>\n<meta name=\"description\" content=\"The South Australian government has announced granting of Major Project Status to the proposed $1.5 billion &quot;Project EnergyConnect&quot; SA-NSW interconnector.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Proposed SA-NSW Interconnector Granted Major Project Status\" \/>\n<meta property=\"og:description\" content=\"The South Australian government has announced granting of Major Project Status to the proposed $1.5 billion &quot;Project EnergyConnect&quot; SA-NSW interconnector.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-06-27T19:56:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Proposed SA-NSW Interconnector Granted Major Project Status\",\"datePublished\":\"2019-06-27T19:56:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/\"},\"wordCount\":566,\"commentCount\":6,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/\",\"name\":\"Proposed SA-NSW Interconnector Granted Major Project Status\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png\",\"datePublished\":\"2019-06-27T19:56:29+00:00\",\"description\":\"The South Australian government has announced granting of Major Project Status to the proposed $1.5 billion \\\"Project EnergyConnect\\\" SA-NSW interconnector.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png\",\"width\":1200,\"height\":630,\"caption\":\"SA-NSW interconnector - Project EnergyConnect\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Proposed SA-NSW Interconnector Granted Major Project Status\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Proposed SA-NSW Interconnector Granted Major Project Status","description":"The South Australian government has announced granting of Major Project Status to the proposed $1.5 billion \"Project EnergyConnect\" SA-NSW interconnector.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/","og_locale":"en_US","og_type":"article","og_title":"Proposed SA-NSW Interconnector Granted Major Project Status","og_description":"The South Australian government has announced granting of Major Project Status to the proposed $1.5 billion \"Project EnergyConnect\" SA-NSW interconnector.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2019-06-27T19:56:29+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png","type":"image\/png"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Proposed SA-NSW Interconnector Granted Major Project Status","datePublished":"2019-06-27T19:56:29+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/"},"wordCount":566,"commentCount":6,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/","url":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/","name":"Proposed SA-NSW Interconnector Granted Major Project Status","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png","datePublished":"2019-06-27T19:56:29+00:00","description":"The South Australian government has announced granting of Major Project Status to the proposed $1.5 billion \"Project EnergyConnect\" SA-NSW interconnector.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png","width":1200,"height":630,"caption":"SA-NSW interconnector - Project EnergyConnect"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-interconnector-mb1113\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Proposed SA-NSW Interconnector Granted Major Project Status"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/06\/project-energyconnect-interconnector.png","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-8bx","jetpack-related-posts":[{"id":33435,"url":"https:\/\/www.solarquotes.com.au\/blog\/project-energyconnect-interconnector-mb1210\/","url_meta":{"origin":31467,"position":0},"title":"South Australian Energy Minister Talks Up Project EnergyConnect","author":"Michael Bloch","date":"September 12, 2019","format":false,"excerpt":"SA's Minister for Energy and Mining Dan van Holst Pellekaan was again spruiking the virtues of a SA-NSW interconnector yesterday. The comments came after an announcement earlier yesterday renewables developer Neoen has proposed a massive renewable energy project for the state's Mid-North region - Goyder South.\u00a0 The full project would\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Project EnergyConnect","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/project-energyconnect.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/project-energyconnect.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/project-energyconnect.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/project-energyconnect.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/project-energyconnect.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":22618,"url":"https:\/\/www.solarquotes.com.au\/blog\/sa-nsw-electricity-interconnector-mb0648\/","url_meta":{"origin":31467,"position":1},"title":"Proposed SA\/NSW Electricity Interconnector A Step Closer","author":"Michael Bloch","date":"July 2, 2018","format":false,"excerpt":"ElectraNet has published a draft report providing more detail on the proposed construction of a high capacity interconnector between South Australia and New South Wales. ElectraNet has been exploring options to facilitate South Australia\u2019s energy transformation, while improving system security and helping to put downwards pressure on electricity prices. It\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"South Australia - New South Wales interconnector","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/nsw-sa-interconnector-2.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/nsw-sa-interconnector-2.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/nsw-sa-interconnector-2.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/nsw-sa-interconnector-2.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":59498,"url":"https:\/\/www.solarquotes.com.au\/blog\/qld-nsw-interconnector-mb2379\/","url_meta":{"origin":31467,"position":2},"title":"Queensland-NSW Interconnector Project &#8220;On Track&#8221;","author":"Michael Bloch","date":"March 3, 2022","format":false,"excerpt":"The Queensland-NSW Interconnector (QNI) upgrade project is on track for completion by May 2022 says Transgrid. Transgrid is the manager and operator of the high voltage electricity transmission network in New South Wales and the ACT. Electricity is carried from generators through 13,000 kilometres of Transgrid's high voltage transmission lines\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Queensland - New South Wales Interconnector upgrade project","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/03\/queesnland-nsw-interconnector.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/03\/queesnland-nsw-interconnector.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/03\/queesnland-nsw-interconnector.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/03\/queesnland-nsw-interconnector.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/03\/queesnland-nsw-interconnector.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":20038,"url":"https:\/\/www.solarquotes.com.au\/blog\/sa-election-renewable-energy\/","url_meta":{"origin":31467,"position":3},"title":"What Does The Liberal Win Mean For Clean Energy in SA?","author":"Ronald Brakels","date":"March 19, 2018","format":false,"excerpt":"The South Australian Liberals have won the election.\u00a0 The results seemed clear on Saturday night and are looking very definite now on Monday morning.\u00a0 They have a small but clear majority allowing them to govern in their own right.\u00a0 Now that the power is theirs, will solar and wind continue\u2026","rel":"","context":"In &quot;Solar Policy&quot;","block_context":{"text":"Solar Policy","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-policy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/sa-result.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/sa-result.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/sa-result.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/sa-result.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/sa-result.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/03\/sa-result.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":24023,"url":"https:\/\/www.solarquotes.com.au\/blog\/sa-budget-energy-mb0732\/","url_meta":{"origin":31467,"position":4},"title":"South Australian Budget 2018\/19 &#8211; Energy","author":"Michael Bloch","date":"September 5, 2018","format":false,"excerpt":"South Australia's State Budget 2018-19\u00a0 has delivered on SA Liberal's election commitment to sink a big chunk of change in establishing its Home Battery Scheme. $100 million dollars has been committed over 4 years for the Scheme, which will provide subsidies for up to 40,000 households to buy solar battery\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"South Australian Budget 2018-19 - Energy","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/09\/sa-budget-energy.gif?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/09\/sa-budget-energy.gif?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/09\/sa-budget-energy.gif?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/09\/sa-budget-energy.gif?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":44921,"url":"https:\/\/www.solarquotes.com.au\/blog\/renewables-long-distance-transmission\/","url_meta":{"origin":31467,"position":5},"title":"Renewables Need More Long Distance Transmission. Low Interest Rates Can Make That Happen.","author":"Ronald Brakels","date":"February 8, 2021","format":false,"excerpt":"Long-distance transmission sends electrical energy from where it's generated to where it's used.\u00a0 If we had more of it, electricity prices would be lower, and the integration of solar and wind farms would be easier.\u00a0 Thanks to record low-interest rates, more of it is exactly what we're going to get.\u2026","rel":"","context":"In &quot;Solar Policy&quot;","block_context":{"text":"Solar Policy","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-policy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/transmission-lines.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/transmission-lines.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/transmission-lines.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/transmission-lines.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/transmission-lines.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/31467","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=31467"}],"version-history":[{"count":5,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/31467\/revisions"}],"predecessor-version":[{"id":31475,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/31467\/revisions\/31475"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/31468"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=31467"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=31467"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=31467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}