{"id":33910,"date":"2019-10-03T07:01:02","date_gmt":"2019-10-02T20:31:02","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=33910"},"modified":"2019-10-03T07:01:02","modified_gmt":"2019-10-02T20:31:02","slug":"townsville-battery-factory-mb1237","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/","title":{"rendered":"Another Step Towards Townsville&#8217;s Battery &#8220;Gigafactory&#8221;"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-33911\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery.jpg\" alt=\"Townsville battery factory\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery-768x403.jpg 768w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery-1024x538.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Magnis Energy Technologies has announced the finalised Townsville Battery Manufacturing Plant Feasibility Study has been submitted to the Queensland Government.<!--more--><\/p>\n<p>Back in 2017, a consortium led by Magnis inked an agreement with Queensland\u2019s Townsville City Council to delve into the possibility of <a href=\"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-plant-mb0006\/\">constructing of\u00a0 major battery manufacturing facility<\/a> in the region. Originally it was to have an annual storage production capacity of 15GWh, but that appears to have been bumped up to 18GWh.<\/p>\n<p>If all that 18GWh of annual production went towards home <a href=\"https:\/\/www.solarquotes.com.au\/battery-storage\/comparison-table\/\">solar batteries<\/a> (which it won&#8217;t be), it would be the equivalent to the total storage capacity of around 1.28 million Tesla Powerwall 2 units.<\/p>\n<p>The proposed site for the project is Lansdown Station near Woodstock; approximately 40 kilometres south of Townsville&#8217;s CBD.<\/p>\n<p>The project&#8217;s official name is <span class=\"st\">Imperium3 Townsville\u00a0 (iM3TSV). Aside from Magnis, the other members of the iM3TSV consortium are C4V LLC New York and Boston Energy and Innovation (BEI).<\/span><\/p>\n<p>In June last year, formal agreements to fast-track the project were signed and the project also received a $3.1 million grant from the Queensland Government to support the development of a feasibility study to determine financial viability and a detailed engineering plan.<\/p>\n<h2>3 x 6GWh Stages Recommended<\/h2>\n<p>That study has recommended phasing the project over 3 stages of 6 GWhs each, for a total nominal capacity of 18 GWh annually. This approach will reduce upfront capital expenditure to $1.12B for the first stage (around $940M to $960M for subsequent stages) and allow for project expansion to occur in line with technology and market developments.<\/p>\n<blockquote><p>&#8220;The cost for stage 1 is slightly higher than stages 2 and 3, due to the need for iM3TSV to contribute to the cost of extending some trunk infrastructure services to the site,&#8221; says Magnis, which also states the study &#8220;demonstrated sound financial viability on a project basis with an NPV of A$2.55 Billion and 21% IRR.&#8221;<\/p><\/blockquote>\n<p>The project&#8217;s intended timeline indicates construction of the first stage would commence in Q3 2020 and be completed by the end of Q3 2022. Approximately 1150 direct jobs would be created with all three stages completed and the facility operating at full capacity.<\/p>\n<h2>32700 Cells Selected<\/h2>\n<p>iM3TSV has selected a cylindrical 32700 form factor for the battery cells to be produced at the factory, which Magnis says is better suited to high volume manufacturing. 32700 refers to the cell&#8217;s physical size &#8211; diameter of the cell is 32mm and the height (or length) is 70mm. Magnis states the 32700 also offers\u00a0 improvements in performance and cost while still maintaining flexibility in the range of applications for its use &#8211; for example, electric vehicles or residential solar energy storage systems.<\/p>\n<p>Over the next few months, a development application for iM3TSV will be prepared and then submitted to Townsville City Council. The consortium will also be chasing funding with the assistance of project financial adviser NAB.<\/p>\n<p>iM3TSV will also commence battery cell production testing in a commercial setting at equipment vendor facilities, which include Durr Megtec and Siemens.<\/p>\n<blockquote><p>&#8220;iM3 battery cells will be provided to customers for independent evaluation and qualification as a precursor to procuring offtake contracts,&#8221; says Magnis.<\/p><\/blockquote>\n<p>The full announcement <a href=\"https:\/\/drive.google.com\/open?id=1TFIMDt93BZfI1KvA0AJF8Oe7mo_GjQU9\" target=\"_blank\" rel=\"noopener noreferrer\">can be viewed here<\/a>.<\/p>\n<p>Townsville Mayor Jenny Hill is pretty excited about iM3TSV, <a href=\"https:\/\/www.townsville.qld.gov.au\/about-council\/news-and-publications\/media-releases\/2019\/april\/federal-funding-will-charge-townsville-battery-plant\">stating<\/a> back in April the plant would charge Townsville&#8217;s economy for decades.<\/p>\n<blockquote><p>\u201cThis has the potential to completely transform the city\u2019s manufacturing industries and create thousands of spin-off jobs in a rapidly growing sector.&#8221;<\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>Magnis Energy Technologies has announced the finalised Townsville Battery Manufacturing Plant Feasibility Study has been submitted to the Queensland Government.<\/p>\n","protected":false},"author":17,"featured_media":33911,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-33910","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Another Step Towards Townsville&#039;s Battery &quot;Gigafactory&quot;<\/title>\n<meta name=\"description\" content=\"Magnis Energy Technologies has announced the finalised Townsville Battery Manufacturing Plant Feasibility Study has been submitted to the QLD Government.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Another Step Towards Townsville&#039;s Battery &quot;Gigafactory&quot;\" \/>\n<meta property=\"og:description\" content=\"Magnis Energy Technologies has announced the finalised Townsville Battery Manufacturing Plant Feasibility Study has been submitted to the QLD Government.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-10-02T20:31:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Another Step Towards Townsville&#8217;s Battery &#8220;Gigafactory&#8221;\",\"datePublished\":\"2019-10-02T20:31:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/\"},\"wordCount\":576,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/im3-townsville-battery.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/\",\"name\":\"Another Step Towards Townsville's Battery \\\"Gigafactory\\\"\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/im3-townsville-battery.jpg\",\"datePublished\":\"2019-10-02T20:31:02+00:00\",\"description\":\"Magnis Energy Technologies has announced the finalised Townsville Battery Manufacturing Plant Feasibility Study has been submitted to the QLD Government.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/im3-townsville-battery.jpg\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/im3-townsville-battery.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Townsville battery factory\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/townsville-battery-factory-mb1237\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/solar-battery-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Another Step Towards Townsville&#8217;s Battery &#8220;Gigafactory&#8221;\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/michael\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Another Step Towards Townsville's Battery \"Gigafactory\"","description":"Magnis Energy Technologies has announced the finalised Townsville Battery Manufacturing Plant Feasibility Study has been submitted to the QLD Government.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/","og_locale":"en_US","og_type":"article","og_title":"Another Step Towards Townsville's Battery \"Gigafactory\"","og_description":"Magnis Energy Technologies has announced the finalised Townsville Battery Manufacturing Plant Feasibility Study has been submitted to the QLD Government.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2019-10-02T20:31:02+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Another Step Towards Townsville&#8217;s Battery &#8220;Gigafactory&#8221;","datePublished":"2019-10-02T20:31:02+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/"},"wordCount":576,"commentCount":1,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/","url":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/","name":"Another Step Towards Townsville's Battery \"Gigafactory\"","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery.jpg","datePublished":"2019-10-02T20:31:02+00:00","description":"Magnis Energy Technologies has announced the finalised Townsville Battery Manufacturing Plant Feasibility Study has been submitted to the QLD Government.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery.jpg","width":1200,"height":630,"caption":"Townsville battery factory"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-factory-mb1237\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Another Step Towards Townsville&#8217;s Battery &#8220;Gigafactory&#8221;"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/im3-townsville-battery.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-8OW","jetpack-related-posts":[{"id":10616,"url":"https:\/\/www.solarquotes.com.au\/blog\/townsville-battery-plant-mb0006\/","url_meta":{"origin":33910,"position":0},"title":"Massive Battery Plant Could Bring Jobs Boom To Townsville","author":"Michael Bloch","date":"April 24, 2017","format":false,"excerpt":"A consortium has inked an agreement with Queensland's Townsville City Council to investigate the viability of constructing of a huge battery manufacturing facility capable of churning out one million home batteries annually. The Boston Energy and Innovation (BEI) led consortium signed an exclusive Memorandum of Understanding with Council last week.\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Energy storage manufacturing in Townsville","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/townsville-battery-manufacturing.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/townsville-battery-manufacturing.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/townsville-battery-manufacturing.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":84714,"url":"https:\/\/www.solarquotes.com.au\/blog\/townsville-lrez-mb2950\/","url_meta":{"origin":33910,"position":1},"title":"Townsville Declared A QLD Local Renewable Energy Zone","author":"Michael Bloch","date":"June 26, 2024","format":false,"excerpt":"Queensland's Miles Government wants to boost rooftop solar power and energy storage capacity in Townsville, and have non-solar households sharing the benefits of locally generated clean electricity. In Townsville, solar panels are already a common sight on the rooftops of homes and businesses. The Miles Government wants the community to\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Townsville LREZ","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/06\/lrez-townsville.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/06\/lrez-townsville.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/06\/lrez-townsville.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/06\/lrez-townsville.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/06\/lrez-townsville.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":41833,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-townsville-mb1626\/","url_meta":{"origin":33910,"position":2},"title":"Gem Of A Solar + Storage Project For Townsville Catholic Diocese","author":"Michael Bloch","date":"August 3, 2020","format":false,"excerpt":"GEM Energy has been selected to deliver a $20 million solar power and Tesla battery storage project for the Townsville Catholic Education Office. In 2014, Townsville Catholic Education commenced the rollout of a solar PV and lighting program across all schools in the Townsville Diocese; a region extending to Mount\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Gem Energy - solar and battery storage","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/gem-energy-solar-storage.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/gem-energy-solar-storage.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/gem-energy-solar-storage.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/gem-energy-solar-storage.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/gem-energy-solar-storage.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":12867,"url":"https:\/\/www.solarquotes.com.au\/blog\/townsville-pipeline-solar-pumping-mb0106\/","url_meta":{"origin":33910,"position":3},"title":"Townsville Water Taskforce Recommends Solar Power For Pumping","author":"Michael Bloch","date":"July 3, 2017","format":false,"excerpt":"Solar energy may soon play an important role in securing water supplies for the Queensland city of Townsville as part of a proposed new pipeline project. In March this year, the Federal and Queensland Governments along with Townsville City Council appointed a Water Taskforce to study potential water security solutions\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"solar powered water pumping","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/07\/townsville-solar-pumping.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/07\/townsville-solar-pumping.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/07\/townsville-solar-pumping.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/07\/townsville-solar-pumping.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":15122,"url":"https:\/\/www.solarquotes.com.au\/blog\/ross-river-solar-farm-townsville-mb0213\/","url_meta":{"origin":33910,"position":4},"title":"Ross River Solar Farm Update","author":"Michael Bloch","date":"September 19, 2017","format":false,"excerpt":"Initial preparation works are under way at the site of the 148-megawatt Ross River Solar Farm near Townsville in Queensland. An update from ESCO Pacific says a new site road entry, installation of perimeter fencing and a site office and facilities for the plant's construction team are currently being built.\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Ross River Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/09\/ross-river-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":70297,"url":"https:\/\/www.solarquotes.com.au\/blog\/cairns-townsville-supergrid-mb2802\/","url_meta":{"origin":33910,"position":5},"title":"Cairns &#8211; Townsville SuperGrid Link Work Charging Ahead","author":"Michael Bloch","date":"January 25, 2023","format":false,"excerpt":"Work currently underway on a 275kV SuperGrid Link between Cairns and Townsville will unlock up to 500MW of additional renewable energy capacity says the Palaszczuk Government. The project involves Powerlink upgrading a section of the existing 132kV coastal transmission line to permanently operate at 275kV capacity. The Palaszczuk Government has\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Queensland SuperGrid Link - Cairns to Townsville","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/queensland-supergrid-link.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/queensland-supergrid-link.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/queensland-supergrid-link.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/queensland-supergrid-link.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/queensland-supergrid-link.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/33910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=33910"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/33910\/revisions"}],"predecessor-version":[{"id":33913,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/33910\/revisions\/33913"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/33911"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=33910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=33910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=33910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}