{"id":35224,"date":"2019-11-26T05:32:59","date_gmt":"2019-11-25T19:02:59","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=35224"},"modified":"2019-11-26T05:32:59","modified_gmt":"2019-11-25T19:02:59","slug":"resolute-hybrid-power-station-mb1305","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/","title":{"rendered":"Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-35225\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg\" alt=\"Hybrid power station - Resolute and Aggreko\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power-768x403.jpg 768w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power-1024x538.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Australia&#8217;s Resolute Mining Limited is partnering with Aggreko on a new hybrid modular power station project at Resolute&#8217;s Syama Gold Mine in Mali, West Africa that is expected to slash Syama\u2019s electricity costs by approximately 40%. <!--more--><\/p>\n<p>Resolute announced yesterday it had signed a Heads of Terms Agreement for the project &#8211; basically an agreement about an agreement &#8211; which will be funded and operated by Aggreko.<\/p>\n<p>Stage 1, expected to be completed next year, will be comprised of 3 Modular Block generators (30MW capacity total) and a 10MW\/5MWh Y.Cube battery storage system.<\/p>\n<p>The new generators will run on intermediate fuel oil (IFO 180), a blend of distillate and residual fuels that Resolute says will increase efficiency by 30%.<\/p>\n<p>The second stage in 2022 will consist of another 10MW Modular Block and construction of a 20MW solar farm. So, in total &#8211; 40MW thermal generation, 20MW solar energy generation and 10MW\/5MWh of battery storage.<\/p>\n<h2>What About Emissions?<\/h2>\n<p>IFO 180 apparently generates a <a href=\"https:\/\/www.volker-quaschning.de\/datserv\/CO2-spez\/index_e.php\">similar level of carbon emissions as diesel <\/a>(but is higher in sulphur) when used for electricity generation, but <a href=\"https:\/\/clients3.weblink.com.au\/pdf\/RSG\/02176708.pdf\">Resolute says<\/a> the new system will reduce carbon emissions compared to current levels by approximately 20%. Resolute is currently running a 28MW diesel power station at Syama.<\/p>\n<h2>Y.Cube Battery Storage<\/h2>\n<p>The Y.Cube is a &#8220;plug and play&#8221; lithium-ion battery system developed by Younicos, which was acquired by Aggreko a couple of years ago. The Y.Cube is 1MW capacity and housed within a standard sized shipping container.<\/p>\n<h2>Australian Miners\/Mining Operations Turning To Renewables<\/h2>\n<p>There&#8217;s been plenty of activity on the off-grid renewables front over the last couple of years as mining companies discover the cost savings renewable energy can provide. Emissions reduction is a nice bonus for them (and for everyone); particularly with shareholders becoming more concerned about climate change.<\/p>\n<p>Just last week, a <a href=\"http:\/\/www.overend.co.za\/download\/1120nov2019gfledljointmediareleaseagnewmicrogrid.pdf\">23MW hybrid generation project<\/a> consisting of a 4MW solar farm, 16MW of gas and 3MW diesel generation capacity commenced operations at Gold Fields&#8217;<sup class='endnote'><a href='https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#en-35224-1' id='enref-35224-1' onclick='return hhEndnotes_show(35224)'>1<\/a><\/sup> Agnew Gold Mine in Western Australia. The second stage, expected to be completed around the middle of next year, will see 18MW of wind generation, a 13MW battery and an advanced micro-grid control system integrated. After completion, renewables are expected to provide 50% of the Agnew gold mine\u2019s power requirements.<\/p>\n<p>Aggreko is currently constructing a <a href=\"https:\/\/www.solarquotes.com.au\/blog\/australian-mine-solar-storage-mb0930\/\">hybrid power station at Gold Fields&#8217; Granny Smith mine<\/a> in Western Australia that will feature 8MW of solar power generation, along with a 2MW \/ 1MWh battery energy storage system and 24MW of gas generation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Australia&#8217;s Resolute Mining Limited is partnering with Aggreko on a new hybrid modular power station project at Resolute&#8217;s Syama Gold Mine in Mali, West Africa that is expected to slash Syama\u2019s electricity costs by approximately 40%.<\/p>\n","protected":false},"author":17,"featured_media":35225,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-35224","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining<\/title>\n<meta name=\"description\" content=\"Australia&#039;s Resolute Mining Limited is partnering with Aggreko on a new hybrid modular power station project at Resolute&#039;s Syama Gold Mine in Mali.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining\" \/>\n<meta property=\"og:description\" content=\"Australia&#039;s Resolute Mining Limited is partnering with Aggreko on a new hybrid modular power station project at Resolute&#039;s Syama Gold Mine in Mali.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-25T19:02:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining\",\"datePublished\":\"2019-11-25T19:02:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/\"},\"wordCount\":435,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/\",\"name\":\"Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg\",\"datePublished\":\"2019-11-25T19:02:59+00:00\",\"description\":\"Australia's Resolute Mining Limited is partnering with Aggreko on a new hybrid modular power station project at Resolute's Syama Gold Mine in Mali.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Hybrid power station - Resolute and Aggreko\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining","description":"Australia's Resolute Mining Limited is partnering with Aggreko on a new hybrid modular power station project at Resolute's Syama Gold Mine in Mali.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/","og_locale":"en_US","og_type":"article","og_title":"Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining","og_description":"Australia's Resolute Mining Limited is partnering with Aggreko on a new hybrid modular power station project at Resolute's Syama Gold Mine in Mali.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2019-11-25T19:02:59+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining","datePublished":"2019-11-25T19:02:59+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/"},"wordCount":435,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/","url":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/","name":"Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg","datePublished":"2019-11-25T19:02:59+00:00","description":"Australia's Resolute Mining Limited is partnering with Aggreko on a new hybrid modular power station project at Resolute's Syama Gold Mine in Mali.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg","width":1200,"height":630,"caption":"Hybrid power station - Resolute and Aggreko"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-9a8","jetpack-related-posts":[{"id":47885,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-hybrid-minining-mb1891\/","url_meta":{"origin":35224,"position":0},"title":"Another Miner Turns To Solar Power","author":"Michael Bloch","date":"February 24, 2021","format":false,"excerpt":"Abra Mining Pty Limited has executed a Power Purchase Agreement (PPA) with Contract Power Group for a hybrid electricity generation system including solar panels and battery storage for a project in WA. The Abra Base Metals Project, 77.28% owned by Galena Mining Ltd, is a lead-silver venture located in the\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar power in Australian mining","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/solar-mining-wa.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/solar-mining-wa.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/solar-mining-wa.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/solar-mining-wa.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/solar-mining-wa.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":27780,"url":"https:\/\/www.solarquotes.com.au\/blog\/australian-mine-solar-storage-mb0930\/","url_meta":{"origin":35224,"position":1},"title":"Australian Gold Mine Solar + Storage Project To Commence In May","author":"Michael Bloch","date":"February 7, 2019","format":false,"excerpt":"Gold Fields\u2019 Granny Smith gold mine east of Laverton in Western Australia will soon boast what's claimed to be one of the world's largest hybrid microgrids. Gold Fields had previously contracted Aggreko to design, construct and operate a solar power + battery storage system that will be integrated with an\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Granny Smith Gold Mine","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/gold-mine-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/gold-mine-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/gold-mine-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/gold-mine-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/02\/gold-mine-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":52588,"url":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/","url_meta":{"origin":35224,"position":2},"title":"Jabiru Hybrid Renewable Project Powering Ahead","author":"Michael Bloch","date":"August 3, 2021","format":false,"excerpt":"Clearing works have been completed for the construction of a new hybrid solar\/storage\/diesel power plant in the Northern Territory's Jabiru. Jabiru, around 250 kilometres east of Darwin and in the midst of Kakadu National Park, was a town purpose-built in the 1980's to service Energy Resources of Australia\u2019s (ERA\u2019s) Ranger\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Jabiru Hybrid Renewable Energy Project","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":39625,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-northern-minerals-mb1516\/","url_meta":{"origin":35224,"position":3},"title":"Solar + Storage For Northern Minerals Mining Project","author":"Michael Bloch","date":"May 8, 2020","format":false,"excerpt":"Soluna Australia and Northern Minerals have inked a letter of intent relating to the development of a solar power and battery storage facility at Northern Minerals' Browns Range operation in Western Australia. The Browns Range site is pretty much in the middle of nowhere - around 1,900 kilometres northeast of\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar and storage for Browns Range","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/solar-storage-browns-range.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/solar-storage-browns-range.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/solar-storage-browns-range.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/solar-storage-browns-range.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/solar-storage-browns-range.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":58216,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-battery-calidus-warrawoona-mb2328\/","url_meta":{"origin":35224,"position":4},"title":"Solar + Battery Storage For Another Australian Gold Miner","author":"Michael Bloch","date":"January 25, 2022","format":false,"excerpt":"Calidus Resources has inked an agreement with Zenith Pacific for the construction of a solar + battery storage facility that will help power the Warrawoona Gold Project in Western Australia. The Project is located in the Warrawoona region, approximately 150km southeast of Port Hedland and around 25km southeast of Marble\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Warrawoona Gold Project solar farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/calidus-solar-battery.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/calidus-solar-battery.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/calidus-solar-battery.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/calidus-solar-battery.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/calidus-solar-battery.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":37345,"url":"https:\/\/www.solarquotes.com.au\/blog\/oz-minerals-renewables-mb1406\/","url_meta":{"origin":35224,"position":5},"title":"OZ Minerals Eyes Renewables For Billion Dollar Mining Project","author":"Michael Bloch","date":"February 13, 2020","format":false,"excerpt":"OZ Minerals says renewable energy could help power its proposed West Musgrave copper and nickel project in Western Australia. The project, a joint venture between OZ Minerals (70%) and Cassini (30%), is located in the Musgrave Province of Western Australia and includes the Nebo-Babel nickel-copper and Succoth copper deposit. The\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Oz Mineral - West Musgrave","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/02\/oz-minerals-musgrave.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/02\/oz-minerals-musgrave.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/02\/oz-minerals-musgrave.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/02\/oz-minerals-musgrave.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/02\/oz-minerals-musgrave.png?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/35224","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=35224"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/35224\/revisions"}],"predecessor-version":[{"id":35227,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/35224\/revisions\/35227"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/35225"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=35224"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=35224"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=35224"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}