{"id":35270,"date":"2019-11-27T06:56:33","date_gmt":"2019-11-26T20:26:33","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=35270"},"modified":"2019-11-27T06:56:33","modified_gmt":"2019-11-26T20:26:33","slug":"der-register-delay-mb1308","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/","title":{"rendered":"Distributed Energy Resources Register Rollout Delayed"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-35271\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register.png\" alt=\"Distributed Energy Resources Register\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register.png 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register-300x158.png 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register-768x403.png 768w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register-1024x538.png 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Australia&#8217;s shiny new Distributed Energy Resources Register is having some technical problems, delaying implementation.<!--more--><\/p>\n<p>Distributed Energy Resources (DERs) are defined as consumer-owned devices connected to the grid that can generate or store electricity, or have the ability to actively manage energy demand.<\/p>\n<p>The Distributed Energy Resources Register is an initiative gathering greater detail of\u00a0 where and what DERs such as <a href=\"https:\/\/www.solarquotes.com.au\/solar101.html\">solar power<\/a> and <a href=\"https:\/\/www.solarquotes.com.au\/battery-storage\/comparison-table\/\">battery systems<\/a> are being connected to the mains grid. Currently, there is no single comprehensive database of these electricity generation and storage assets in Australia&#8217;s National Electricity Market (NEM), which consists of QLD, NSW, ACT, SA, TAS and VIC.<\/p>\n<p>The Register is being implemented for the NEM and is intended to assist Network Service Providers (NSPs) and the Australian Energy Market Operator (AEMO)\u00a0 in planning and operating the NEM power system as it continues in its transformation.<\/p>\n<p>For solar installers, the impact of the DER register will mean they will be required to provide additional information to NSPs regarding the installations they are performing. However, the AEMO says the system is designed to draw information from available data sets and installers will be mostly be asked to confirm information, rather than having to enter it.<\/p>\n<p>The Register will have no impact on solar buyers other than the fact NSPs and the AEMO will have more detail on their nature of their systems. This information will be subject to privacy laws and protected information provisions in the National Electricity Law. Implementation of the register will not change the connection process for customers when they have solar panels installed.<\/p>\n<p><a href=\"https:\/\/www.solarquotes.com.au\/blog\/solar-der-register-mb1282\/\">As we mentioned<\/a> a couple of weeks ago, the final rule on the DER Register was to come into effect on December 1, at which time solar installers would need to start using the system.<\/p>\n<h2>Technical Issues Delaying System Integration<\/h2>\n<p>The AEMO advised on Tuesday technical issues are delaying system integration testing between AEMO and NSPs that is necessary for the Register&#8217;s implementation.<\/p>\n<blockquote><p>&#8220;This impacts our full release of the DER Register system,&#8221; stated part of an email from the AEMO. &#8220;Further, we wish to advise that DER installers and electrical contractors that may be expected to provide data to the DER Register will not be required to do so until further notice.&#8221;<\/p><\/blockquote>\n<p>The AEMO advises installers to consult with their local NSP regarding when they should start providing information to the DER Register.<\/p>\n<p>Further information on the <a href=\"https:\/\/www.aemo.com.au\/Electricity\/National-Electricity-Market-NEM\/DER-program\">DER Register can be found here<\/a>, but at the time of publishing the section hadn&#8217;t been updated with details regarding the delay.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Australia&#8217;s shiny new Distributed Energy Resources Register is having some technical problems, delaying implementation.<\/p>\n","protected":false},"author":17,"featured_media":35271,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-35270","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Distributed Energy Resources Register Rollout Delayed<\/title>\n<meta name=\"description\" content=\"Australia&#039;s shiny new Distributed Energy Resources (DER) Register is having some technical problems, delaying implementation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Distributed Energy Resources Register Rollout Delayed\" \/>\n<meta property=\"og:description\" content=\"Australia&#039;s shiny new Distributed Energy Resources (DER) Register is having some technical problems, delaying implementation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-26T20:26:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Distributed Energy Resources Register Rollout Delayed\",\"datePublished\":\"2019-11-26T20:26:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/\"},\"wordCount\":429,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/der-register.png\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/\",\"name\":\"Distributed Energy Resources Register Rollout Delayed\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/der-register.png\",\"datePublished\":\"2019-11-26T20:26:33+00:00\",\"description\":\"Australia's shiny new Distributed Energy Resources (DER) Register is having some technical problems, delaying implementation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/der-register.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/der-register.png\",\"width\":1200,\"height\":630,\"caption\":\"Distributed Energy Resources Register\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/der-register-delay-mb1308\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/solar-battery-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Distributed Energy Resources Register Rollout Delayed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/michael\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Distributed Energy Resources Register Rollout Delayed","description":"Australia's shiny new Distributed Energy Resources (DER) Register is having some technical problems, delaying implementation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/","og_locale":"en_US","og_type":"article","og_title":"Distributed Energy Resources Register Rollout Delayed","og_description":"Australia's shiny new Distributed Energy Resources (DER) Register is having some technical problems, delaying implementation.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2019-11-26T20:26:33+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register.png","type":"image\/png"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Distributed Energy Resources Register Rollout Delayed","datePublished":"2019-11-26T20:26:33+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/"},"wordCount":429,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register.png","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/","url":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/","name":"Distributed Energy Resources Register Rollout Delayed","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register.png","datePublished":"2019-11-26T20:26:33+00:00","description":"Australia's shiny new Distributed Energy Resources (DER) Register is having some technical problems, delaying implementation.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register.png","width":1200,"height":630,"caption":"Distributed Energy Resources Register"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/der-register-delay-mb1308\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Distributed Energy Resources Register Rollout Delayed"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register.png","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-9aS","jetpack-related-posts":[{"id":34761,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-der-register-mb1282\/","url_meta":{"origin":35270,"position":0},"title":"Distributed Energy Resources Register Kickoff Approaches","author":"Michael Bloch","date":"November 7, 2019","format":false,"excerpt":"Starting December, solar installers operating in Australia's NEM states will be required to provide more information about their PV installations and battery installs. More than 2.2 million grid connected solar power systems have been installed across Australia to date, and home battery installations are picking up pace. The success of\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Distributed Energy Resources register","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/der-register-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":24355,"url":"https:\/\/www.solarquotes.com.au\/blog\/aemc-solar-battery-register-mb0751\/","url_meta":{"origin":35270,"position":1},"title":"Final Rule On National Solar And Battery Storage Register Published","author":"Michael Bloch","date":"September 19, 2018","format":false,"excerpt":"Last week the Australian Energy Market Commission released its final rule on establishing a distributed energy resources (DER) register for the National Electricity Market. The AEMC announced consultation on a national register in March this year. The exercise evolved from a rules change request back in 2016 from the COAG\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"National solar and battery database","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/09\/aemc-solar-battery-register.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/09\/aemc-solar-battery-register.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/09\/aemc-solar-battery-register.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/09\/aemc-solar-battery-register.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":20984,"url":"https:\/\/www.solarquotes.com.au\/blog\/cec-battery-database-mb0558\/","url_meta":{"origin":35270,"position":2},"title":"CEC : National Battery Register Likely To Fail","author":"Michael Bloch","date":"April 24, 2018","format":false,"excerpt":"The Clean Energy Council has warned a proposed national battery installation database will likely fail if the paperwork burden falls squarely on the shoulders of installers. As we mentioned last month, the COAG Energy Council had submitted a rule change request to the Australian Energy Market Commission (AEMC) to establish\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Australian national battery database","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/national-battery-database.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/national-battery-database.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/national-battery-database.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/national-battery-database.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":89224,"url":"https:\/\/www.solarquotes.com.au\/blog\/wa-project-jupiter-vpp-mb3107\/","url_meta":{"origin":35270,"position":3},"title":"Project Jupiter Promises Better VPP Programs In WA","author":"Michael Bloch","date":"January 31, 2025","format":false,"excerpt":"Federal funding has been announced for a project in Western Australia that will enable more owners of solar panels and home batteries to join Virtual Power Plants. The South West Interconnected System (SWIS) is the main electricity grid in Western Australia, servicing an area from Albany in the south to\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Project Jupiter - WA VPP initiative","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/01\/project-jupiter-vpp.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/01\/project-jupiter-vpp.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/01\/project-jupiter-vpp.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/01\/project-jupiter-vpp.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/01\/project-jupiter-vpp.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":33810,"url":"https:\/\/www.solarquotes.com.au\/blog\/rooftop-solar-aemc-mb1229\/","url_meta":{"origin":35270,"position":4},"title":"Crunch Time For Australian Rooftop Solar: AEMC","author":"Michael Bloch","date":"September 26, 2019","format":false,"excerpt":"Rooftop solar penetration has reached a stage in Australia where big decisions need to be made by electricity distribution network businesses says the Australian Energy Market Commission (AEMC). In a new report released this morning, the AEMC is calling on electricity distributors to deliver the \"grid of the future\" in\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"AEMC - Rooftop solar power","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/aemc-rooftop-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/aemc-rooftop-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/aemc-rooftop-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/aemc-rooftop-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/aemc-rooftop-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":18471,"url":"https:\/\/www.solarquotes.com.au\/blog\/monash-university-microgrid-mb0420\/","url_meta":{"origin":35270,"position":5},"title":"InGRID AGM Energy Control System To Manage Monash Uni Microgrid","author":"Michael Bloch","date":"January 18, 2018","format":false,"excerpt":"Madrid-based Indra says it has been selected by Melbourne's Monash University as a key technology partner in MU's Clayton campus solar powered microgrid project. A microgrid is a local network of electricity generation sources connected to the mains grid that can also operate while disconnected from it (\"island mode\"), continuing\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar panels at Monash University, Melbourne","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-panels-monash-university.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-panels-monash-university.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-panels-monash-university.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-panels-monash-university.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/35270","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=35270"}],"version-history":[{"count":3,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/35270\/revisions"}],"predecessor-version":[{"id":35275,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/35270\/revisions\/35275"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/35271"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=35270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=35270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=35270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}