{"id":39511,"date":"2020-05-05T07:04:51","date_gmt":"2020-05-04T20:34:51","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=39511"},"modified":"2024-06-05T15:31:49","modified_gmt":"2024-06-05T06:01:49","slug":"areh-epa-approval-mb1510","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/","title":{"rendered":"WA EPA Thumbs Up For Asian Renewable Energy Hub"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-39512\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub.jpg\" alt=\"Asian Renewable Energy Hub\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>A proposed huge wind and solar energy project in Western Australia&#8217;s East Pilbara region looks like it has cleared another hurdle, subject to conditions.<!--more--><\/p>\n<p>The Asian Renewable Energy Hub (AREH) will feature (at this stage &#8211; the numbers have changed a few times) up to 1,743 wind turbines and a 2,000 megawatt solar farm. That&#8217;s a lot of <a href=\"https:\/\/www.solarquotes.com.au\/panels\/\">solar panels<\/a> &#8211; based on 400 watts each, it would work out to around 5 million modules. But given the project isn&#8217;t slated to start construction until 2026 if it is to go ahead, individual solar panel capacity could be significantly more by then.<\/p>\n<p>Among other aspects of the project are 14km of transmission lines to the coast, four high voltage direct current (HVDC) cables offshore and up to 1,514 km of site access tracks. There will also be temporary construction compounds, including accommodation. Around 3,000 workers will be needed during the 10 year construction period, and approximately 400 for ongoing positions once construction is done and dusted.<\/p>\n<p>It&#8217;s just a massive project by any benchmark &#8211; the development envelope is 662,400 ha.<\/p>\n<p>There are various permissions and approvals the project needs to proceed, including the blessing of Western Australia&#8217;s Environmental Protection Authority (EPA). The EPA&#8217;s environmental impact assessment of the Asian Renewable Energy Hub was released yesterday.<\/p>\n<p>One of the thorny issues associated with the development is the area that will need to be cleared of native vegetation &#8211; up from 7,370 ha to 11,962 ha. While vegetation is reasonably sparse in the region, that makes it all the more valuable. This isn&#8217;t just with regard to the vegetation itself, but for the animals that depend on it. For example, the 11,962 ha includes 11,147 ha of &#8220;bilby preferred shrub and spinifex on sandplain habitat&#8221;.<\/p>\n<p><img decoding=\"async\" class=\"size-full wp-image-39513 aligncenter\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/bilby.jpg\" alt=\"Bilby\" width=\"700\" height=\"419\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/bilby.jpg 700w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/bilby-300x180.jpg 300w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/p>\n<p>But given the habits of the bilby, the EPA says 98 per cent of the development envelope following construction will contain suitable habitat for both bilby burrow construction and will support plant species known to be important in its diet.<\/p>\n<p>The bilby is only one of a number of animals the EPA has taken into consideration and the Authority has recommended conditions requiring actions to be carried out to mitigate related risks, all of which can be <a href=\"https:\/\/bit.ly\/3c2AtzY\">viewed in this document<\/a> along with the EPA&#8217;s reasoning. These also include recommendations\/conditions concerning the off-shore aspect of the project.<\/p>\n<p>The WA EPA&#8217;s report is subject to an appeals period that ends on the 18th of this month and the final decision on the proposed project will be made by Western Australia&#8217;s Environment Minister.<\/p>\n<h2>Exporting Electricity Overseas<\/h2>\n<p>The AREH web site states up to 3,000 MW of the project&#8217;s generation capacity will be dedicated to large energy users in the Pilbara region. But the bulk of the power will enable large scale production of <a href=\"https:\/\/www.solarquotes.com.au\/blog\/?s=hydrogen\"> hydrogen<\/a> products for domestic and export markets. However, AREH will also <a href=\"https:\/\/www.solarquotes.com.au\/blog\/areh-wind-solar-storage-mb1054\/\">export electricity overseas<\/a>. <a href=\"https:\/\/asianrehub.com\/wp-content\/uploads\/2019\/05\/Appendix-3-Marine-Cable-Route-Environmental-Impact-Assessment-Rev-0.pdf\">This document<\/a> from 2018 notes:<\/p>\n<blockquote><p>&#8220;The Proposal will supply large energy users in the Pilbara, export power via HDVC cable to South-East Asia, and produce green hydrogen for domestic and export customers.&#8221;<\/p><\/blockquote>\n<p>Another even bigger solar project in Australia involving overseas electricity exports via HVDC is the massive <a href=\"https:\/\/www.solarquotes.com.au\/blog\/suncable-hvdc\/\">Sun Cable venture<\/a>.<\/p>\n<p>Assuming the AREH project can secure the approvals it needs, a financial decision as to its future is expected to be made in 2025.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A proposed huge wind and solar energy project in Western Australia&#8217;s East Pilbara region looks like it has cleared another hurdle, subject to conditions.<\/p>\n","protected":false},"author":17,"featured_media":39512,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-39511","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>WA EPA Thumbs Up For Asian Renewable Energy Hub<\/title>\n<meta name=\"description\" content=\"A proposed huge wind and solar energy project in Western Australia&#039;s East Pilbara region looks like it has cleared another hurdle, subject to conditions\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"WA EPA Thumbs Up For Asian Renewable Energy Hub\" \/>\n<meta property=\"og:description\" content=\"A proposed huge wind and solar energy project in Western Australia&#039;s East Pilbara region looks like it has cleared another hurdle, subject to conditions\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-05-04T20:34:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-06-05T06:01:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"WA EPA Thumbs Up For Asian Renewable Energy Hub\",\"datePublished\":\"2020-05-04T20:34:51+00:00\",\"dateModified\":\"2024-06-05T06:01:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/\"},\"wordCount\":557,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/asian-renewable-energy-hub.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/\",\"name\":\"WA EPA Thumbs Up For Asian Renewable Energy Hub\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/asian-renewable-energy-hub.jpg\",\"datePublished\":\"2020-05-04T20:34:51+00:00\",\"dateModified\":\"2024-06-05T06:01:49+00:00\",\"description\":\"A proposed huge wind and solar energy project in Western Australia's East Pilbara region looks like it has cleared another hurdle, subject to conditions\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/asian-renewable-energy-hub.jpg\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/asian-renewable-energy-hub.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Asian Renewable Energy Hub\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/areh-epa-approval-mb1510\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/solar-battery-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"WA EPA Thumbs Up For Asian Renewable Energy Hub\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/michael\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"WA EPA Thumbs Up For Asian Renewable Energy Hub","description":"A proposed huge wind and solar energy project in Western Australia's East Pilbara region looks like it has cleared another hurdle, subject to conditions","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/","og_locale":"en_US","og_type":"article","og_title":"WA EPA Thumbs Up For Asian Renewable Energy Hub","og_description":"A proposed huge wind and solar energy project in Western Australia's East Pilbara region looks like it has cleared another hurdle, subject to conditions","og_url":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2020-05-04T20:34:51+00:00","article_modified_time":"2024-06-05T06:01:49+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"WA EPA Thumbs Up For Asian Renewable Energy Hub","datePublished":"2020-05-04T20:34:51+00:00","dateModified":"2024-06-05T06:01:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/"},"wordCount":557,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/","url":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/","name":"WA EPA Thumbs Up For Asian Renewable Energy Hub","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub.jpg","datePublished":"2020-05-04T20:34:51+00:00","dateModified":"2024-06-05T06:01:49+00:00","description":"A proposed huge wind and solar energy project in Western Australia's East Pilbara region looks like it has cleared another hurdle, subject to conditions","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub.jpg","width":1200,"height":630,"caption":"Asian Renewable Energy Hub"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/areh-epa-approval-mb1510\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"WA EPA Thumbs Up For Asian Renewable Energy Hub"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/05\/asian-renewable-energy-hub.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-ahh","jetpack-related-posts":[{"id":17174,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-wind-pilbara-mb0335\/","url_meta":{"origin":39511,"position":0},"title":"6GW Wind And Solar Power Facility For Western Australia&#8217;s Pilbara","author":"Michael Bloch","date":"November 30, 2017","format":false,"excerpt":"A consortium has announced a proposed wind and solar power plant of up to 6 gigawatts capacity in Western Australia's East Pilbara region that will export electricity to Indonesia. As we mentioned earlier today, demand for electricity in Indonesia is growing rapidly. The country has set a renewable energy target\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Asian Renewable Energy Hub (AREH)","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/asian-renewable-energy-hub.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/asian-renewable-energy-hub.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/asian-renewable-energy-hub.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/asian-renewable-energy-hub.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":30325,"url":"https:\/\/www.solarquotes.com.au\/blog\/areh-wind-solar-storage-mb1054\/","url_meta":{"origin":39511,"position":1},"title":"Public Comment Opens For WA&#8217;s Huge Wind, Solar And Storage Project","author":"Michael Bloch","date":"May 15, 2019","format":false,"excerpt":"The Environmental Review Document for the Asian Renewable Energy Hub (AREH), an 11+ GW wind\/solar project with storage proposed for Western Australia, has been made available for public comment. The AREH web site states the overall project area will occupy 7,000 square kilometres in the East Pilbara region of Western\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Asian Renewable Energy Hub","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/areh-solar-wind-storage.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/areh-solar-wind-storage.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/areh-solar-wind-storage.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/areh-solar-wind-storage.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/areh-solar-wind-storage.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":17496,"url":"https:\/\/www.solarquotes.com.au\/blog\/flinders-hybrid-energy-mb0357\/","url_meta":{"origin":39511,"position":2},"title":"Flinders Island Hybrid Energy Hub Officially Opened","author":"Michael Bloch","date":"December 12, 2017","format":false,"excerpt":"The residents of Flinders Island now have a cleaner electricity supply - the island's $13.38 million Hybrid Energy Hub was officially opened yesterday. Flinders Island is a 1,367-square-kilometre island northeast of Tasmania in Bass Strait. It has a population of 833 according to the 2016 census.\u00a0 To this point, Flinders\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Flinders Island - Wind And Solar Power","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/12\/flinders-island-hybrid-energy.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/12\/flinders-island-hybrid-energy.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/12\/flinders-island-hybrid-energy.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/12\/flinders-island-hybrid-energy.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":21245,"url":"https:\/\/www.solarquotes.com.au\/blog\/harlin-queensland-solar-farm-mb0574\/","url_meta":{"origin":39511,"position":3},"title":"Application Lodged For 1,500 MW Solar Farm In Queensland","author":"Michael Bloch","date":"May 7, 2018","format":false,"excerpt":"Queensland's Somerset Regional Council has acknowledged it has received a development application for a 1,500 megawatt solar farm to be built east of Harlin. Harlin is a small town in south east Queensland, approximately 130 kilometres north west of Brisbane. Somerset Mayor Graeme Lehmann says the development application includes two\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"1,500 megawatt solar farm - Queensland","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/solar-farm-harlin.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/solar-farm-harlin.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/solar-farm-harlin.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/solar-farm-harlin.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":18637,"url":"https:\/\/www.solarquotes.com.au\/blog\/solarreserve-solar-thermal-australia-mb0429\/","url_meta":{"origin":39511,"position":4},"title":"SolarReserve Opens Offices In South Australia","author":"Michael Bloch","date":"January 24, 2018","format":false,"excerpt":"SolarReserve, the company that will develop the Aurora solar thermal power station project near Port Augusta, officially opened two offices in South Australia yesterday. SolarReserve has established its Australian headquarters in Flinders Street, Adelaide and a field office in Commercial Road, Port Augusta. The company's Adelaide team will be focused\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Aurora solar thermal power plant","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/aurora-solar-power.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/aurora-solar-power.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/aurora-solar-power.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/aurora-solar-power.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":27062,"url":"https:\/\/www.solarquotes.com.au\/blog\/kidston-solar-energy-generation-mb0895\/","url_meta":{"origin":39511,"position":5},"title":"Kidston Cranking A Heap Of Solar Electricity Goodness &#8211; And Cash","author":"Michael Bloch","date":"January 11, 2019","format":false,"excerpt":"Genex Power has released a revenue update for its 50MW Kidston Solar Project (KS1) in North Queensland, along with some energy generation statistics. Located 270 kilometres north-west of Townsville and built on the\u00a0 tailings storage facility of the closed Kidston Gold Mine, KS1 boasts 540,000 solar panels mounted on single\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Kidston solar energy project","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/kidston-solar-power.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/kidston-solar-power.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/kidston-solar-power.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/kidston-solar-power.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/39511","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=39511"}],"version-history":[{"count":7,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/39511\/revisions"}],"predecessor-version":[{"id":84343,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/39511\/revisions\/84343"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/39512"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=39511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=39511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=39511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}