{"id":40743,"date":"2020-06-23T06:25:46","date_gmt":"2020-06-22T19:55:46","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=40743"},"modified":"2020-06-23T06:25:46","modified_gmt":"2020-06-22T19:55:46","slug":"yanco-solar-farm-mb1573","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/","title":{"rendered":"Proposed NSW Solar + Storage Facility On The Fast-Track"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-40744\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg\" alt=\"Yanco Solar Farm\" width=\"1200\" height=\"636\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm-300x159.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm-1024x543.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm-768x407.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>NSW Premier Gladys Berejiklian yesterday announced another 19 projects will have their assessments fast-tracked through the Planning System Acceleration Program; one of which is a solar farm.<!--more--><\/p>\n<p>Part of a NSW COVID-19 economic recovery response, <a href=\"https:\/\/www.planning.nsw.gov.au\/Policy-and-Legislation\/COVID19-response\/Planning-System-Acceleration-Program\">the Program<\/a> seeks to cut red tape and accelerate assessment processes to boost the state&#8217;s construction pipeline and fast-track construction of new projects.<\/p>\n<p>In order to be considered for the program, a development application or rezoning must already be in the state\u2019s system, the project must deliver a public benefit, and create construction and ongoing jobs. For a State Significant Development, the project must be able to commence construction within six months.<\/p>\n<p>A PV project that scored a guernsey yesterday is Germany&#8217;s Ib Vogt&#8217;s Yanco Solar Farm &#8211; the first large-scale solar energy facility to be included in the program. The proposed 72MW (DC) \/ 60MW (AC) facility, which will also include battery storage, is to be built around 5 kilometres south of <a href=\"https:\/\/www.solarquotes.com.au\/location\/leeton-2705-nsw\/\">Leeton<\/a> on the outskirts of the town of Yanco.<\/p>\n<p>When we last checked in with the project <a href=\"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-leeton-mb1031\/\">in April 2019<\/a>, it was just beginning its exhibition period. The NSW <a href=\"https:\/\/www.planningportal.nsw.gov.au\/major-projects\/project\/9391\"> Major Projects site<\/a> currently shows it as being in the assessment phase.<\/p>\n<h2>The World&#8217;s Most Powerful Solar Panels?<\/h2>\n<p>This month, an <a href=\"https:\/\/majorprojects.planningportal.nsw.gov.au\/prweb\/PRRestService\/mp\/01\/getContent?AttachRef=SSD-9515%2120200616T214305.585%20GMT\">amendments document<\/a> was lodged for the project, indicating Ib Vogt is now considering using solar panels with a higher wattage than was originally anticipated during preliminary design stages. The total capacity of Yanco Solar Farm will remain the same, but the number of solar panels installed will be reduced from approximately &#8220;20,500&#8221; to &#8220;17,000&#8221; modules.<\/p>\n<p>This works out to the new panels being around 4,200 watts each. But such a beast of a panel doesn&#8217;t yet exist, nor will it ever. It&#8217;s safe to assume a couple of typos came into play and that should have read from *205,000* down to *170,000* solar panels; making the modules a much more modest (and readily available) ~420 watts each.<\/p>\n<p>The reduction in the number of solar panels will mean one lot of land &#8211; which currently hosts a well-established orange orchard &#8211; won&#8217;t be touched.<\/p>\n<p>As for battery storage, the number of inverter stations and battery units has been reduced from 17 back to 14. There still doesn&#8217;t appear to be any indication as to what sort of capacity the battery storage aspect involves.<\/p>\n<p>On the employment side of things, up to 120 direct jobs would be created during the construction phase and 2-3 full time positions during Yanco Solar Farm&#8217;s 25 &#8211; 30 year operational phase.<\/p>\n<p>Ib Vogt had originally hoped to gain development approval mid to late last year and\u00a0 wanted to get cracking on construction early this year, so news of inclusion has no doubt been well-received by the company. What remains to be seen is if the project gets a green light, as inclusion in the program doesn&#8217;t guarantee a successful outcome.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NSW Premier Gladys Berejiklian yesterday announced another 19 projects will have their assessments fast-tracked through the Planning System Acceleration Program; one of which is a solar farm.<\/p>\n","protected":false},"author":17,"featured_media":40744,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-40743","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Proposed NSW Solar + Storage Facility On The Fast-Track<\/title>\n<meta name=\"description\" content=\"A solar farm is among another 19 projects that will have their assessments fast-tracked through New South Wales&#039; Planning System Acceleration Program.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Proposed NSW Solar + Storage Facility On The Fast-Track\" \/>\n<meta property=\"og:description\" content=\"A solar farm is among another 19 projects that will have their assessments fast-tracked through New South Wales&#039; Planning System Acceleration Program.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-06-22T19:55:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"636\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Proposed NSW Solar + Storage Facility On The Fast-Track\",\"datePublished\":\"2020-06-22T19:55:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/\"},\"wordCount\":486,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/\",\"name\":\"Proposed NSW Solar + Storage Facility On The Fast-Track\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg\",\"datePublished\":\"2020-06-22T19:55:46+00:00\",\"description\":\"A solar farm is among another 19 projects that will have their assessments fast-tracked through New South Wales' Planning System Acceleration Program.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg\",\"width\":1200,\"height\":636,\"caption\":\"Yanco Solar Farm\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Proposed NSW Solar + Storage Facility On The Fast-Track\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Proposed NSW Solar + Storage Facility On The Fast-Track","description":"A solar farm is among another 19 projects that will have their assessments fast-tracked through New South Wales' Planning System Acceleration Program.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/","og_locale":"en_US","og_type":"article","og_title":"Proposed NSW Solar + Storage Facility On The Fast-Track","og_description":"A solar farm is among another 19 projects that will have their assessments fast-tracked through New South Wales' Planning System Acceleration Program.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2020-06-22T19:55:46+00:00","og_image":[{"width":1200,"height":636,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Proposed NSW Solar + Storage Facility On The Fast-Track","datePublished":"2020-06-22T19:55:46+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/"},"wordCount":486,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/","url":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/","name":"Proposed NSW Solar + Storage Facility On The Fast-Track","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg","datePublished":"2020-06-22T19:55:46+00:00","description":"A solar farm is among another 19 projects that will have their assessments fast-tracked through New South Wales' Planning System Acceleration Program.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg","width":1200,"height":636,"caption":"Yanco Solar Farm"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/yanco-solar-farm-mb1573\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Proposed NSW Solar + Storage Facility On The Fast-Track"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/06\/yanco-solar-farm.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-aB9","jetpack-related-posts":[{"id":22232,"url":"https:\/\/www.solarquotes.com.au\/blog\/nsw-solar-farms-eis-mb0624\/","url_meta":{"origin":40743,"position":0},"title":"EIS Exhibition Period Begins For NSW Large-Scale Solar Power Projects","author":"Michael Bloch","date":"June 13, 2018","format":false,"excerpt":"The Environmental Impact Statements (EIS) have gone on display for two large scale solar farm developments in New South Wales - Orange Grove Solar and Suntop Solar Farm. Orange Grove Solar Overland Sun Farming Pty Ltd is proposing a 110MW facility to be constructed around 12km east of Gunnedah, in\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"NSW solar farms","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/06\/nsw-solar-farms.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":52133,"url":"https:\/\/www.solarquotes.com.au\/blog\/stubbo-solar-farm-approved-mb2079\/","url_meta":{"origin":40743,"position":1},"title":"Green Light For 400MW Solar, 200MWh Battery Facility In NSW","author":"Michael Bloch","date":"July 16, 2021","format":false,"excerpt":"A huge solar power and battery storage facility for New South Wales' Mid-Western Regional Council area has been given the State Government's blessing. We last mentioned UPC\/AC Renewables Australia's[1. A joint venture between UPC Renewables Group and AC Energy] proposed Stubbo Solar Farm project in April last year after a\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Stubbo Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/stubbo-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/stubbo-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/stubbo-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/stubbo-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/stubbo-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":13569,"url":"https:\/\/www.solarquotes.com.au\/blog\/large-scale-solar-nsw-mb0143\/","url_meta":{"origin":40743,"position":2},"title":"Green Light For More Large-Scale Solar Projects In New South Wales","author":"Michael Bloch","date":"July 28, 2017","format":false,"excerpt":"NSW Department of Planning and Environment has approved four major solar power projects to be constructed in the west of the state. With a collective capacity of 275 MW, the new clean energy facilities will generate enough electricity to power the equivalent of more than 100,000 homes. The Department says\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Large scale solar power in NSW","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/07\/solar-farms-nsw.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/07\/solar-farms-nsw.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/07\/solar-farms-nsw.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/07\/solar-farms-nsw.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":69799,"url":"https:\/\/www.solarquotes.com.au\/blog\/stubbo-solar-epc-mb2786\/","url_meta":{"origin":40743,"position":3},"title":"PCL Construction Scores Stubbo Solar Farm EPC","author":"Michael Bloch","date":"January 11, 2023","format":false,"excerpt":"There's been more progress on ACEN Australia's huge Stubbo Solar project in New South Wales, with the Engineering, Procurement and Construction (EPC) contract now awarded. Stubbo Solar will be a 400 MW PV power station situated around 10 kilometres north of Gulgong in the Mid-Western Regional Council local government area.\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Stubbo Solar","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/stubbo-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/stubbo-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/stubbo-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/stubbo-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/stubbo-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":18451,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-projects-nsw-mb0420\/","url_meta":{"origin":40743,"position":4},"title":"Solar + Storage Projects For NSW Riverina Region Seeking Approvals","author":"Michael Bloch","date":"January 18, 2018","format":false,"excerpt":"Submissions relating to two proposed large-scale solar + battery storage facilities in the Edward River Council area in New South Wales are currently being reviewed. Both are RES Group projects to be built not far from Deniliquin. Currawarra Solar Farm To be constructed around 25km north east of Deniliquin, Currawarra\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"RES solar and battery storage projects","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/res-solar-storage.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/res-solar-storage.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/res-solar-storage.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/res-solar-storage.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":25518,"url":"https:\/\/www.solarquotes.com.au\/blog\/nsw-emerging-energy-mb0807\/","url_meta":{"origin":40743,"position":5},"title":"NSW Finally Emerging On Energy?","author":"Michael Bloch","date":"November 1, 2018","format":false,"excerpt":"The NSW Government announced its Emerging Energy program yesterday that will support commercialisation of new, large\u2011scale, electricity projects in the state using emerging, dispatchable technology.\u00a0 The program was launched at a briefing yesterday, which according to New South Wales Minister for Resources, Energy and Utilities Don Harwin was well attended.\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"New South Wales Emerging Energy","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/nsw-emerging-energy.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/nsw-emerging-energy.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/nsw-emerging-energy.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/nsw-emerging-energy.png?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/40743","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=40743"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/40743\/revisions"}],"predecessor-version":[{"id":40746,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/40743\/revisions\/40746"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/40744"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=40743"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=40743"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=40743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}