{"id":41927,"date":"2020-08-04T12:20:55","date_gmt":"2020-08-04T01:50:55","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=41927"},"modified":"2020-08-04T14:42:58","modified_gmt":"2020-08-04T04:12:58","slug":"inverter-low-voltage-ride-through","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/","title":{"rendered":"SA Australia&#8217;s Guinea Pig For Inverter Low Voltage Ride-through Procedure"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone wp-image-41931 size-full\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg\" alt=\"Inverter Low Voltage Ride-through\" width=\"1200\" height=\"628\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test-300x157.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test-1024x536.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test-768x402.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Friends, it\u2019s arrived: the Australian Energy Market Operator has published its standard low voltage ride-through test procedure for inverters.<!--more--><\/p>\n<p>As we <a href=\"https:\/\/www.solarquotes.com.au\/blog\/cec-sec-smarter-homes-mb1600\/\">previously informed<\/a> our readers, South Australia\u00a0made its <a href=\"https:\/\/www.solarquotes.com.au\/blog\/sa-meter-inverter-regulations\/\">regulatory plans<\/a> in the expectation that the test would be mandated soon. As expected, the \u201cShort duration undervoltage response test\u201d, published\u00a0<a href=\"https:\/\/aemo.com.au\/-\/media\/files\/electricity\/nem\/der\/2020\/vdrt-test-procedure.pdf\">here<\/a> (PDF), will be mandated as of September.<\/p>\n<p><strong>That means that &#8211; as it stands &#8211; no inverter can be installed in South Australia from September unless it has passed this testing procedure. That&#8217;s less than 3 weeks from now folks!<\/strong><\/p>\n<p>The aim is to verify that grid-connected inverters can survive brief undervoltage disturbances*. As commenter Jonathon Dore explained (correcting my original misreading of the standard &#8211; thanks, Jonathon, I&#8217;m new to electricity documents!):<\/p>\n<p>&#8220;There is one test at 180V and another test at 50V.<\/p>\n<p>&#8220;Specifically, one test to ensure that the inverter disconnects after 1s at just under 180V and another test to ensure that the inverter can ride through 220ms at 50V (i.e. maintains power output or re-establishes power output within 1s of the dip).&#8221;<\/p>\n<p>The note is intended to be read in conjunction with AS\/NZS 4777.2:2015, so the undervoltage test document is mercifully short, stipulating:<\/p>\n<ul>\n<li><b>Test conditions &#8211; <\/b>RMS voltage tolerance, and grid test voltage tolerance;<\/li>\n<li><b>Inverter setup &#8211; <\/b>including recording and photographing the test setup for verification. The setup diagram is shown below; and<\/li>\n<li><b>Test procedure &#8211; <\/b>testing the system\u2019s response to undervoltage shorter and longer than the 220 ms set in the standard.<\/li>\n<\/ul>\n<div id=\"attachment_41928\" style=\"width: 1213px\" class=\"wp-caption alignnone\"><img decoding=\"async\" aria-describedby=\"caption-attachment-41928\" class=\"wp-image-41928 size-full\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/Inverter-setup.png\" alt=\"Inverter ride-through test setup. Source: AEMO\" width=\"1203\" height=\"456\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/Inverter-setup.png 1203w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/Inverter-setup-300x114.png 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/Inverter-setup-1024x388.png 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/Inverter-setup-768x291.png 768w\" sizes=\"(max-width: 1203px) 100vw, 1203px\" \/><p id=\"caption-attachment-41928\" class=\"wp-caption-text\">Inverter ride-through test setup. Source: AEMO<\/p><\/div>\n<p>As we\u2019ve previously reported, technical detail aside, the move to implement the standard so quickly hasn\u2019t been welcomed by the industry.<\/p>\n<p>Last month, Michael <a href=\"https:\/\/www.solarquotes.com.au\/blog\/cec-sec-smarter-homes-mb1600\/\">mentioned<\/a> the Clean Energy Council\u2019s concern that \u201cthe timeframe for low voltage ride-through requirements was oblivious to the practical limitations of test laboratories to undertake the testing required\u201d.<\/p>\n<p>The Smart Energy Council was also worried about the September 2020 implementation timeframe, calling it \u201cunworkable\u201d.<\/p>\n<blockquote><p>\u201cIt is unclear how some of the proposals will be implemented, who will pay for the changes and how the proposed changes will be enforced\u201d, the SEC said at the time.<\/p><\/blockquote>\n<p>Regardless, South Australia\u00a0<a href=\"https:\/\/www.solarquotes.com.au\/blog\/sa-meter-inverter-regulations\/\">pushed ahead<\/a> with its Smarter Homes proposal &#8211; which will rely on the inverter test, as well as specifications for remote connect\/disconnect and its mandate for two-element, two contact smart meters.<\/p>\n<p>The questions for vendors, resellers and installers is whether their inventory can meet the requirements and therefore stay on sale in South Australia &#8211; and if not, is it something that can be solved with a firmware update? Other states will be watching South Australia with interest.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Friends, it\u2019s arrived: the Australian Energy Market Operator has published its standard low voltage ride-through test procedure for inverters.<\/p>\n","protected":false},"author":23,"featured_media":41931,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[48],"tags":[],"class_list":["post-41927","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-inverters","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Inverter Low Voltage Ride-through Procedure Lands. SA To Be Test Bed.<\/title>\n<meta name=\"description\" content=\"As it stands - no solar inverter can be installed in South Australia from September unless it passes this testing procedure - less than 3 weeks from now!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SA Australia&#039;s Guinea Pig For Inverter Low Voltage Ride-through Procedure\" \/>\n<meta property=\"og:description\" content=\"As it stands - no solar inverter can be installed in South Australia from September unless it passes this testing procedure - less than 3 weeks from now!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-04T01:50:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-08-04T04:12:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Richard Chirgwin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/\"},\"author\":{\"name\":\"Richard Chirgwin\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/d2e4d6f75c9033945224b9de834d9be6\"},\"headline\":\"SA Australia&#8217;s Guinea Pig For Inverter Low Voltage Ride-through Procedure\",\"datePublished\":\"2020-08-04T01:50:55+00:00\",\"dateModified\":\"2020-08-04T04:12:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/\"},\"wordCount\":458,\"commentCount\":4,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg\",\"articleSection\":[\"Solar Inverters\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/\",\"name\":\"Inverter Low Voltage Ride-through Procedure Lands. SA To Be Test Bed.\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg\",\"datePublished\":\"2020-08-04T01:50:55+00:00\",\"dateModified\":\"2020-08-04T04:12:58+00:00\",\"description\":\"As it stands - no solar inverter can be installed in South Australia from September unless it passes this testing procedure - less than 3 weeks from now!\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg\",\"width\":1200,\"height\":628,\"caption\":\"Inverter Low Voltage Ride-through\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Solar Inverters\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-inverters\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SA Australia&#8217;s Guinea Pig For Inverter Low Voltage Ride-through Procedure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/d2e4d6f75c9033945224b9de834d9be6\",\"name\":\"Richard Chirgwin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r\",\"caption\":\"Richard Chirgwin\"},\"description\":\"Joining the SolarQuotes blog team in 2019, Richard is a journalist with more than 30 years of experience covering a wide range of technology topics, including electronics, telecommunications, computing, science and solar. When not writing for us, he runs a solar-powered off-grid eco-resort in NSW\u2019s blue mountains. Read Richard's full bio.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/rchirgwin\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Inverter Low Voltage Ride-through Procedure Lands. SA To Be Test Bed.","description":"As it stands - no solar inverter can be installed in South Australia from September unless it passes this testing procedure - less than 3 weeks from now!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/","og_locale":"en_US","og_type":"article","og_title":"SA Australia's Guinea Pig For Inverter Low Voltage Ride-through Procedure","og_description":"As it stands - no solar inverter can be installed in South Australia from September unless it passes this testing procedure - less than 3 weeks from now!","og_url":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2020-08-04T01:50:55+00:00","article_modified_time":"2020-08-04T04:12:58+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg","type":"image\/jpeg"}],"author":"Richard Chirgwin","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/"},"author":{"name":"Richard Chirgwin","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/d2e4d6f75c9033945224b9de834d9be6"},"headline":"SA Australia&#8217;s Guinea Pig For Inverter Low Voltage Ride-through Procedure","datePublished":"2020-08-04T01:50:55+00:00","dateModified":"2020-08-04T04:12:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/"},"wordCount":458,"commentCount":4,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg","articleSection":["Solar Inverters"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/","url":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/","name":"Inverter Low Voltage Ride-through Procedure Lands. SA To Be Test Bed.","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg","datePublished":"2020-08-04T01:50:55+00:00","dateModified":"2020-08-04T04:12:58+00:00","description":"As it stands - no solar inverter can be installed in South Australia from September unless it passes this testing procedure - less than 3 weeks from now!","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg","width":1200,"height":628,"caption":"Inverter Low Voltage Ride-through"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/inverter-low-voltage-ride-through\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"Solar Inverters","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-inverters\/"},{"@type":"ListItem","position":3,"name":"SA Australia&#8217;s Guinea Pig For Inverter Low Voltage Ride-through Procedure"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/d2e4d6f75c9033945224b9de834d9be6","name":"Richard Chirgwin","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r","caption":"Richard Chirgwin"},"description":"Joining the SolarQuotes blog team in 2019, Richard is a journalist with more than 30 years of experience covering a wide range of technology topics, including electronics, telecommunications, computing, science and solar. When not writing for us, he runs a solar-powered off-grid eco-resort in NSW\u2019s blue mountains. Read Richard's full bio.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/rchirgwin\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/inverter-test.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-aUf","jetpack-related-posts":[{"id":42276,"url":"https:\/\/www.solarquotes.com.au\/blog\/sapn-inverter-replacements-mb1645\/","url_meta":{"origin":41927,"position":0},"title":"SAPN Reviews Position On Solar Inverter Replacements Under Warranty","author":"Michael Bloch","date":"August 17, 2020","format":false,"excerpt":"In light of an inverter rule change in South Australia kicking in from September this year, SA Power Networks has altered its requirements relating to like-for-like solar inverter replacements carried out under warranty. The SA Government's consultation period for proposed new South Australian electricity meter and inverter rules finished up\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"SAPN and solar inverters","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sapn-inverter-replacements.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sapn-inverter-replacements.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sapn-inverter-replacements.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sapn-inverter-replacements.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sapn-inverter-replacements.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":42404,"url":"https:\/\/www.solarquotes.com.au\/blog\/sa-inverter-rule-chaos-mb1652\/","url_meta":{"origin":41927,"position":1},"title":"South Australia&#8217;s Rushed Solar Inverter Rule A Shitstorm","author":"Michael Bloch","date":"August 21, 2020","format":false,"excerpt":"The South Australian Government's rush to implement new rules under its \"Smarter Homes\" push has resulted in chaos for the state's solar sector, with no reasonable end currently in sight. One of the new rules to come into effect from September 28 causing the most angst involves new inverters connected\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"South Australia solar inverter rule","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sa-inverter-rule.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sa-inverter-rule.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sa-inverter-rule.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sa-inverter-rule.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sa-inverter-rule.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":26122,"url":"https:\/\/www.solarquotes.com.au\/blog\/sma-solar-australia-mb0839\/","url_meta":{"origin":41927,"position":2},"title":"Utility Scale Solar A Bright Spot For SMA In Australia","author":"Michael Bloch","date":"November 27, 2018","format":false,"excerpt":"SMA Solar Technology AG says the company will have commissioned 1.8GW of solar inverter capacity\u00a0associated with utility scale projects in Australia this year.\u00a0 It's been a huge year at this end of the solar sector for the company in Australia, as 2018 will bring SMA\u2019s total utility-scale PV power plant\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"SMA inverters - solar power in Australia","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/sma-australia-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/sma-australia-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/sma-australia-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/sma-australia-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":47903,"url":"https:\/\/www.solarquotes.com.au\/blog\/aemc-solar-inverters-mb1894\/","url_meta":{"origin":41927,"position":3},"title":"AEMC Introducing New Solar Inverter Standards","author":"Michael Bloch","date":"February 25, 2021","format":false,"excerpt":"Where South Australia has already gone with some solar inverter standards, most other states will follow by the end of this year. The Australian Energy Market Commission announced this morning compulsory new standards will come into effect in for new and upgraded solar power systems in Queensland, New South Wales,\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"AEMC solar inverter standards","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/aemc-inverter-rules.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/aemc-inverter-rules.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/aemc-inverter-rules.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/aemc-inverter-rules.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/aemc-inverter-rules.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":34694,"url":"https:\/\/www.solarquotes.com.au\/blog\/voltage-rise-solar\/","url_meta":{"origin":41927,"position":4},"title":"Voltage Rise &#038; Solar Shutdowns. Why It Happens &#038; How To Fix It.","author":"Ronald Brakels","date":"November 4, 2019","format":false,"excerpt":"This time last week I was at the 2019 All Energy Conference and Exhibition in Melbourne.\u00a0 Or -- if I have been lazy getting this article out -- it was this time last week plus or minus one day. \u00a0Mostly plus. I attended a group presentation on grid over voltage.\u2026","rel":"","context":"In &quot;Solar Installation&quot;","block_context":{"text":"Solar Installation","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-installation\/"},"img":{"alt_text":"Grid voltage rise and solar energy systems","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/voltage-rise.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/voltage-rise.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/voltage-rise.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/voltage-rise.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/voltage-rise.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":21004,"url":"https:\/\/www.solarquotes.com.au\/blog\/mass-energy-inverter-recall-mb0560\/","url_meta":{"origin":41927,"position":5},"title":"Product Recall &#8211; Shenzhen Sofarsolar Mass Energy Inverters","author":"Michael Bloch","date":"April 25, 2018","format":false,"excerpt":"After being de-listed from the Clean Energy Council's Approved Products List, certain Mass Energy solar inverters from Shenzhen Sofarsolar are now subject to a recall notice. ----- UPDATE June 5, 2018: A statement from Sofar Solar Australia says the company has \"flown a large team of factory-trained engineers\" to Australia\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Shenzhen Sofarsolar (Sofar Solar) Mass Energy Inverter Recall","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/solar-inverter-recall.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/solar-inverter-recall.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/solar-inverter-recall.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/solar-inverter-recall.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/41927","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=41927"}],"version-history":[{"count":7,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/41927\/revisions"}],"predecessor-version":[{"id":41954,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/41927\/revisions\/41954"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/41931"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=41927"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=41927"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=41927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}