{"id":43642,"date":"2020-10-01T08:07:17","date_gmt":"2020-09-30T21:37:17","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=43642"},"modified":"2020-10-01T08:07:17","modified_gmt":"2020-09-30T21:37:17","slug":"eyre-peninsula-link-mb1705","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/","title":{"rendered":"Eyre Peninsula Link Requested Funding Approved &#8211; Well, Most Of It"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-43643\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg\" alt=\"Eyre Peninsula Link\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>The Australian Energy Regulator (AER) has approved funding for a proposed new, high-voltage transmission line project for South Australia&#8217;s Eyre Peninsula &#8211; Eyre Peninsula Link.<!--more--><\/p>\n<p>After almost half a century in service, the Eyre Peninsula\u2019s existing high-voltage power line is approaching the end of its operational life and has certainly been showing its age.<\/p>\n<p>In May this year, ElectraNet submitted an application to the AER seeking an increase in its allowed revenue to replace the existing line. This, it said, would improve reliability and security of supply to homes and businesses in the region; including reducing network outages and saving on the ongoing cost of back-up generation and repairs.<\/p>\n<p>In addition to meeting immediate supply needs of the Eyre Peninsula, it would also &#8220;future-proof&#8221; the network to cater for increased capacity for new mining developments and renewable energy projects in the region for the next 50 years..<\/p>\n<p>ElectraNet will build a new 270-kilometre long double-circuit 132 kV transmission line from Cultana to Port Lincoln via Yadnarie, and have the ability to upgrade the Cultana to Yadnarie section to 275 kV in the future when required. The project also includes upgrades to transmission substations at Port Lincoln, Cultana, Yadnarie, Wudinna and Middleback.<\/p>\n<p>The route of the new line runs almost parallel to the existing transmission line &#8211; a result of landowner engagement that indicated a strong preference for this and an approach that will have the least environmental impact.<\/p>\n<p>An overview of the project <a href=\"https:\/\/www.electranet.com.au\/projects\/eyre-peninsula-link\/\">can be found here<\/a>.<\/p>\n<h2>AER: Electranet Overestimated Capex<\/h2>\n<p>ElectraNet was shooting for $290 million, but the AER approved $280 million; <a href=\"https:\/\/www.aer.gov.au\/system\/files\/AER%20-%20Final%20decision%20-%20ElectraNet%20-%20Eyre%20Peninsula%20Reinforcement%20contingent%20project%20-%20September%202020.pdf\">stating<\/a>:<\/p>\n<blockquote><p>&#8220;.. while we found the tendered costs to be reasonably prudent and efficient, we found that ElectraNet has overestimated the capex required for its internal project delivery requirements and its project risk costs.&#8221;<\/p><\/blockquote>\n<p>AER stated its decision will deliver the incremental revenues required to deliver Eyre Peninsula Link as soon as practicable, while also ensuring consumers pay no more than necessary. ElectraNet will be able recover $3.7 million in additional revenue from customers during the remainder of the 2018-23 regulatory control period, which will add about $1 annually to a \u2018typical\u2019 residential power bill.<\/p>\n<p>While not allowed the full $290 million, ElectraNet seems <a href=\"https:\/\/www.electranet.com.au\/funding-for-eyre-peninsula-link-approved\/\">pleased with the outcome<\/a>.<\/p>\n<p>No doubt the region&#8217;s residents will also be happy &#8211; they&#8217;ve endured multiple blackouts and other power quality issues over the years. The worst incident in recent times resulted from a <a href=\"https:\/\/en.wikipedia.org\/wiki\/2016_South_Australian_blackout\">major storm in 2016<\/a>, an event that saw some politicians <a href=\"https:\/\/www.solarquotes.com.au\/blog\/australian-politicians-confuse-wind-power-powerful-winds\/\">confusing wind power with powerful winds<\/a>. After the storm, many on the Eyre Peninsula were without mains electricity for several days; which sparked increased interest in <a href=\"https:\/\/www.solarquotes.com.au\/solar101.html\">solar power<\/a> and <a href=\"https:\/\/www.solarquotes.com.au\/battery-storage\/\">battery storage<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Australian Energy Regulator (AER) has approved funding for a proposed new, high-voltage transmission line project for South Australia&#8217;s Eyre Peninsula &#8211; Eyre Peninsula Link.<\/p>\n","protected":false},"author":17,"featured_media":43643,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-43642","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Eyre Peninsula Link Requested Funding Approved - Well, Most Of It<\/title>\n<meta name=\"description\" content=\"The AER has approved funding for a proposed new, high-voltage transmission line project for SA&#039;s Eyre Peninsula - Eyre Peninsula Link.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Eyre Peninsula Link Requested Funding Approved - Well, Most Of It\" \/>\n<meta property=\"og:description\" content=\"The AER has approved funding for a proposed new, high-voltage transmission line project for SA&#039;s Eyre Peninsula - Eyre Peninsula Link.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-09-30T21:37:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Eyre Peninsula Link Requested Funding Approved &#8211; Well, Most Of It\",\"datePublished\":\"2020-09-30T21:37:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/\"},\"wordCount\":448,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/\",\"name\":\"Eyre Peninsula Link Requested Funding Approved - Well, Most Of It\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg\",\"datePublished\":\"2020-09-30T21:37:17+00:00\",\"description\":\"The AER has approved funding for a proposed new, high-voltage transmission line project for SA's Eyre Peninsula - Eyre Peninsula Link.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Eyre Peninsula Link\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Eyre Peninsula Link Requested Funding Approved &#8211; Well, Most Of It\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Eyre Peninsula Link Requested Funding Approved - Well, Most Of It","description":"The AER has approved funding for a proposed new, high-voltage transmission line project for SA's Eyre Peninsula - Eyre Peninsula Link.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/","og_locale":"en_US","og_type":"article","og_title":"Eyre Peninsula Link Requested Funding Approved - Well, Most Of It","og_description":"The AER has approved funding for a proposed new, high-voltage transmission line project for SA's Eyre Peninsula - Eyre Peninsula Link.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2020-09-30T21:37:17+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Eyre Peninsula Link Requested Funding Approved &#8211; Well, Most Of It","datePublished":"2020-09-30T21:37:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/"},"wordCount":448,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/","url":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/","name":"Eyre Peninsula Link Requested Funding Approved - Well, Most Of It","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg","datePublished":"2020-09-30T21:37:17+00:00","description":"The AER has approved funding for a proposed new, high-voltage transmission line project for SA's Eyre Peninsula - Eyre Peninsula Link.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg","width":1200,"height":630,"caption":"Eyre Peninsula Link"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/eyre-peninsula-link-mb1705\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Eyre Peninsula Link Requested Funding Approved &#8211; Well, Most Of It"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/eyre-peninsula-link.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-blU","jetpack-related-posts":[{"id":10683,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-batteries-kimba-mb0009\/","url_meta":{"origin":43642,"position":0},"title":"South Australian Town Considering Solar + Storage Backup Power","author":"Michael Bloch","date":"April 25, 2017","format":false,"excerpt":"The District Council of Kimba is looking into the viability of using solar and batteries to provide backup power for important buildings in the Kimba township. Kimba, home of the Big Galah, is a rural service town situated around 460 kilometres north-west of Adelaide; at the top of South Australia's\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Kimba investigating solar + storage","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kimba-solar-batteries.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kimba-solar-batteries.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/04\/kimba-solar-batteries.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":42313,"url":"https:\/\/www.solarquotes.com.au\/blog\/sa-water-solar-rollout-mb1647\/","url_meta":{"origin":43642,"position":1},"title":"SA Water Solar Panel Rollout Update","author":"Michael Bloch","date":"August 18, 2020","format":false,"excerpt":"Work has begun on installing 30,000 solar panels at Happy Valley Reservoir Reserve in Adelaide's south and a bunch of solar panels were recently installed at SA Water sites on South Australia's Eyre Peninsula. Happy Valley Reservoir was completed in 1897 and holds 12.6 gigalitres - enough to fill 6,300\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"SA Water solar energy initiative","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sa-water-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sa-water-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sa-water-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sa-water-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/sa-water-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":16304,"url":"https:\/\/www.solarquotes.com.au\/blog\/zen-gigawatt-renewables-mb0280\/","url_meta":{"origin":43642,"position":2},"title":"Zen Energy Launches South Australian Gigawatt Program","author":"Michael Bloch","date":"October 31, 2017","format":false,"excerpt":"Large-scale solar PV, a major battery system, pumped hydro storage and demand response projects were approved by Zen Energy's Board yesterday morning. Yesterday's Board meeting was the first since GFG Alliance, the saviour of Whyalla Steelworks, acquired a controlling stake in Zen Energy last month. GFG Alliance's Sanjeev Gupta has\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Zen Energy Gigawatt Program","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/10\/zen-energy-gigawatt-program.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/10\/zen-energy-gigawatt-program.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/10\/zen-energy-gigawatt-program.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/10\/zen-energy-gigawatt-program.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":34062,"url":"https:\/\/www.solarquotes.com.au\/blog\/aer-sapn-electricity-mb1244\/","url_meta":{"origin":43642,"position":3},"title":"(Slightly) Cheaper Electricity Network Charges Ahead For South Australians","author":"Michael Bloch","date":"October 9, 2019","format":false,"excerpt":"A draft decision by the Australian Energy Regulator would see a reduction in network distribution charges whacked on South Australians' electricity bills next financial year. South Australia's Distributed Network Service Provider (DNSP) SA Power Networks (SAPN) had requested it be permitted to recoup $4,214.5 million from South Australian electricity customers\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"SA Power Networks - SAPN","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/sapn-aer-electricity.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/sapn-aer-electricity.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/sapn-aer-electricity.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/sapn-aer-electricity.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/sapn-aer-electricity.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":29126,"url":"https:\/\/www.solarquotes.com.au\/blog\/pumped-hydro-shortlist-mb0991\/","url_meta":{"origin":43642,"position":4},"title":"Pumped Hydro Storage: An Underwriting New Generation Standout","author":"Michael Bloch","date":"March 27, 2019","format":false,"excerpt":"Pumped hydro storage projects made up half of the projects shortlisted under the Morrison Government's Underwriting New Generation Investments program. 66 proposals were submitted for consideration and from those, 12 projects have been shortlisted - six pumped hydro storage, five gas and one coal power upgrade project. If you're not\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Pumped hydro energy storage","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/pumped-hydro-goat-hill.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/pumped-hydro-goat-hill.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/pumped-hydro-goat-hill.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/pumped-hydro-goat-hill.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/pumped-hydro-goat-hill.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":34892,"url":"https:\/\/www.solarquotes.com.au\/blog\/victoria-electricity-costs-mb1288\/","url_meta":{"origin":43642,"position":5},"title":"Higher Electricity Network Charges For Victorians In 2020","author":"Michael Bloch","date":"November 12, 2019","format":false,"excerpt":"Victoria's households and small businesses will be digging deeper into their pockets from January 1 next year to cover electricity network charges after a decision by the Australian Energy Regulator (AER). The AER announced yesterday it had approved increases for the state's five Distributed Network Service Providers (DNSPs). Network charges\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Victorian electricity network charges","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/network-charges-victoria.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/network-charges-victoria.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/network-charges-victoria.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/network-charges-victoria.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/network-charges-victoria.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/43642","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=43642"}],"version-history":[{"count":6,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/43642\/revisions"}],"predecessor-version":[{"id":43649,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/43642\/revisions\/43649"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/43643"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=43642"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=43642"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=43642"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}