{"id":43790,"date":"2020-10-07T06:08:14","date_gmt":"2020-10-06T19:38:14","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=43790"},"modified":"2020-10-07T06:08:14","modified_gmt":"2020-10-06T19:38:14","slug":"tweed-shire-renewables-mb1711","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/","title":{"rendered":"Tweed Shire Council&#8217;s Wind\/Solar Energy PPA Kicks In"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-43791\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg\" alt=\"Tweed Shire Council solar energy\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>New South Wales&#8217; Tweed Shire Council has commenced a 10-year Power Purchase Agreement that will see more than half its electricity for larger sites being generated by wind and solar farms.<!--more--><\/p>\n<p>The PPA, which was established with Flow Power, involves supply from Sapphire Wind Farm situated near Glenn Innes, and Bomen Solar Farm near Wagga Wagga.<\/p>\n<blockquote><p>&#8220;We have taken the lead from other large organisations, such as the Sydney Opera House and Newcastle City Council, who similarly signed these agreements, which will greatly assist our nation transform from a reliance on brown energy to energy sources such as wind and solar,&#8221; <a href=\"https:\/\/www.tweed.nsw.gov.au\/MediaReleases\/2870\">said<\/a> Mayor of Tweed Cr Chris Cherry.<\/p><\/blockquote>\n<h2>On-Site Solar Power Rollout Continues<\/h2>\n<p>Tweed Shire Council has also been busy installing solar panels on its own facilities, with 800kW of on-site solar power capacity in place and a further 750kW to be installed during the current financial year. Among its existing installations is a <a href=\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-solar-mb1023\/\">165kW solar array<\/a> at the Tweed Regional Aquatic Centre (TRAC) in Murwillumbah and a 99kW ground and roof mounted system at Bray Park Water Treatment Plant (pictured above).<\/p>\n<p><a href=\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-solar-mb0288\/\">Back in 2017<\/a>, Council resolved to source 25 per cent of its electricity from self-generated solar energy by 2022 and potentially half its needs from solar and batteries by 2025.<\/p>\n<p>Other energy related projects including replacing existing streetlights with LED lights &#8211; expected to reduce street lighting electricity consumption by more than half &#8211; will take Council towards its goals of a 25 per cent reduction in electricity-related carbon emissions by 2022 and a 50 per cent reduction by 2025.<\/p>\n<p><span id=\"ctl00_cph_content_pnl_public\">At its 19 September 2019 Council meeting, Tweed Shire Council declared a climate emergency and it is also a member of the Cities Power Partnership. <\/span>Its recently adopted new Climate Change Policy sets a goal for the organisation to achieve net zero carbon emissions by 2030.<\/p>\n<p><span id=\"ctl00_cph_content_pnl_public\">Solar power isn&#8217;t just helping to reduce Council&#8217;s emissions, but its electricity bills too &#8211; which is also good news for ratepayers. Council\u2019s 22GWh\/pa electricity consumption was previously costing around $5 million annually.<\/span><\/p>\n<p><span id=\"ctl00_cph_content_pnl_public\">The Tweed Shire community has also been getting into PV in a big way, with more than 30% of households using <a href=\"https:\/\/www.solarquotes.com.au\/panels\/\"> solar panels<\/a> according to Council &#8211; the NSW proportion is 23% (Source: APVI). In <\/span><a href=\"https:\/\/www.solarquotes.com.au\/location\/murwillumbah-2484-nsw\/\">Murwillumbah<\/a>, which has a population of around 17,000, more than 3,852 small-scale PV systems had been installed by the end of August this year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>New South Wales&#8217; Tweed Shire Council has commenced a 10-year Power Purchase Agreement that will see more than half its electricity for larger sites being generated by wind and solar farms.<\/p>\n","protected":false},"author":17,"featured_media":43791,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-43790","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tweed Shire Council&#039;s Wind\/Solar Energy PPA Kicks In<\/title>\n<meta name=\"description\" content=\"Tweed Shire Council starts a 10-year Power Purchase Agreement providing electricity for its larger sites generated by wind and solar farms.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tweed Shire Council&#039;s Wind\/Solar Energy PPA Kicks In\" \/>\n<meta property=\"og:description\" content=\"Tweed Shire Council starts a 10-year Power Purchase Agreement providing electricity for its larger sites generated by wind and solar farms.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-10-06T19:38:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Tweed Shire Council&#8217;s Wind\/Solar Energy PPA Kicks In\",\"datePublished\":\"2020-10-06T19:38:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/\"},\"wordCount\":398,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/\",\"name\":\"Tweed Shire Council's Wind\/Solar Energy PPA Kicks In\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg\",\"datePublished\":\"2020-10-06T19:38:14+00:00\",\"description\":\"Tweed Shire Council starts a 10-year Power Purchase Agreement providing electricity for its larger sites generated by wind and solar farms.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Tweed Shire Council solar energy\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tweed Shire Council&#8217;s Wind\/Solar Energy PPA Kicks In\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tweed Shire Council's Wind\/Solar Energy PPA Kicks In","description":"Tweed Shire Council starts a 10-year Power Purchase Agreement providing electricity for its larger sites generated by wind and solar farms.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/","og_locale":"en_US","og_type":"article","og_title":"Tweed Shire Council's Wind\/Solar Energy PPA Kicks In","og_description":"Tweed Shire Council starts a 10-year Power Purchase Agreement providing electricity for its larger sites generated by wind and solar farms.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2020-10-06T19:38:14+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Tweed Shire Council&#8217;s Wind\/Solar Energy PPA Kicks In","datePublished":"2020-10-06T19:38:14+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/"},"wordCount":398,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/","url":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/","name":"Tweed Shire Council's Wind\/Solar Energy PPA Kicks In","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg","datePublished":"2020-10-06T19:38:14+00:00","description":"Tweed Shire Council starts a 10-year Power Purchase Agreement providing electricity for its larger sites generated by wind and solar farms.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg","width":1200,"height":630,"caption":"Tweed Shire Council solar energy"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-renewables-mb1711\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Tweed Shire Council&#8217;s Wind\/Solar Energy PPA Kicks In"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/solar-tweed-shire.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-boi","jetpack-related-posts":[{"id":49962,"url":"https:\/\/www.solarquotes.com.au\/blog\/tweed-solar-rollout-mb1980\/","url_meta":{"origin":43790,"position":0},"title":"Tweed Shire Solar Rollout Moves To Phase 2","author":"Michael Bloch","date":"May 4, 2021","format":false,"excerpt":"More solar power capacity is on the way for New South Wales' Tweed Shire Council, building on an already impressive installation tally. Back in 2017, Council adopted its Renewable Energy Action Plan (REAP) with the goal of generating 25% of its own electricity from renewable sources by 2022, and 50%\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Tweed Shire Council - solar energy","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/tweed-shire-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/tweed-shire-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/tweed-shire-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/tweed-shire-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/tweed-shire-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":25421,"url":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-solar-mb0802\/","url_meta":{"origin":43790,"position":1},"title":"Tweed Shire Council Beefing Up Solar Power Capacity","author":"Michael Bloch","date":"October 29, 2018","format":false,"excerpt":"New South Wales' Tweed Shire Council will have more than doubled its solar energy capacity by the end of this year\u00a0 - and there's more to come. Council says a number of new solar projects will be completed by the time 2018 draws to a close. \" The biggest project\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Tweed Shire Council - solar energy","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/tweed-shire-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/tweed-shire-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/tweed-shire-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/tweed-shire-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":16453,"url":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-solar-mb0288\/","url_meta":{"origin":43790,"position":2},"title":"Tweed Shire Council Aims For 50% Solar Power","author":"Michael Bloch","date":"November 6, 2017","format":false,"excerpt":"New South Wales' Tweed Shire Council has voted to source 25 per cent of its electricity from self-generated solar power by 2022 and potentially half its needs from solar and batteries by 2025. The Council adopted the Renewable Energy Action Plan (REAP) in a meeting last week. Phase One energy\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar energy in Tweed Shire","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tweed-shire-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tweed-shire-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tweed-shire-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/tweed-shire-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":29709,"url":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-solar-mb1023\/","url_meta":{"origin":43790,"position":3},"title":"Tweed Shire Adds Aquatic Centre Installation To Solar Energy Portfolio","author":"Michael Bloch","date":"April 22, 2019","format":false,"excerpt":"New South Wales' Tweed Shire Council switched on its new 165kW solar panel installation at the Tweed Regional Aquatic Centre (TRAC) in Murwillumbah last week. Council says the system will slash the pool's mains electricity costs by around $42,500 a year and generate equivalent to around 24% of TRAC's energy\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Tweed Shire Council - solar power","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/04\/tweed-shire-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/04\/tweed-shire-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/04\/tweed-shire-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/04\/tweed-shire-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/04\/tweed-shire-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":30470,"url":"https:\/\/www.solarquotes.com.au\/blog\/tweed-shire-solar-project-mb1062\/","url_meta":{"origin":43790,"position":4},"title":"Go-Ahead For Tweed Shire Council&#8217;s Biggest Solar Panel Installation Yet","author":"Michael Bloch","date":"May 21, 2019","format":false,"excerpt":"New South Wales' Tweed Shire Council is pursuing the installation of another large solar power system to help it towards its electricity self-generation goals. At a meeting last Thursday, councillors voted to pursue planning and other approvals required to install a 604kW ground-mount solar power system at the Banora Point\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Tweed Shire solar energy project","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/tweed-shire-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/tweed-shire-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/tweed-shire-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/tweed-shire-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/tweed-shire-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":61283,"url":"https:\/\/www.solarquotes.com.au\/blog\/shasa-solar-farm-mb2449\/","url_meta":{"origin":43790,"position":5},"title":"SHASA Seeking Support For NSW South Coast Community Solar Farm","author":"Michael Bloch","date":"April 26, 2022","format":false,"excerpt":"The Southcoast Health and Sustainability Alliance (SHASA) is looking for Eurobodalla Shire Council's blessing for a proposed feasibility study on the potential for a community solar farm and battery storage project in the region. SHASA is a non-profit group undertaking projects to achieve a more resilient community in the Eurobodalla;\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"NSW South Coast community solar farm feasibility study","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/south-coast-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/south-coast-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/south-coast-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/south-coast-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/south-coast-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/43790","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=43790"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/43790\/revisions"}],"predecessor-version":[{"id":43793,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/43790\/revisions\/43793"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/43791"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=43790"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=43790"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=43790"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}