{"id":45979,"date":"2020-12-24T05:22:33","date_gmt":"2020-12-23T18:52:33","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=45979"},"modified":"2020-12-24T05:25:08","modified_gmt":"2020-12-23T18:55:08","slug":"floating-solar-toowoomba-mb1812","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/","title":{"rendered":"Floating Solar For Queensland&#8217;s Toowoomba?"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-45980\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg\" alt=\"Toowoomba - floating solar potential\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>A second proponent has made the next stage of Toowoomba Regional Council&#8217;s tender process for its New Energy Generation project.<!--more--><\/p>\n<p>There&#8217;s little published on the New Energy Generation project, just that it seeks to generate energy through Council&#8217;s existing land and water assets &#8211; a long term venture that will take place in multiple stages.<\/p>\n<p>Council formally launched the procurement process in November 2019. The first company to get a guernsey in terms of progressing past the tender submission stage was BE Power in August this year, which is proposing a pumped hydro energy storage facility. Council didn&#8217;t have much more to say on it at the time, but last week GE Renewable Energy <a href=\"https:\/\/www.ge.com\/news\/press-releases\/ge-renewable-energy-signs-agreement-with-be-power-to-accelerate-400-mw-pumped-hydro\"> announced<\/a> it had signed an agreement with BE Power to co-develop a 400MW pumped hydro storage project in the region.<\/p>\n<p>Pumped hydro storage involves using surplus, off-peak or renewables-based electricity to power the pumping of water from a lower reservoir to a higher one. When electricity is needed, water from the higher reservoir is released and channelled through turbines to generate electricity, winding up back in the lower reservoir for the process to repeat.<\/p>\n<p>While Australia is a generally dry country, there are plenty of pumped hydro storage opportunities. A study in 2017 indicated there were more than <a href=\"https:\/\/www.solarquotes.com.au\/blog\/pumped-hydro-storage-australia-mb0218\/\">22,000 potential pumped hydro storage sites<\/a> across the nation, 1,700 of which were in Queensland.<\/p>\n<p>According to GE Renewable Energy, the project at Cressbrook Dam &#8211; named the Big-T Pumped Hydro Storage Power Plant &#8211; would be the first new pumped hydro project completed in Queensland in more than 35 years.<\/p>\n<h2>Floating Solar Gets A Look-In<\/h2>\n<p>The next proponent to advance is EPC Technologies Pty Ltd, which is proposing a floating solar farm. Again, Toowoomba Regional Council was very vague on detail, but there are several potential locations in the local government area for a significant installation including Lake Cooby, Lake Cressbrook and Lake Perseverance. The image used alongside the <a href=\"https:\/\/www.tr.qld.gov.au\/about-council\/news-publications\/media-releases\/14628-trc-approves-new-proponent-to-progress-to-next-stage-in-new-energy-generation-project-tender-process\">announcement<\/a> (also above) appears to be Lake Perseverance during a dry spell, but that doesn&#8217;t necessarily it&#8217;s where the floating solar farm would be located.<\/p>\n<blockquote><p>\u201cCouncil is keen to explore renewable energy opportunities that successful proponents might offer, including a reduction in our energy costs,&#8221; said Mayor Paul Antonio. &#8220;Technology considered as part of this project could deliver important environmental benefits to our Region, including reduced greenhouse emissions.&#8221;<\/p><\/blockquote>\n<p>There&#8217;s not a great deal of floating solar in Australia currently and what exists are generally small projects, such as a <a href=\"https:\/\/www.solarquotes.com.au\/blog\/power-partners-solar-mb0438\/\">99kW floating solar system<\/a> in Lismore New South Wales that has been operating for close to three years. Perhaps EPC&#8217;s project, should it proceed, could take the crown of the nation&#8217;s largest floating PV installation.<\/p>\n<p>Among the advantages of floating solar are improved system performance through the cooling effects of water (helping to offset higher construction cost), while shade from the panels on the water below can inhibit growth of algae and reduce evaporation.<\/p>\n<h2>Toowoomba And Solar Power<\/h2>\n<p>As for solar power generally in Council&#8217;s area and as elsewhere in Queensland, small-scale PV is very popular, with close to 20,000 installations below 10kW capacity racked up to date. <a href=\"https:\/\/www.solarquotes.com.au\/installers\/cities\/toowoomba\/\">Solar installers in Toowoomba<\/a> (and companies servicing it) continue to be kept pretty busy meeting demand for the electricity bill-busting technology.<\/p>\n<p>In terms of Council&#8217;s own PV uptake, among the solar assets it already has in place are panels at:<\/p>\n<ul>\n<li>Highfields Sport and Recreation Park<\/li>\n<li>Toowoomba City Library<\/li>\n<li>Greater Toowoomba Waste Management Facility<\/li>\n<li>Kleinton Waste Management Facility<\/li>\n<li>Principal Depot (<a href=\"https:\/\/www.solarquotes.com.au\/blog\/toowoomba-council-solar-mb1644\/\">solar and battery storage<\/a>)<\/li>\n<\/ul>\n<p>There are also a number of large-scale PV facilities operating or in the pipeline in the region, including Bulli Creek, Oakey and Yarranlea solar farms.<\/p>\n<p>All up, around 373MW of solar capacity has been installed in the Toowoomba Regional Council area.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A second proponent has made the next stage of Toowoomba Regional Council&#8217;s tender process for its New Energy Generation project.<\/p>\n","protected":false},"author":17,"featured_media":45980,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-45979","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Floating Solar For Queensland&#039;s Toowoomba? - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"A second proponent has made the next stage of Toowoomba Regional Council&#039;s tender process for its New Energy Generation project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Floating Solar For Queensland&#039;s Toowoomba?\" \/>\n<meta property=\"og:description\" content=\"A second proponent has made the next stage of Toowoomba Regional Council&#039;s tender process for its New Energy Generation project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-23T18:52:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-12-23T18:55:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Floating Solar For Queensland&#8217;s Toowoomba?\",\"datePublished\":\"2020-12-23T18:52:33+00:00\",\"dateModified\":\"2020-12-23T18:55:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/\"},\"wordCount\":634,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/\",\"name\":\"Floating Solar For Queensland's Toowoomba? - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg\",\"datePublished\":\"2020-12-23T18:52:33+00:00\",\"dateModified\":\"2020-12-23T18:55:08+00:00\",\"description\":\"A second proponent has made the next stage of Toowoomba Regional Council's tender process for its New Energy Generation project.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Toowoomba - floating solar potential\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Floating Solar For Queensland&#8217;s Toowoomba?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Floating Solar For Queensland's Toowoomba? - SolarQuotes Blog","description":"A second proponent has made the next stage of Toowoomba Regional Council's tender process for its New Energy Generation project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/","og_locale":"en_US","og_type":"article","og_title":"Floating Solar For Queensland's Toowoomba?","og_description":"A second proponent has made the next stage of Toowoomba Regional Council's tender process for its New Energy Generation project.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2020-12-23T18:52:33+00:00","article_modified_time":"2020-12-23T18:55:08+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Floating Solar For Queensland&#8217;s Toowoomba?","datePublished":"2020-12-23T18:52:33+00:00","dateModified":"2020-12-23T18:55:08+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/"},"wordCount":634,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/","url":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/","name":"Floating Solar For Queensland's Toowoomba? - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg","datePublished":"2020-12-23T18:52:33+00:00","dateModified":"2020-12-23T18:55:08+00:00","description":"A second proponent has made the next stage of Toowoomba Regional Council's tender process for its New Energy Generation project.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg","width":1200,"height":630,"caption":"Toowoomba - floating solar potential"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/floating-solar-toowoomba-mb1812\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Floating Solar For Queensland&#8217;s Toowoomba?"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/floating-solar-toowoomba.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-bXB","jetpack-related-posts":[{"id":42272,"url":"https:\/\/www.solarquotes.com.au\/blog\/toowoomba-council-solar-mb1644\/","url_meta":{"origin":45979,"position":0},"title":"Toowoomba Council&#8217;s Solar Powered Depot Officially Opened","author":"Michael Bloch","date":"August 17, 2020","format":false,"excerpt":"Toowoomba Regional Council Mayor Paul Antonio officially opened Council\u2019s new solar powered $67 million Principal Depot in Charlton last week. Among the sustainability features of the new depot is a 750,000 litre rainwater tank and solar panels installed on the rooftop of the central operations building and main workshop. Mayor\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Toowoomba Council - solar power","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/toowoomba-depot-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/toowoomba-depot-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/toowoomba-depot-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/toowoomba-depot-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/08\/toowoomba-depot-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":72435,"url":"https:\/\/www.solarquotes.com.au\/blog\/toowoomba-renewables-solar-mb2863\/","url_meta":{"origin":45979,"position":1},"title":"Another Huge Solar + Storage Project For Toowoomba Region","author":"Michael Bloch","date":"March 16, 2023","format":false,"excerpt":"A development application for solar farm boasting more than 1.7 million solar panels and a big battery was lodged with Queensland's Toowoomba Regional Council last week. Skylab Australia's proposed Punchs Creek Renewable Energy Project is intended to be constructed in two stages; with a final PV capacity of up to\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Punch\u2019s Creek Renewable Energy Project","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/punchs-creek-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/punchs-creek-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/punchs-creek-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/punchs-creek-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/punchs-creek-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":18169,"url":"https:\/\/www.solarquotes.com.au\/blog\/yarranlea-solar-farm-mb0405\/","url_meta":{"origin":45979,"position":2},"title":"Yarranlea Solar Farm Construction To Commence Soon","author":"Michael Bloch","date":"January 8, 2018","format":false,"excerpt":"The construction of a 100MW solar farm 45 kilometres west of Toowoomba is expected to start early this year after recent approval from the Australian Electricity Market Operator (AEMO). Yarranlea Solar Farm will be developed in four stages and once completed, the project will generate enough electricity to supply the\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Yarranlea solar farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/yarranlea-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/yarranlea-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/yarranlea-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/yarranlea-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":51167,"url":"https:\/\/www.solarquotes.com.au\/blog\/kleinton-battery-storage-mb2037\/","url_meta":{"origin":45979,"position":3},"title":"Kleinton Battery Storage Project Application Lodged","author":"Michael Bloch","date":"June 15, 2021","format":false,"excerpt":"An application has been lodged for a battery energy storage facility to be constructed at a site around 13 kilometres north of the Queensland city of Toowoomba. The project is part of an Energy Queensland trial involving the installation of 40MWh of battery storage. The trial, announced by the Palaszczuk\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Kleinton Battery Energy Storage System - Toowoomba Shire","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/battery-storage-toowoomba.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/battery-storage-toowoomba.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/battery-storage-toowoomba.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/battery-storage-toowoomba.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/battery-storage-toowoomba.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":50602,"url":"https:\/\/www.solarquotes.com.au\/blog\/singleton-solar-energy-mb2007\/","url_meta":{"origin":45979,"position":4},"title":"Singleton Council&#8217;s Solar Power Cash Splash","author":"Michael Bloch","date":"May 25, 2021","format":false,"excerpt":"New South Wales' Singleton Council is spending close to a million dollars on a solar power and LED lighting rollout this year. Singleton Shire is a local government area in New South Wales' Hunter Region - which has traditionally been coal country. Home to around 23,496 people as at the\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Singleton solar energy","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/singleton-solar-energy.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/singleton-solar-energy.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/singleton-solar-energy.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/singleton-solar-energy.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/singleton-solar-energy.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":43394,"url":"https:\/\/www.solarquotes.com.au\/blog\/nillumbik-solar-farm-mb1691\/","url_meta":{"origin":45979,"position":5},"title":"Nillumbik Solar Farm Update","author":"Michael Bloch","date":"September 22, 2020","format":false,"excerpt":"The tender has been awarded for a proposed solar facility to be built at an old landfill site in Victoria's Nillumbik Shire Council area. Nillumbik Shire is located approximately 25 kms north-east of Melbourne\u2019s CBD. Back in August 2018, Council resolved to undertake a feasibility study into the development of\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Nillumbik Solar Farm update","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/09\/nillumbik-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/09\/nillumbik-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/09\/nillumbik-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/09\/nillumbik-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/09\/nillumbik-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/45979","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=45979"}],"version-history":[{"count":5,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/45979\/revisions"}],"predecessor-version":[{"id":45985,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/45979\/revisions\/45985"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/45980"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=45979"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=45979"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=45979"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}