{"id":45986,"date":"2020-12-24T07:05:45","date_gmt":"2020-12-23T20:35:45","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=45986"},"modified":"2020-12-24T07:05:45","modified_gmt":"2020-12-23T20:35:45","slug":"newcastle-battery-project-mb1813","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/","title":{"rendered":"Large-Scale Battery Project For Newcastle&#8217;s North-West"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-45987\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle.jpg\" alt=\"Battery energy storage project - Newcastle\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Edify Energy has announced a development application has been lodged with Newcastle City Council for a large battery energy storage system (BESS) project in the north-western suburb of Mayfield West.<!--more--><\/p>\n<p>The 28 MW \/ 56 MWh project is being developed by Precinct Capital and Edify for a 6,000sqm site in Steel River Estate. The battery system itself will occupy around 2,500sqm of the site &#8211; the equivalent of around 10 tennis courts.\u00a0 Precinct Capital is a land holder in the Estate, which covers 104 hectares of\u00a0 industrial land just 10 minutes from Newcastle\u2019s Central Business District.<\/p>\n<p>Edify Energy says the BESS will charge from and discharge directly to the grid and participate in various Australian Energy Market Operator (AEMO) regulated markets; providing energy, frequency control ancillary services (FCAS) and other ancillary services.<\/p>\n<p>As well as supporting the electricity network, the battery will also facilitate the further integration of residential rooftop solar power and utility scale renewable energy developments across the Hunter Region.<\/p>\n<blockquote><p>&#8220;The project will act like a shock absorber within the electrical network, absorbing electricity from the grid when generation exceeds demand and export electricity to the grid at times of lower generation including during intermittent solar and wind resource,\u201d <a href=\"https:\/\/edifyenergy.com\/uncategorised\/large-battery-to-support-renewable-energy-and-keep-lights-on-in-hunter\/\">said Edify Chief Executive John Cole<\/a>.<\/p><\/blockquote>\n<h2>Positive Signal From Council<\/h2>\n<p>Assuming the Steel River Estate energy storage project gets the thumbs up from Newcastle City Council, construction and commissioning should take six to eight months; providing between 20 and 30 direct jobs during the construction phase.<\/p>\n<p>Newcastle Lord Mayor Nuatali Nelmes seems pretty keen for the project to proceed, stating:<\/p>\n<blockquote><p>&#8220;This a world class large-scale battery storage investment in the Newcastle area, and a first-of-its-kind project for the region, creating a blueprint for additional investments and local innovation.\u201d<\/p><\/blockquote>\n<p>Council has been very supportive of renewables, including in terms of its own operations. In 2019 Council committed to <a href=\"https:\/\/www.solarquotes.com.au\/blog\/city-newcastle-renewables-mb1191\/\">sourcing 100 per cent renewables<\/a> for the City\u2019s operational electricity requirements and achieved this goal with a significant helping hand from Council\u2019s <a href=\"https:\/\/www.solarquotes.com.au\/blog\/summerhill-solar-farm-mb1320\/\">five-megawatt solar farm<\/a> that commenced operations in December last year.<\/p>\n<p>The BESS project also strongly aligns with Council&#8217;s plans. The City\u2019s 2025 <a href=\"https:\/\/www.solarquotes.com.au\/blog\/newcastle-climate-action-mb1772\/\">Climate Action Plan<\/a> indicates more solar power on the cards, as is investigating the potential for installing megawatt-scale battery storage to firm renewable supply and build resilience across City of Newcastle operations.<\/p>\n<p>This will be Edify&#8217;s second large-scale energy storage project, the first being the 25MW \/ 50MWh Gannawarra Energy Storage System in Victoria. The company also has a solid track record for large-scale PV in Australia, including Darlington Point, Whitsunday, Hamilton, Gannawarra, Daydream and Hayman solar farms.<\/p>\n<p>Among other projects in its pipeline, Edify is developing a utility-scale solar power and battery project to supply electricity to the Lansdown Eco-Industrial Precinct in Queensland, which is intended to be Northern Australia\u2019s first environmentally sustainable advanced manufacturing, processing and technology hub. Edify&#8217;s 200MW Majors Creek Solar Farm will feature a 50MW battery storage facility and the project&#8217;s solar capacity could eventually be doubled.<\/p>\n<p>Edify may also establish a presence within the Precinct, with plans to build a renewable hydrogen electrolyser pilot plant.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Edify Energy has announced a development application has been lodged with Newcastle City Council for a large battery energy storage system (BESS) project in the north-western suburb of Mayfield West.<\/p>\n","protected":false},"author":17,"featured_media":45987,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-45986","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Large-Scale Battery Project For Newcastle&#039;s North-West<\/title>\n<meta name=\"description\" content=\"A development application has been lodged with Newcastle City Council for a large battery storage system project in Mayfield West.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Large-Scale Battery Project For Newcastle&#039;s North-West\" \/>\n<meta property=\"og:description\" content=\"A development application has been lodged with Newcastle City Council for a large battery storage system project in Mayfield West.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-23T20:35:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Large-Scale Battery Project For Newcastle&#8217;s North-West\",\"datePublished\":\"2020-12-23T20:35:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/\"},\"wordCount\":517,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/battery-project-newcastle.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/\",\"name\":\"Large-Scale Battery Project For Newcastle's North-West\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/battery-project-newcastle.jpg\",\"datePublished\":\"2020-12-23T20:35:45+00:00\",\"description\":\"A development application has been lodged with Newcastle City Council for a large battery storage system project in Mayfield West.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/battery-project-newcastle.jpg\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/battery-project-newcastle.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Battery energy storage project - Newcastle\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/newcastle-battery-project-mb1813\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/solar-battery-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Large-Scale Battery Project For Newcastle&#8217;s North-West\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/michael\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Large-Scale Battery Project For Newcastle's North-West","description":"A development application has been lodged with Newcastle City Council for a large battery storage system project in Mayfield West.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/","og_locale":"en_US","og_type":"article","og_title":"Large-Scale Battery Project For Newcastle's North-West","og_description":"A development application has been lodged with Newcastle City Council for a large battery storage system project in Mayfield West.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2020-12-23T20:35:45+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Large-Scale Battery Project For Newcastle&#8217;s North-West","datePublished":"2020-12-23T20:35:45+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/"},"wordCount":517,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/","url":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/","name":"Large-Scale Battery Project For Newcastle's North-West","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle.jpg","datePublished":"2020-12-23T20:35:45+00:00","description":"A development application has been lodged with Newcastle City Council for a large battery storage system project in Mayfield West.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle.jpg","width":1200,"height":630,"caption":"Battery energy storage project - Newcastle"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/newcastle-battery-project-mb1813\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Large-Scale Battery Project For Newcastle&#8217;s North-West"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/battery-project-newcastle.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-bXI","jetpack-related-posts":[{"id":25759,"url":"https:\/\/www.solarquotes.com.au\/blog\/wemen-gannawarra-solar-storage-mb0822\/","url_meta":{"origin":45986,"position":0},"title":"More Large-Scale Solar And Energy Storage Progress In Victoria","author":"Michael Bloch","date":"November 13, 2018","format":false,"excerpt":"Gannawarra Solar Farm is operating at full capacity, construction of its colocated battery system has been completed and Wemen Solar Farm is connected to the grid says developer Wirsol. Gannawarra Solar Farm\/Energy Storage System Wirsol announced yesterday the 60MW Gannawarra Solar Farm 13 kilometres west of Kerang in north-west Victoria\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Gannawarra Energy Storage System - Tesla Powerpack","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":26516,"url":"https:\/\/www.solarquotes.com.au\/blog\/darlington-point-solar-farm-mb0862\/","url_meta":{"origin":45986,"position":1},"title":"$407 Million Darlington Point Solar Farm Approved","author":"Michael Bloch","date":"December 13, 2018","format":false,"excerpt":"The NSW Department of Planning and Environment announced yesterday it had approved a 275-megawatt solar power project to be situated approximately 10km south of Darlington Point, near Griffith. Darlington Point is a small town (population a whisker over 1,000) located on the banks of the Murrumbidgee River in western New\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Darlington Point Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/darlington-point-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/darlington-point-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/darlington-point-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/12\/darlington-point-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":62878,"url":"https:\/\/www.solarquotes.com.au\/blog\/battery-dka-solar-mb2523\/","url_meta":{"origin":45986,"position":2},"title":"Large-Scale Battery For NT&#8217;s DKA Solar Centre","author":"Michael Bloch","date":"June 22, 2022","format":false,"excerpt":"The Desert Knowledge Australia Solar Centre in Alice Springs is getting the Rolls-Royce of large-scale batteries - quite literally. The DKA Solar Centre (DKASC) is part of the Desert Knowledge Precinct, situated off the Stuart Highway between Alice Springs' town centre and its airport. They do some very cool stuff\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Rolls Royce battery - DKA Solar Centre","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/06\/rolls-royce-battery.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/06\/rolls-royce-battery.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/06\/rolls-royce-battery.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/06\/rolls-royce-battery.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/06\/rolls-royce-battery.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":69738,"url":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/","url_meta":{"origin":45986,"position":3},"title":"Blyth Big Battery Given Go-Ahead","author":"Michael Bloch","date":"January 9, 2023","format":false,"excerpt":"Neoen announced late last week it's all systems go for another of its big battery projects, this one in South Australia. On Friday, the company said it had issued notices to proceed to contractors Elecnor and NHOA for the 200 MW \/ 400 MWh\u00a0 Blyth Battery, which is to be\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Blyth Battery - South Australia","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":68220,"url":"https:\/\/www.solarquotes.com.au\/blog\/darwin-big-battery-mb2732\/","url_meta":{"origin":45986,"position":4},"title":"Darwin&#8217;s &#8220;Big Battery&#8221; Project Progresses","author":"Michael Bloch","date":"November 29, 2022","format":false,"excerpt":"An important construction milestone has been reached for the Northern Territory's Darwin-Katherine Battery Energy Storage System (DK BESS) project. The DK BESS is a 34.7MW\/34.7MWh (primarily noted as 35MVA) project being constructed in the south-eastern area of Channel Island Power Station (CIPS - pictured above) in Darwin. A 279 MW\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Darwin's Channel Island Power Station","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/dk-bess-channel-island.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/dk-bess-channel-island.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/dk-bess-channel-island.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/dk-bess-channel-island.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/dk-bess-channel-island.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":51167,"url":"https:\/\/www.solarquotes.com.au\/blog\/kleinton-battery-storage-mb2037\/","url_meta":{"origin":45986,"position":5},"title":"Kleinton Battery Storage Project Application Lodged","author":"Michael Bloch","date":"June 15, 2021","format":false,"excerpt":"An application has been lodged for a battery energy storage facility to be constructed at a site around 13 kilometres north of the Queensland city of Toowoomba. The project is part of an Energy Queensland trial involving the installation of 40MWh of battery storage. The trial, announced by the Palaszczuk\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Kleinton Battery Energy Storage System - Toowoomba Shire","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/battery-storage-toowoomba.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/battery-storage-toowoomba.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/battery-storage-toowoomba.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/battery-storage-toowoomba.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/battery-storage-toowoomba.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/45986","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=45986"}],"version-history":[{"count":5,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/45986\/revisions"}],"predecessor-version":[{"id":45992,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/45986\/revisions\/45992"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/45987"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=45986"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=45986"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=45986"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}