{"id":46119,"date":"2020-12-29T07:13:49","date_gmt":"2020-12-28T20:43:49","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=46119"},"modified":"2020-12-29T07:13:49","modified_gmt":"2020-12-28T20:43:49","slug":"metz-solar-farm-mb1818","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/","title":{"rendered":"Financing Secured For NSW&#8217;s Metz Solar Farm"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-46120\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg\" alt=\"Metz solar farm financing\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Fotowatio Renewable Ventures (FRV) has closed financing for the Metz Solar Farm project in New South Wales.<!--more--><\/p>\n<p>Metz Solar Farm is a 115 MWac clean power station to be constructed at a site near Hillgrove, approximately 20 kilometres east of Armidale. Originally an Infinergy project, it was acquired by Clenergy and then changed hands again to FRV, which completed its acquisition last month.<\/p>\n<p>The facility is forecast to generate 320 GWh of electricity each year, while avoiding 288,000 tonnes of CO<sub>2 <\/sub>equivalent annually.<\/p>\n<p>Planning Approval was granted for Metz Solar Farm in July 2017 and AEMO and Transgrid grid-connection approval secured in July 2018. The project will generate electricity under a Power Purchase Agreement (PPA) with Snowy Hydro, which was signed in 2018.<\/p>\n<p>Start of construction was originally slated to commence during this quarter; but large-scale solar project builds often don&#8217;t begin when originally intended due to the many regulatory and financial hurdles that must be cleared.<\/p>\n<p>FRV says the financing is being provided by Westpac and NORD\/LB in the form of a Green Loan that complies with the Loan Market Association Green Loan Principles and the Green Projects requirements.<\/p>\n<blockquote><p>&#8220;We are delighted to see Metz solar farm securing the funds to start construction and contribute to the ongoing energy transition in New South Wales,&#8221; <a href=\"https:\/\/frv.com\/en\/frv-secures-financing-for-metz-solar-farm-in-new-south-wales-australia\/\">said<\/a> Managing Director of FRV in Australia, Carlo Frigerio.<\/p><\/blockquote>\n<p>FRV says it&#8217;s the second green loan for the company in Australia and among the first renewable energy project financing of this nature in this country. Mr. Frigerio said it had been an &#8220;extraordinary&#8221; year for FRV in Australia, with 3 financial close milestones achieved in under 12 months<\/p>\n<p>When construction of Metz does kick off, it&#8217;s expected to provide jobs for up to 100 workers over the course of the 12-month construction phase, and ongoing benefits to the region.<\/p>\n<p>FRV has ten PV projects at various stages in Australia:<\/p>\n<ul>\n<li>Metz &#8211; New South Wales (115MW &#8211; under development)<\/li>\n<li>Moree &#8211; New South Wales (56MW &#8211; operational)<\/li>\n<li>Goonumbla &#8211; New South Wales (69.75MW &#8211; operational)<\/li>\n<li>Sebastapol &#8211; New South Wales (90MW &#8211; under development)<\/li>\n<li>Chaff Mill &#8211; Mintaro, South Australia (115MW &#8211; under development)<\/li>\n<li>Winton &#8211; Victoria (106MW &#8211; under development)<\/li>\n<li>Royalla &#8211; ACT (24MW &#8211; operational)<\/li>\n<li>Clare &#8211; Queensland (125MW &#8211; operational)<\/li>\n<li>Lilyvale &#8211; Queensland (125MW &#8211; operational)<\/li>\n<\/ul>\n<p>and..<\/p>\n<h2>Walla Walla Solar Farm Approved<\/h2>\n<p>In other recent news from FRV, the company announced in late November it had received development approval from the NSW Independent Planning Commission for its proposed 300 MW AC Walla Walla Solar Farm, which will be located between the townships of Walla Walla and Culcairn; approximately 40 kilometres from Albury.<\/p>\n<p>The clean power station will consist of approximately 700,000 <a href=\"https:\/\/www.solarquotes.com.au\/panels\/\">solar panels<\/a> installed across a 605-hectare site that are expected to generate 740 gigawatt-hours annually.<\/p>\n<p>250 construction jobs will be created during the construction period.<\/p>\n<p>Bison Energy initiated the development process for the solar farm in early 2018 and FRV announced it would assume full ownership of and development rights for the Walla Walla project in August last year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fotowatio Renewable Ventures (FRV) has closed financing for the Metz Solar Farm project in New South Wales.<\/p>\n","protected":false},"author":17,"featured_media":46120,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-46119","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Financing Secured For NSW&#039;s Metz Solar Farm - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"Fotowatio Renewable Ventures (FRV) has closed financing for the Metz Solar Farm project in New South Wales.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Financing Secured For NSW&#039;s Metz Solar Farm\" \/>\n<meta property=\"og:description\" content=\"Fotowatio Renewable Ventures (FRV) has closed financing for the Metz Solar Farm project in New South Wales.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-28T20:43:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Financing Secured For NSW&#8217;s Metz Solar Farm\",\"datePublished\":\"2020-12-28T20:43:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/\"},\"wordCount\":503,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/\",\"name\":\"Financing Secured For NSW's Metz Solar Farm - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg\",\"datePublished\":\"2020-12-28T20:43:49+00:00\",\"description\":\"Fotowatio Renewable Ventures (FRV) has closed financing for the Metz Solar Farm project in New South Wales.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Metz solar farm financing\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Financing Secured For NSW&#8217;s Metz Solar Farm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Financing Secured For NSW's Metz Solar Farm - SolarQuotes Blog","description":"Fotowatio Renewable Ventures (FRV) has closed financing for the Metz Solar Farm project in New South Wales.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/","og_locale":"en_US","og_type":"article","og_title":"Financing Secured For NSW's Metz Solar Farm","og_description":"Fotowatio Renewable Ventures (FRV) has closed financing for the Metz Solar Farm project in New South Wales.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2020-12-28T20:43:49+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Financing Secured For NSW&#8217;s Metz Solar Farm","datePublished":"2020-12-28T20:43:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/"},"wordCount":503,"commentCount":1,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/","url":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/","name":"Financing Secured For NSW's Metz Solar Farm - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg","datePublished":"2020-12-28T20:43:49+00:00","description":"Fotowatio Renewable Ventures (FRV) has closed financing for the Metz Solar Farm project in New South Wales.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg","width":1200,"height":630,"caption":"Metz solar farm financing"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Financing Secured For NSW&#8217;s Metz Solar Farm"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/metz-solar-farm.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-bZR","jetpack-related-posts":[{"id":50027,"url":"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-armidale-mb1983\/","url_meta":{"origin":46119,"position":0},"title":"Armidale Council Eager For Metz Solar Farm Construction Kickoff","author":"Michael Bloch","date":"May 5, 2021","format":false,"excerpt":"Armidale Regional Council is looking forward to the economic benefits it expects the Metz Solar Farm and other renewable energy projects will bring to its region. The Metz Solar Farm is a 115 MWac PV power station that will be constructed on a 430-hectare site approximately 15 kilometres from Armidale.\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"The Metz Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/metz-solar-farm.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/metz-solar-farm.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/metz-solar-farm.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/metz-solar-farm.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/metz-solar-farm.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":67982,"url":"https:\/\/www.solarquotes.com.au\/blog\/wollongong-solar-ppa-mb2725\/","url_meta":{"origin":46119,"position":1},"title":"Wollongong Switching To Solar To Power Streetlights","author":"Michael Bloch","date":"November 23, 2022","format":false,"excerpt":"From January 1 next year, Wollongong City Council's 18,000+ streetlights will be running on solar energy via a power purchase agreement (PPA). The PPA contract signed last week by Council and Red Energy will also see 17 of the local government's largest facilities operating on 100% renewable electricity as a\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Wollongong City Council solar PPA","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/wollongong-streetlight-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/wollongong-streetlight-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/wollongong-streetlight-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/wollongong-streetlight-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/wollongong-streetlight-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":16367,"url":"https:\/\/www.solarquotes.com.au\/blog\/ing-clare-solar-farm-mb0285\/","url_meta":{"origin":46119,"position":2},"title":"ING Funding Clare Solar Farm","author":"Michael Bloch","date":"November 2, 2017","format":false,"excerpt":"Banking giant ING has announced it is a participant in financing Clare Solar Farm, one of Australia\u2019s largest PV-based power stations. While ING has previously been involved in financing wind energy projects in Australia, including the MacArthur and Bald Hills wind farms, this will be firm's first involvement in an\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Clare Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/clare-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/clare-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/clare-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/clare-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":27378,"url":"https:\/\/www.solarquotes.com.au\/blog\/bluewater-solar-farm-mb0911\/","url_meta":{"origin":46119,"position":3},"title":"Townsville City Council Approval For Bluewater Solar Farm","author":"Michael Bloch","date":"January 24, 2019","format":false,"excerpt":"Things are looking good for FRV's Bluewater Solar Farm project near Townsville in Queensland, but there are still some hurdles it will need to clear. The proposed 100MWdc\/80MWac\u00a0 facility will be located 7 kilometres north of Bluewater and approximately 38 kilometres north-west of Townsville. It will feature approximately 300,000 solar\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Bluewater Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/bluewater-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":32875,"url":"https:\/\/www.solarquotes.com.au\/blog\/new-england-solar-mb1183\/","url_meta":{"origin":46119,"position":4},"title":"NSW&#8217;s New England Region A Hotbed Of Solar Activity","author":"Michael Bloch","date":"August 22, 2019","format":false,"excerpt":"All going well, the New England region of New South Wales will have gigawatts of additional large-scale solar energy capacity in the not-too-distant future. The New England Region is an inland area in the north of the state that includes the Northern Tablelands and the North West Slopes regions. Major\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar energy in New England","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/solar-new-england.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/solar-new-england.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/solar-new-england.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/solar-new-england.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/solar-new-england.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":17033,"url":"https:\/\/www.solarquotes.com.au\/blog\/snowtown-north-solar-mb0322\/","url_meta":{"origin":46119,"position":5},"title":"Plans Lodged For Snowtown North Solar Farm","author":"Michael Bloch","date":"November 23, 2017","format":false,"excerpt":"Tilt Renewables has reportedly lodged plans for a 45MW solar facility featuring up to 25MW of battery storage near Snowtown with South Australia's State Planning Commission. The proposed solar farm will be constructed next to Tilt Renewables\u2019 existing\u00a0 Snowtown I Wind Farm substation. Lodging of the plans was originally intended\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Snowtown North Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/snowtown-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/snowtown-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/snowtown-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/snowtown-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/46119","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=46119"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/46119\/revisions"}],"predecessor-version":[{"id":46122,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/46119\/revisions\/46122"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/46120"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=46119"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=46119"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=46119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}