{"id":46165,"date":"2020-12-31T07:10:46","date_gmt":"2020-12-30T20:40:46","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=46165"},"modified":"2020-12-31T07:10:46","modified_gmt":"2020-12-30T20:40:46","slug":"jindera-solar-farm-mb1822","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/","title":{"rendered":"NSW IPC Conditionally Approves Jindera Solar Farm"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-46166\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm.jpg\" alt=\"Jindera Solar Farm\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>New South Wales&#8217; Independent Planning Commission last week conditionally approved a major proposed solar power + battery storage project for a site near Jindera in the state&#8217;s Riverina region.<!--more--><\/p>\n<p>Jindera Solar Farm is to be a 150MW(dc) \/ 120MW(ac) PV power station that will incorporate a Battery Energy Storage System (BESS) with maximum capacity of 30MW\/60MWh.<\/p>\n<p>The development footprint would occupy around 327 hectares of the 521-hectare subject land, which is situated approximately 4 kilometres north of <a href=\"https:\/\/www.solarquotes.com.au\/location\/jindera-2642-nsw\/\">Jindera<\/a> and around 20 kilometres north of <a href=\"https:\/\/www.solarquotes.com.au\/location\/albury-2640-nsw\/\">Albury<\/a>. The project area is split in to two solar farm areas linked by a narrow strip. The clean power station will connect to the mains grid via the existing TransGrid Jindera 330\/132kV substation.<\/p>\n<p>Jindera Solar Farm Pty Ltd is a partnership involving Hanwha Energy Corporation and Green Switch Australia. Hanwha Energy Corporation is an affiliate of Hanwha Q Cells, so while not mentioned in the documents I looked at, the chances are pretty good <a href=\"https:\/\/www.solarquotes.com.au\/panels\/hanwha-q-cells-review.html\">Q Cells solar panels<\/a> will be used for the project.<\/p>\n<p>The panels will be installed on single axis trackers to maximise solar energy production. According to Green Switch, it&#8217;s expected the solar farm will generate approximately 275,000 MWh per year and avoid around 92,000 tonnes of greenhouse gas emissions annually.<\/p>\n<p>Around 200 workers would be employed during peak construction of Jindera Solar Farm, and many of these could be drawn from the local area. Approximately 2-3 full-time jobs will be supported on an ongoing basis through the operation and maintenance of the facility, which has an expected service life of 30 years. After that time a decision will be made to either upgrade the facility or to decommission it and restore the land for further agricultural use.<\/p>\n<h2>Solar Energy And Agriculture Collide (Again)<\/h2>\n<p>Just on that point, the site is currently being used for agricultural purposes and this was a sensitive issue for some in the local community who believe it to be high quality agricultural land. Officially, the land capability class of the site is Class 3 (High Capability Land) and Class 6 (Low Capability Land).<\/p>\n<p>During the exhibition period, DPIE received submissions from two community groups,109 members of the public and eleven agencies. Of the submissions from the public, 96 were objections.<\/p>\n<p>Jindera Solar Farm is one of a number of major PV projects on the board for the Greater Hume Shire; including:<\/p>\n<ul>\n<li>Trina Solar&#8217;s &#8211; 200MW(ac) <a href=\"https:\/\/www.solarquotes.com.au\/blog\/glenellen-solar-farm-mb1748\/\">Glenellen Solar Farm<\/a>.<\/li>\n<li>FRV&#8217;s Walla Walla Solar Farm &#8211; 300 MW(ac) (<a href=\"https:\/\/www.solarquotes.com.au\/blog\/metz-solar-farm-mb1818\/\">approved in late November<\/a>).<\/li>\n<li>Neoen&#8217;s <a href=\"https:\/\/www.solarquotes.com.au\/blog\/culcairn-solar-farm-mb1392\/\">Culcairn Solar Farm<\/a> &#8211; 350 MW(ac)<\/li>\n<\/ul>\n<p>Trina Solar Australia is addressing the common concern surrounding using agricultural land for solar farms by proposing the Glenellen site could continue to be utilised for agricultural purposes such as sheep grazing, or perhaps even cropping. This proposal will be particularly important for getting the Glenellen project getting over the line as the site is classified as Important Agricultural Land.<\/p>\n<p>While the Jindera Solar Farm project has the green light to proceed, this is contingent on <a href=\"https:\/\/www.ipcn.nsw.gov.au\/resources\/pac\/media\/files\/pac\/projects\/2020\/10\/jindera-solar-farm-ssd-9549\/determination\/201222_jindera-solar-farm--final-development-consent.pdf\">60 conditions<\/a> imposed by the Independent Planning Commission being met.<\/p>\n<p>Further information on Jindera Solar Farm can be found on the NSW Government&#8217;s <a href=\"https:\/\/www.planningportal.nsw.gov.au\/major-projects\/project\/9811\">Major Projects web site<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>New South Wales&#8217; Independent Planning Commission last week conditionally approved a major proposed solar power + battery storage project for a site near Jindera in the state&#8217;s Riverina region.<\/p>\n","protected":false},"author":17,"featured_media":46166,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-46165","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>NSW IPC Conditionally Approves Jindera Solar Farm - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"A major proposed solar power + battery storage project for a site near Jindera in NSW&#039;s Riverina region was conditionally approved last week.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NSW IPC Conditionally Approves Jindera Solar Farm\" \/>\n<meta property=\"og:description\" content=\"A major proposed solar power + battery storage project for a site near Jindera in NSW&#039;s Riverina region was conditionally approved last week.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-30T20:40:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"NSW IPC Conditionally Approves Jindera Solar Farm\",\"datePublished\":\"2020-12-30T20:40:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/\"},\"wordCount\":527,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/jindera-solar-farm.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/\",\"name\":\"NSW IPC Conditionally Approves Jindera Solar Farm - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/jindera-solar-farm.jpg\",\"datePublished\":\"2020-12-30T20:40:46+00:00\",\"description\":\"A major proposed solar power + battery storage project for a site near Jindera in NSW's Riverina region was conditionally approved last week.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/jindera-solar-farm.jpg\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/jindera-solar-farm.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Jindera Solar Farm\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/jindera-solar-farm-mb1822\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/solar-battery-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"NSW IPC Conditionally Approves Jindera Solar Farm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/michael\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"NSW IPC Conditionally Approves Jindera Solar Farm - SolarQuotes Blog","description":"A major proposed solar power + battery storage project for a site near Jindera in NSW's Riverina region was conditionally approved last week.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/","og_locale":"en_US","og_type":"article","og_title":"NSW IPC Conditionally Approves Jindera Solar Farm","og_description":"A major proposed solar power + battery storage project for a site near Jindera in NSW's Riverina region was conditionally approved last week.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2020-12-30T20:40:46+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"NSW IPC Conditionally Approves Jindera Solar Farm","datePublished":"2020-12-30T20:40:46+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/"},"wordCount":527,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/","url":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/","name":"NSW IPC Conditionally Approves Jindera Solar Farm - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm.jpg","datePublished":"2020-12-30T20:40:46+00:00","description":"A major proposed solar power + battery storage project for a site near Jindera in NSW's Riverina region was conditionally approved last week.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm.jpg","width":1200,"height":630,"caption":"Jindera Solar Farm"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/jindera-solar-farm-mb1822\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"NSW IPC Conditionally Approves Jindera Solar Farm"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jindera-solar-farm.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-c0B","jetpack-related-posts":[{"id":21900,"url":"https:\/\/www.solarquotes.com.au\/blog\/wellington-solar-farm-approved-mb0605\/","url_meta":{"origin":46165,"position":0},"title":"Green Light For Wellington Solar + Storage Facility","author":"Michael Bloch","date":"May 30, 2018","format":false,"excerpt":"The town of Wellington in New South Wales will soon have a new neighbour, a 174 megawatt solar farm that will also feature battery storage. We first mentioned the Wellington Solar Farm project back in December, during the public feedback phase. Last Friday, the NSW Department of Planning and Environment\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Wellington Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/wellington-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/wellington-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/wellington-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/05\/wellington-solar-farm.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":25759,"url":"https:\/\/www.solarquotes.com.au\/blog\/wemen-gannawarra-solar-storage-mb0822\/","url_meta":{"origin":46165,"position":1},"title":"More Large-Scale Solar And Energy Storage Progress In Victoria","author":"Michael Bloch","date":"November 13, 2018","format":false,"excerpt":"Gannawarra Solar Farm is operating at full capacity, construction of its colocated battery system has been completed and Wemen Solar Farm is connected to the grid says developer Wirsol. Gannawarra Solar Farm\/Energy Storage System Wirsol announced yesterday the 60MW Gannawarra Solar Farm 13 kilometres west of Kerang in north-west Victoria\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Gannawarra Energy Storage System - Tesla Powerpack","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/tesla-powerpack-gannawarra.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":38024,"url":"https:\/\/www.solarquotes.com.au\/blog\/new-england-solar-mb1438\/","url_meta":{"origin":46165,"position":2},"title":"Green Light For NSW&#8217;s 720MW New England Solar Farm","author":"Michael Bloch","date":"March 10, 2020","format":false,"excerpt":"New South Wales' Independent Planning Commission yesterday conditionally approved development of a $768-million solar farm in the Northern Tablelands region. UPC Renewables' New England Solar Farm is to be situated around 6 kilometres east of Uralla. According to the Commission, the project will be comprised of more than 2.4 million\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"New England Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/03\/new-england-solar-farm.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/03\/new-england-solar-farm.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/03\/new-england-solar-farm.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/03\/new-england-solar-farm.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/03\/new-england-solar-farm.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":44288,"url":"https:\/\/www.solarquotes.com.au\/blog\/birdwood-solar-storage-mb1738\/","url_meta":{"origin":46165,"position":3},"title":"Birdwood Solar and Storage Project Progresses","author":"Michael Bloch","date":"October 28, 2020","format":false,"excerpt":"A development application has been conditionally approved by Adelaide Hills Council for a solar farm with battery storage on the outskirts of Birdwood. But the project going ahead is not a done deal. Tetris Energy wants to build a 4.98MWac solar facility it says will generate an estimated 12,500 MWh\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Birdwood Solar And Storage Project","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/birdwood-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/birdwood-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/birdwood-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/birdwood-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/10\/birdwood-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":71863,"url":"https:\/\/www.solarquotes.com.au\/blog\/glenrowan-solar-farm-mb2847\/","url_meta":{"origin":46165,"position":4},"title":"Glenrowan Solar Farm Construction Gets Cranking","author":"Michael Bloch","date":"March 2, 2023","format":false,"excerpt":"Victoria's Andrews Government has announced construction of Glenrowan Solar Farm in the state's north-east has commenced. The project was the first to score a guernsey under the second Victorian Renewable Energy Target Auction (VRET2). \u201cVictoria\u2019s historic VRET2 auction is helping to supply all Victorian Government operations with 100 per cent\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Glenrowan Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/glenrowan-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/glenrowan-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/glenrowan-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/glenrowan-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/glenrowan-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":52133,"url":"https:\/\/www.solarquotes.com.au\/blog\/stubbo-solar-farm-approved-mb2079\/","url_meta":{"origin":46165,"position":5},"title":"Green Light For 400MW Solar, 200MWh Battery Facility In NSW","author":"Michael Bloch","date":"July 16, 2021","format":false,"excerpt":"A huge solar power and battery storage facility for New South Wales' Mid-Western Regional Council area has been given the State Government's blessing. We last mentioned UPC\/AC Renewables Australia's[1. A joint venture between UPC Renewables Group and AC Energy] proposed Stubbo Solar Farm project in April last year after a\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Stubbo Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/stubbo-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/stubbo-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/stubbo-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/stubbo-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/stubbo-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/46165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=46165"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/46165\/revisions"}],"predecessor-version":[{"id":46168,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/46165\/revisions\/46168"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/46166"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=46165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=46165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=46165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}