{"id":49545,"date":"2021-04-21T08:09:12","date_gmt":"2021-04-20T21:39:12","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=49545"},"modified":"2021-04-21T08:09:12","modified_gmt":"2021-04-20T21:39:12","slug":"deakin-renewable-microgrid-mb1965","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/","title":{"rendered":"Deakin Renewable Energy Microgrid Officially Opened"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-49546\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid.jpg\" alt=\"Deakin Renewable Energy Microgrid\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>The $23 million Deakin Renewable Energy Microgrid at Deakin University&#8217;s Geelong Waurn Ponds campus was officially opened yesterday.<!--more--><\/p>\n<p>Among those attending the event was Dr Alan Finkel AO, previously Australia&#8217;s Chief Scientist and currently Special Adviser to the Federal Government on Low Emissions Technology; who along with Deakin Vice-Chancellor Professor Iain Martin &#8220;turned the key&#8221; on the project.<\/p>\n<p>The stars of the microgrid are a 7-megawatt solar farm (23,000 solar panels) &#8211; claimed to be the largest solar farm built on an Australian university campus &#8211; and a 2 megawatt-hour central battery storage system situated on 14.5 hectares of farmland at the rear of the Waurn Ponds Campus.<\/p>\n<p>The central battery is based on lithium iron phosphate (LiFePO\u2084) chemistry, chosen for the project as it is &#8220;very stable, safer, has a longer lifetime and avoids the use of cobalt, a material that can have ethical and social impacts in its production.&#8221;<\/p>\n<p>Additionally, 250kW of distributed rooftop solar power system capacity (833 panels) has been installed across campus rooftops along with associated battery systems with a collective capacity of 30 kilowatt-hours.<\/p>\n<p>Another element of the microgrid project is a Research, Teaching and Visualisation Centre that has been established in the Centre for Advanced Design Engineering Training (CADET) building. This will also provide opportunities to schools, other universities and community interest groups to learn more about renewable energy.<\/p>\n<p>Deakin&#8217;s campus at <a href=\"https:\/\/www.solarquotes.com.au\/location\/waurn-ponds-3216-vic\/\">Waurn Ponds<\/a> was chosen from the microgrid project as it&#8217;s the centre of the University&#8217;s energy research and provides opportunities to simulate broader community and city environments.<\/p>\n<blockquote><p>&#8220;The research focus incorporated into the design of the infrastructure builds on consultation with universities around the world, including Princeton and the University of California at San Diego,&#8221; said Dr Adrian Panow, Director of Deakin Energy.<\/p><\/blockquote>\n<h2>A Big Step Towards 100% Renewables<\/h2>\n<p>The microgrid is expected to meet more than half of campus electricity consumption and avoid 12,000 tonnes of greenhouse gas emissions each year, playing a very important role in Deakin University&#8217;s commitment to be carbon neutral and using 100% renewable electricity by 2025 (previously 2030). By 2030, Deakin is aiming to achieve carbon negative by abating more carbon than the institution generates.<\/p>\n<p>The University is currently also purchasing renewables-generated electricity through the Melbourne Renewable Energy Project 2 buying group. Most of the electricity under that arrangement is being sourced from the 28.7MW Yaloak South Wind Farm, which is situated approximately 15 kilometres south of Ballan; around one hour west of Melbourne.<\/p>\n<blockquote><p>&#8220;We want to be a working example \u2013 a &#8216;living lab&#8217; \u2013 of how a large organisation can lead through its actions and fundamentally change its ways of doing,&#8221; <a href=\"https:\/\/www.deakin.edu.au\/about-deakin\/media-releases\/articles\/deakin-unveils-largest-ever-solar-farm-at-an-australian-university\">said<\/a> Vice-Chancellor Professor Martin. &#8220;This includes the complete, systemic integration of sustainability across all our activities.&#8221;<\/p><\/blockquote>\n<p>In his address at the opening, Professor Martin also stressed achieving a sustainable energy future in Australia will require a bi-partisan political commitment over the next few decades.<\/p>\n<blockquote><p>&#8220;The political and community leadership required will be significant.&#8221;<\/p><\/blockquote>\n<p>The Deakin microgrid\u00a0 project was carried out through a partnership with AusNet Services via its independent subsidiary, Mondo Power.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The $23 million Deakin Renewable Energy Microgrid at Deakin University&#8217;s Geelong Waurn Ponds campus was officially opened yesterday.<\/p>\n","protected":false},"author":17,"featured_media":49546,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-49545","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Deakin Renewable Energy Microgrid Officially Opened - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"The $23 million Deakin Renewable Energy Microgrid at Deakin University&#039;s Geelong Waurn Ponds campus was officially opened yesterday.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deakin Renewable Energy Microgrid Officially Opened\" \/>\n<meta property=\"og:description\" content=\"The $23 million Deakin Renewable Energy Microgrid at Deakin University&#039;s Geelong Waurn Ponds campus was officially opened yesterday.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-04-20T21:39:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Deakin Renewable Energy Microgrid Officially Opened\",\"datePublished\":\"2021-04-20T21:39:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/\"},\"wordCount\":506,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/deakin-microgrid.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/\",\"name\":\"Deakin Renewable Energy Microgrid Officially Opened - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/deakin-microgrid.jpg\",\"datePublished\":\"2021-04-20T21:39:12+00:00\",\"description\":\"The $23 million Deakin Renewable Energy Microgrid at Deakin University's Geelong Waurn Ponds campus was officially opened yesterday.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/deakin-microgrid.jpg\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/deakin-microgrid.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Deakin Renewable Energy Microgrid\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/deakin-renewable-microgrid-mb1965\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/solar-battery-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deakin Renewable Energy Microgrid Officially Opened\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/michael\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Deakin Renewable Energy Microgrid Officially Opened - SolarQuotes Blog","description":"The $23 million Deakin Renewable Energy Microgrid at Deakin University's Geelong Waurn Ponds campus was officially opened yesterday.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/","og_locale":"en_US","og_type":"article","og_title":"Deakin Renewable Energy Microgrid Officially Opened","og_description":"The $23 million Deakin Renewable Energy Microgrid at Deakin University's Geelong Waurn Ponds campus was officially opened yesterday.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2021-04-20T21:39:12+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Deakin Renewable Energy Microgrid Officially Opened","datePublished":"2021-04-20T21:39:12+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/"},"wordCount":506,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/","url":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/","name":"Deakin Renewable Energy Microgrid Officially Opened - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid.jpg","datePublished":"2021-04-20T21:39:12+00:00","description":"The $23 million Deakin Renewable Energy Microgrid at Deakin University's Geelong Waurn Ponds campus was officially opened yesterday.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid.jpg","width":1200,"height":630,"caption":"Deakin Renewable Energy Microgrid"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/deakin-renewable-microgrid-mb1965\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Deakin Renewable Energy Microgrid Officially Opened"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/deakin-microgrid.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-cT7","jetpack-related-posts":[{"id":20558,"url":"https:\/\/www.solarquotes.com.au\/blog\/deakin-university-solar-microgrid-mb0531\/","url_meta":{"origin":49545,"position":0},"title":"Deakin University Solar Powered Microgrid Project Moving Along","author":"Michael Bloch","date":"April 4, 2018","format":false,"excerpt":"Deakin University has called for contractors and suppliers to register their interest in working on the construction of its microgrid project. In December last year, Deakin University announced it would be establishing a 7.25MW microgrid[1. A microgrid is a local network of electricity generation sources that can operate either interconnected\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Deakin University microgrid project","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/deakin-university-microgrid.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/deakin-university-microgrid.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/deakin-university-microgrid.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/04\/deakin-university-microgrid.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":49641,"url":"https:\/\/www.solarquotes.com.au\/blog\/geelong-energy-future-mb1970\/","url_meta":{"origin":49545,"position":1},"title":"Geelong&#8217;s Energy Future &#8211; Without Gas","author":"Michael Bloch","date":"April 26, 2021","format":false,"excerpt":"Geelong's energy future was discussed at a sold-out event last week, convened in response to plans for more gas infrastructure in the city. Viva Energy is seeking approval to develop a gas terminal at the Geelong Refinery, which would bring the fossil fuel from various locations in Australia. Viva says\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Geelong's Energy Future","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/geelong-renewable-energy.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/geelong-renewable-energy.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/geelong-renewable-energy.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/geelong-renewable-energy.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/04\/geelong-renewable-energy.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":18471,"url":"https:\/\/www.solarquotes.com.au\/blog\/monash-university-microgrid-mb0420\/","url_meta":{"origin":49545,"position":2},"title":"InGRID AGM Energy Control System To Manage Monash Uni Microgrid","author":"Michael Bloch","date":"January 18, 2018","format":false,"excerpt":"Madrid-based Indra says it has been selected by Melbourne's Monash University as a key technology partner in MU's Clayton campus solar powered microgrid project. A microgrid is a local network of electricity generation sources connected to the mains grid that can also operate while disconnected from it (\"island mode\"), continuing\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar panels at Monash University, Melbourne","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-panels-monash-university.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-panels-monash-university.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-panels-monash-university.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/01\/solar-panels-monash-university.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":32829,"url":"https:\/\/www.solarquotes.com.au\/blog\/roseworthy-solar-farm-mb1182\/","url_meta":{"origin":49545,"position":3},"title":"Roseworthy Solar Farm Construction Begins","author":"Michael Bloch","date":"August 21, 2019","format":false,"excerpt":"Work commenced yesterday at the University of Adelaide\u2019s Roseworthy campus on a solar farm with battery storage that will form part of a microgrid. The 1.2MW solar energy facility will incorporate a 420kw\/1200kWh hybrid energy storage element - a combination of lithium-ion and vanadium flow batteries[1. When originally announced in\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar and energy storage project at Roseworthy","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/roseworthy-solar-storage.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/roseworthy-solar-storage.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/roseworthy-solar-storage.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/roseworthy-solar-storage.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/08\/roseworthy-solar-storage.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":22664,"url":"https:\/\/www.solarquotes.com.au\/blog\/onslow-microgrid-project-mb0653\/","url_meta":{"origin":49545,"position":4},"title":"Stage One Of Onslow Microgrid Project Completed","author":"Michael Bloch","date":"July 4, 2018","format":false,"excerpt":"The residents of Onslow in Western Australia are a major step closer to a more reliable and less carbon-intensive electricity supply. Onslow is a coastal town with a population of around 860 located in Western Australia's Pilbara region, and is approximately 1,400 kilometres north of Perth. Due to its remote\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Onslow Power Project","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/onslow-renewables-microgrid.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/onslow-renewables-microgrid.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/onslow-renewables-microgrid.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/onslow-renewables-microgrid.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":28733,"url":"https:\/\/www.solarquotes.com.au\/blog\/onslow-microgrid-solar-mb0976\/","url_meta":{"origin":49545,"position":5},"title":"Stage Two Of Onslow Microgrid Project Kicks Off","author":"Michael Bloch","date":"March 15, 2019","format":false,"excerpt":"Western Australia's McGowan Government has announced work on the second stage of Onslow's microgrid project - the Onslow Renewable Energy Pilot - has commenced. Situated approximately 1,400 kilometres north of Perth, Onslow is a coastal town with a growing demand for electricity. Back in 2014, Horizon Power installed a temporary\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Onlslow renewable energy pilot","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/onslow-renewable-energy.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/onslow-renewable-energy.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/onslow-renewable-energy.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/onslow-renewable-energy.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/03\/onslow-renewable-energy.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/49545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=49545"}],"version-history":[{"count":3,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/49545\/revisions"}],"predecessor-version":[{"id":49549,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/49545\/revisions\/49549"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/49546"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=49545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=49545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=49545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}