{"id":50744,"date":"2021-05-31T06:19:58","date_gmt":"2021-05-30T19:49:58","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=50744"},"modified":"2021-05-31T06:19:58","modified_gmt":"2021-05-30T19:49:58","slug":"hunter-water-solar-mb2015","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/","title":{"rendered":"Hunter Water Solar Rollout Progress"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-50745\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg\" alt=\"Hunter Water and solar power\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Another installation has recently been completed in NSW&#8217;s Hunter Water&#8217;s shift to harnessing solar energy to help power its operations.<!--more--><\/p>\n<p>As with all water utilities, electricity is a major cost for Hunter Water &#8211; around 10 per cent of operating expenses &#8211; and a major contributor to its carbon footprint. Over the three year baseline period from 2014\/15 &#8211; 2016\/17, electricity accounted for 70% of its overall emissions.<\/p>\n<p>In July last year, New South Wales\u2019 Berejiklian government announced an <a href=\"https:\/\/www.solarquotes.com.au\/blog\/solar-hunter-water-mb1619\/\">investment of more than $15 million<\/a> for the installation of solar power and other renewable energy systems at Hunter Water facilities,\u00a0 which is a state-owned corporation providing drinking, wastewater, recycled and some stormwater services to around 600,000 people across <a href=\"https:\/\/www.solarquotes.com.au\/installers\/cities\/newcastle\/\">Newcastle<\/a> and the Lower Hunter region.<\/p>\n<p>Since that announcement, a 99.7kW system has been fully commissioned at Branxton Wastewater Treatment Works, consisting of 252 <a href=\"https:\/\/www.solarquotes.com.au\/panels\/\"> solar panels<\/a>. The lessons from that project have paved the way for another &#8211; the installation of 1,200 solar panels at Morpeth Wastewater Treatment Works. At 600kW, it&#8217;s a big jump up from the Branxton installation.<\/p>\n<p>There&#8217;s much more solar (and battery storage) to come in the years ahead. The next sites in line during the first stage of the rollout are wastewater treatment plants at <a href=\"https:\/\/www.solarquotes.com.au\/location\/kurri-kurri-2327-nsw\/\">Kurri Kurri<\/a>, <a href=\"https:\/\/www.solarquotes.com.au\/location\/raymond-terrace-2324-nsw\/\"> Raymond Terrace<\/a> and Boulder Bay. Stage two of the project will see the Branxton plant&#8217;s installation expanded and systems installed at Cessnock and Shortland&#8217;s wastewater treatment facilities. Floating solar farms are on the cards for Grahamstown Dam and Edgeworth Wastewater Treatment Works.<\/p>\n<blockquote><p>\u201cOnce completed, we estimate the renewable energy project will deliver a 12 per cent reduction in consumption per year and provide an annual saving of $1.15 million on our electricity costs,\u201d said Mr. Cleary.<\/p><\/blockquote>\n<p>Hunter Water is also exploring opportunities for self-generation through wind, pumped hydro and biogas, and renewable energy power purchase agreements.<\/p>\n<h2>Australia&#8217;s Water Sector Going Big On Solar<\/h2>\n<p>Among other water utilities across Australia embracing PV in a big way is South Australia&#8217;s SA Water. As at the end of last month, the utility had installed <a href=\"https:\/\/www.solarquotes.com.au\/blog\/sa-water-solar-mb1890\/\">more than 360,000 panels<\/a> on various assets throughout the state as part of its Zero Cost Energy Future initiative. SA Water was also looking at a floating installation &#8211; but while logistically feasible, further assessment indicated it was not cost-effective and it did not proceed with further investigation.<\/p>\n<p>Across the border in Victoria, work was to have started earlier this year on what will be one of the largest behind-the-meter solar power systems in Australia &#8211; Melbourne Water\u2019s whopping <a href=\"https:\/\/www.solarquotes.com.au\/blog\/melbourne-water-solar-mb1804\/\">17MW installation<\/a> at its Eastern Treatment Plant. Another plant is in the pipeline (so to speak) for panels &#8211; Winneke treatment plant.<\/p>\n<p>Melbourne Water has pledged to halve its emissions by 2025 and says it is on a path to reduce them to net zero by 2030. Other projects to help towards these goals include building three more mini-hydro power stations and constructing additional biogas generating capacity at its Western Treatment Plant.<\/p>\n<p>These three utilities aren&#8217;t the only ones to have turned or are turning to the power of PV and other renewables. Back in 2018, a University of Queensland study estimated the Australian water industry <a href=\"https:\/\/www.solarquotes.com.au\/blog\/renewables-water-industry-mb1368\/\">generated around 18% of it its electricity<\/a> from on-site renewables. At that point there was little solar involved, but that has changed greatly since.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Another installation has recently been completed in NSW&#8217;s Hunter Water&#8217;s shift to harnessing solar energy to help power its operations.<\/p>\n","protected":false},"author":17,"featured_media":50745,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-50744","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Hunter Water Solar Rollout Progress - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"Another installation has recently been completed in NSW&#039;s Hunter Water&#039;s shift to harnessing solar energy to help power its operations.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hunter Water Solar Rollout Progress\" \/>\n<meta property=\"og:description\" content=\"Another installation has recently been completed in NSW&#039;s Hunter Water&#039;s shift to harnessing solar energy to help power its operations.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-05-30T19:49:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Hunter Water Solar Rollout Progress\",\"datePublished\":\"2021-05-30T19:49:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/\"},\"wordCount\":550,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/\",\"name\":\"Hunter Water Solar Rollout Progress - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg\",\"datePublished\":\"2021-05-30T19:49:58+00:00\",\"description\":\"Another installation has recently been completed in NSW's Hunter Water's shift to harnessing solar energy to help power its operations.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Hunter Water and solar power\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Hunter Water Solar Rollout Progress\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Hunter Water Solar Rollout Progress - SolarQuotes Blog","description":"Another installation has recently been completed in NSW's Hunter Water's shift to harnessing solar energy to help power its operations.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/","og_locale":"en_US","og_type":"article","og_title":"Hunter Water Solar Rollout Progress","og_description":"Another installation has recently been completed in NSW's Hunter Water's shift to harnessing solar energy to help power its operations.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2021-05-30T19:49:58+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Hunter Water Solar Rollout Progress","datePublished":"2021-05-30T19:49:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/"},"wordCount":550,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/","url":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/","name":"Hunter Water Solar Rollout Progress - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg","datePublished":"2021-05-30T19:49:58+00:00","description":"Another installation has recently been completed in NSW's Hunter Water's shift to harnessing solar energy to help power its operations.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg","width":1200,"height":630,"caption":"Hunter Water and solar power"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/hunter-water-solar-mb2015\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Hunter Water Solar Rollout Progress"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/hunter-water-solar.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-dcs","jetpack-related-posts":[{"id":41684,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-hunter-water-mb1619\/","url_meta":{"origin":50744,"position":0},"title":"Solar Energy Rollout For Hunter Water","author":"Michael Bloch","date":"July 28, 2020","format":false,"excerpt":"New South Wales' Berejiklian government is investing more than $15 million for the installation of solar power and other renewable energy systems at Hunter Water facilities. Hunter Water is a state-owned corporation providing drinking water and wastewater, recycled water and some stormwater services to around 600,000 people across the Lower\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar energy - Hunter Water","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/07\/hunter-water-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/07\/hunter-water-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/07\/hunter-water-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/07\/hunter-water-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/07\/hunter-water-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":36901,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-hospitals-nsw-mb1387\/","url_meta":{"origin":50744,"position":1},"title":"Solar Power At More NSW Hospitals","author":"Michael Bloch","date":"January 30, 2020","format":false,"excerpt":"In New South Wales, another four hospitals are being funded by the Berejiklian Government for the installation of solar power systems. According to a brief release published yesterday, Hornsby Ku-ring-gai, Fairfield, Canterbury and John Hunter hospitals will receive $8.1 million in total to install solar panels. The biggest system will\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar energy - John Hunter Hospital","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/01\/john-hunter-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/01\/john-hunter-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/01\/john-hunter-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/01\/john-hunter-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/01\/john-hunter-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":47441,"url":"https:\/\/www.solarquotes.com.au\/blog\/hne-health-solar-mb1871\/","url_meta":{"origin":50744,"position":2},"title":"NSW&#8217;s Hunter New England Health Heading For Carbon Neutral","author":"Michael Bloch","date":"February 9, 2021","format":false,"excerpt":"Lots of solar panels and electric cars are on the cards for New South Wales' Hunter New England Health as it strives for carbon neutrality by 2030. Hunter New England Health provides a range of public health services to the Hunter, New England and Lower Mid North Coast regions of\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Hunter New England Health - solar power","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/hne-health-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/hne-health-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/hne-health-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/hne-health-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/02\/hne-health-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":58811,"url":"https:\/\/www.solarquotes.com.au\/blog\/hunter-solar-ppa-mb2353\/","url_meta":{"origin":50744,"position":3},"title":"Six Hunter Councils Sign Up For More Solar Power","author":"Michael Bloch","date":"February 11, 2022","format":false,"excerpt":"A collective of six councils in NSW's Hunter region have inked a 10-year Power Purchase Agreement with Mojo Power. The Councils involved are: Lake Macquarie City Upper Hunter Shire Maitland City Cessnock City Muswellbrook Shire Central Coast Commenting on the arrangement, Central Coast Council's Natalia Cowley said by banding together\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Mojo solar power purchase agreement","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/02\/mojo-hunter-ppa.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/02\/mojo-hunter-ppa.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/02\/mojo-hunter-ppa.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/02\/mojo-hunter-ppa.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/02\/mojo-hunter-ppa.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":52212,"url":"https:\/\/www.solarquotes.com.au\/blog\/cessnock-city-solar-mb2084\/","url_meta":{"origin":50744,"position":4},"title":"Cessnock City Council Switches On New Solar Power Installations","author":"Michael Bloch","date":"July 21, 2021","format":false,"excerpt":"New South Wales' Cessnock City Council is making good on its Cities Power Partnership pledges, with the installation of several solar power systems complete and now operational. The Cities Power Partnership is a climate network boasting more than 140 local governments among its membership. Those signing on to the initiative\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Cessnock City Council - solar panels","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/cessnock-solar-panels.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/cessnock-solar-panels.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/cessnock-solar-panels.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/cessnock-solar-panels.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/cessnock-solar-panels.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":41486,"url":"https:\/\/www.solarquotes.com.au\/blog\/armidale-hospital-solar-mb1611\/","url_meta":{"origin":50744,"position":5},"title":"Huge Rooftop Solar Energy System For Armidale Hospital","author":"Michael Bloch","date":"July 22, 2020","format":false,"excerpt":"While COVID-19 clouds continue to hang over the healthcare sector, a ray of sunshine has appeared for Armidale Hospital, which will be getting a thumping great solar power system installed. A $950,000 grant announced on Monday by Northern Tablelands MP Adam Marshall and NSW Energy Minister Matt Kean will support\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Armidale Hospital - solar energy","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/07\/armidale-hospital-solar-2.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/07\/armidale-hospital-solar-2.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/07\/armidale-hospital-solar-2.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/07\/armidale-hospital-solar-2.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/07\/armidale-hospital-solar-2.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/50744","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=50744"}],"version-history":[{"count":4,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/50744\/revisions"}],"predecessor-version":[{"id":50749,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/50744\/revisions\/50749"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/50745"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=50744"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=50744"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=50744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}