{"id":52588,"date":"2021-08-03T06:22:45","date_gmt":"2021-08-02T19:52:45","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=52588"},"modified":"2021-08-03T06:22:45","modified_gmt":"2021-08-02T19:52:45","slug":"jabiru-power-station-mb2100","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/","title":{"rendered":"Jabiru Hybrid Renewable Project Powering Ahead"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone size-full wp-image-52589\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg\" alt=\"Jabiru Hybrid Renewable Energy Project\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Clearing works have been completed for the construction of a new hybrid solar\/storage\/diesel power plant in the Northern Territory&#8217;s Jabiru.<!--more--><\/p>\n<p>Jabiru, around 250 kilometres east of Darwin and in the midst of Kakadu National Park, was a town purpose-built in the 1980&#8217;s to service Energy Resources of Australia\u2019s (ERA\u2019s) Ranger uranium mine. With ERA ceasing mining and processing operations at Ranger in January this year, the town&#8217;s future was uncertain.<\/p>\n<p>So too was the future of Jabiru&#8217;s electricity supply, as that is currently supplied by ERA from diesel generators at the Ranger mine. But as part of the Northern Territory Government\u2019s $135.5 million dollar investment in the town and Kakadu, Jabiru can look forward to an energy future <a href=\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-renewable-energy-mb1808\/\">part powered by renewables<\/a>.<\/p>\n<blockquote><p>\u201cJabiru is an important town, and the gateway to Kakadu National Park and the West Arnhem Region,&#8221; said NT Chief Minister Michael Gunner. \u201cWe are investing millions into Jabiru to transform it into the tourism and services hub we know it will one day be.&#8221;<\/p><\/blockquote>\n<p><a href=\"https:\/\/edlenergy.com\/project\/jabiru\/\">EDL<\/a> has been contracted by the Northern Territory Government to deliver the Jabiru Hybrid Renewable Project, which will consist of 4.5MW of diesel generators, a 3.9MW solar farm and a 3MW\/5MWh battery. EDL says at least 50% of Jabiru&#8217;s electricity will come from solar energy over the long term.<\/p>\n<p>The facility will be able to power the equivalent of 2,000 homes &#8211; and there were around 626 dwellings in Jabiru as at the 2016 Census.<\/p>\n<p>Site clearing and preparation commenced in mid-June and with that now done, EDL can start hooking into power plant construction. It&#8217;s expected the diesel power station element will be completed by the end this year, and the solar farm and battery will come online in early 2022.<\/p>\n<p>During the clearing and preparation, EDL worked with the <a href=\"https:\/\/www.mirarr.net\/what-we-do\/djurrubu-rangers\">Djurrubu Rangers<\/a> &#8211; a group providing professional land management services across the Kakadu region.<\/p>\n<blockquote><p>&#8220;This collaboration with the Rangers was a great opportunity for EDL and our contractors to work with local traditional owners and learn about the culture, land and local fauna and flora,&#8221; <a href=\"https:\/\/newsroom.nt.gov.au\/mediaRelease\/34733\">said<\/a> EDL Chief Executive Officer James Harman.<\/p><\/blockquote>\n<p>EDL has been in the power plant game for more than 30 years. Its first project was the Pine Creek Power Station in the Territory, which comprises two 10MW gas turbines equipped with heat recovery steam generators coupled to a 7MW steam turbine.<\/p>\n<p>Once complete, Jabiru Hybrid Renewable Project will be EDL&#8217;s 100th site world-wide.<\/p>\n<h2>NT Renewable Energy Target &#8211; How Goes It?<\/h2>\n<p>The Jabiru project will contribute to Northern Territory\u2019s target of 50% renewable energy by 2030. And just on that, it seems the Territory&#8217;s journey towards the goal is rather bumpy<\/p>\n<p>According to RenewEconomy&#8217;s Giles Parkinson, NT&#8217;s renewables share is sitting around <a href=\"https:\/\/reneweconomy.com.au\/scared-of-solar-why-the-top-ends-first-big-solar-farms-are-not-switched-on\/\">just 7 per cent<\/a> and there are several utility-scale solar farms totalling 55MW capacity sitting idle because they are yet to secure approval to be switched on<\/p>\n<p>There&#8217;s certainly plenty of other solar capacity also proposed for the Territory, including the massive <a href=\"https:\/\/www.solarquotes.com.au\/blog\/aapl-solar-agreement-mb1859\/\">Sun Cable project<\/a>.\u00a0 The Australia-ASEAN Power Link (AAPL) is a $22 billion, 13.1GW solar farm across 12,000 hectares, along with 33 gigawatt hours of energy storage that will supply Darwin, Singapore and ASEAN markets &#8211; the latter two via an incredibly long <a href=\"https:\/\/www.solarquotes.com.au\/blog\/suncable-hvdc\/\">HVDC submarine cable<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Clearing works have been completed for the construction of a new hybrid solar\/storage\/diesel power plant in the Northern Territory&#8217;s Jabiru.<\/p>\n","protected":false},"author":17,"featured_media":52589,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-52588","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Jabiru Hybrid Renewable Project Powering Ahead - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"Clearing works have been completed for the construction of a new hybrid solar\/storage\/diesel power plant in the Northern Territory&#039;s Jabiru.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Jabiru Hybrid Renewable Project Powering Ahead\" \/>\n<meta property=\"og:description\" content=\"Clearing works have been completed for the construction of a new hybrid solar\/storage\/diesel power plant in the Northern Territory&#039;s Jabiru.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-08-02T19:52:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Jabiru Hybrid Renewable Project Powering Ahead\",\"datePublished\":\"2021-08-02T19:52:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/\"},\"wordCount\":550,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/\",\"name\":\"Jabiru Hybrid Renewable Project Powering Ahead - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg\",\"datePublished\":\"2021-08-02T19:52:45+00:00\",\"description\":\"Clearing works have been completed for the construction of a new hybrid solar\/storage\/diesel power plant in the Northern Territory's Jabiru.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Jabiru Hybrid Renewable Energy Project\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Jabiru Hybrid Renewable Project Powering Ahead\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Jabiru Hybrid Renewable Project Powering Ahead - SolarQuotes Blog","description":"Clearing works have been completed for the construction of a new hybrid solar\/storage\/diesel power plant in the Northern Territory's Jabiru.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/","og_locale":"en_US","og_type":"article","og_title":"Jabiru Hybrid Renewable Project Powering Ahead","og_description":"Clearing works have been completed for the construction of a new hybrid solar\/storage\/diesel power plant in the Northern Territory's Jabiru.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2021-08-02T19:52:45+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Jabiru Hybrid Renewable Project Powering Ahead","datePublished":"2021-08-02T19:52:45+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/"},"wordCount":550,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/","url":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/","name":"Jabiru Hybrid Renewable Project Powering Ahead - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg","datePublished":"2021-08-02T19:52:45+00:00","description":"Clearing works have been completed for the construction of a new hybrid solar\/storage\/diesel power plant in the Northern Territory's Jabiru.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg","width":1200,"height":630,"caption":"Jabiru Hybrid Renewable Energy Project"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-power-station-mb2100\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Jabiru Hybrid Renewable Project Powering Ahead"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/jabiru-hybrid-power.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-dGc","jetpack-related-posts":[{"id":58788,"url":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-solar-hybrid-mb2349\/","url_meta":{"origin":52588,"position":0},"title":"Jabiru&#8217;s Solar Hybrid Power Station Is Go","author":"Michael Bloch","date":"February 10, 2022","format":false,"excerpt":"A hybrid renewable power station in the Northern Territory is now providing a cleaner energy future for the town of Jabiru. Situated in the midst of Kakadu National Park and considered the gateway to the World Heritage listed destination, Jabiru (population: ~1,000) was built in the 1980\u2019s to service Energy\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Jabiru Hybrid Renewable Power Station","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/02\/jabiru-hybrid-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/02\/jabiru-hybrid-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/02\/jabiru-hybrid-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/02\/jabiru-hybrid-solar.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/02\/jabiru-hybrid-solar.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":45904,"url":"https:\/\/www.solarquotes.com.au\/blog\/jabiru-renewable-energy-mb1808\/","url_meta":{"origin":52588,"position":1},"title":"Jabiru Readying For Renewable Energy","author":"Michael Bloch","date":"December 22, 2020","format":false,"excerpt":"While there's still much uncertainty about the future of the Northern Territory mining town of Jabiru, it will be one powered by at least 50% renewables. Situated around 250 kilometres east of Darwin and 300 kilometres north of Katherine, Jabiru was constructed in the early 1980's to service Energy Resources\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Renewable energy for Jabiru","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jabiru-renewable-energy.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jabiru-renewable-energy.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jabiru-renewable-energy.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jabiru-renewable-energy.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/jabiru-renewable-energy.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":25293,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-mine-wa-mb0797\/","url_meta":{"origin":52588,"position":2},"title":"Solar Power For Nickel\/Copper Mine In Western Australia","author":"Michael Bloch","date":"October 24, 2018","format":false,"excerpt":"Zenith Energy has announced it has entered into an agreement to build a hybrid solar power facility at Independence Group's Nova Operation mine in Western Australia. Nova Operation is situated in the Fraser Range, approximately 380 kilometres from the port of Esperance. In its first full year of production (FY18),\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar energy for Australian mining operations","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/solar-mine-wa.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/solar-mine-wa.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/solar-mine-wa.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/10\/solar-mine-wa.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":14024,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-storage-daly-river-mb0164\/","url_meta":{"origin":52588,"position":3},"title":"NT&#8217;s Daly River Solar + Storage Project A &#8220;Shining Light&#8221;","author":"Michael Bloch","date":"August 14, 2017","format":false,"excerpt":"The remote aboriginal community of Daly River will be the first in the Northern Territory to reach 50% renewables, thanks to solar and battery storage, and will serve as a model for powering others. Daly River (Nauiyu) is a community of around 650 people situated 230km south of Darwin. Like\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Hybrid diesel, solar and storage","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/daly-river-solar-storage.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/daly-river-solar-storage.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/daly-river-solar-storage.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/daly-river-solar-storage.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":29453,"url":"https:\/\/www.solarquotes.com.au\/blog\/nt-solar-setup-mb1009\/","url_meta":{"origin":52588,"position":4},"title":"NT&#8217;S Solar Energy Transformation Program (SETuP) Complete","author":"Michael Bloch","date":"April 10, 2019","format":false,"excerpt":"Dozens of remote communities throughout the Northern Territory are now benefiting from the integration of commercial and large-scale solar power under SETuP. A $59 million initiative co-funded by the Northern Territory Government and the Australian Renewable Energy Agency (ARENA), the program was delivered by Power and Water Corporation and saw\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar Energy Transformation Program (SETuP)","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/04\/solar-setup-nt.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/04\/solar-setup-nt.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/04\/solar-setup-nt.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/04\/solar-setup-nt.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/04\/solar-setup-nt.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":35224,"url":"https:\/\/www.solarquotes.com.au\/blog\/resolute-hybrid-power-station-mb1305\/","url_meta":{"origin":52588,"position":5},"title":"Hybrid Thermal, Solar And Storage Power Plant For Resolute Mining","author":"Michael Bloch","date":"November 26, 2019","format":false,"excerpt":"Australia's Resolute Mining Limited is partnering with Aggreko on a new hybrid modular power station project at Resolute's Syama Gold Mine in Mali, West Africa that is expected to slash Syama\u2019s electricity costs by approximately 40%. Resolute announced yesterday it had signed a Heads of Terms Agreement for the project\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Hybrid power station - Resolute and Aggreko","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/11\/solar-hybrid-power.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/52588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=52588"}],"version-history":[{"count":3,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/52588\/revisions"}],"predecessor-version":[{"id":52592,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/52588\/revisions\/52592"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/52589"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=52588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=52588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=52588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}