{"id":57761,"date":"2022-01-12T05:26:28","date_gmt":"2022-01-11T18:56:28","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=57761"},"modified":"2022-01-12T05:26:28","modified_gmt":"2022-01-11T18:56:28","slug":"columboola-solar-farm-mb2311","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/","title":{"rendered":"Columboola Solar Farm Progress Update"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-57762\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm.jpg\" alt=\"Columboola Solar Farm - Queensland\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>A major solar farm under construction between Chinchilla and Miles in Queensland&#8217;s Western Downs Region is another step closer to prime time.<!--more--><\/p>\n<p>Columboola Solar Farm is a 162 MW(ac)\/202.5 MW(dc) PV project consisting of 417,000 <a href=\"https:\/\/www.solarquotes.com.au\/blog\/double-glass-glass-glass-bifacial-panels-hell\/\">bifacial solar panels<\/a> and 39 Medium Voltage Power Stations &#8211; the latter supplied by <a href=\"https:\/\/www.solarquotes.com.au\/inverters\/sma-review.html\">inverter manufacturer SMA<\/a><sup class='endnote'><a href='https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/#en-57761-1' id='enref-57761-1' onclick='return hhEndnotes_show(57761)'>1<\/a><\/sup>. The clean power station will generate an estimated 440 GWh of electricity annually; enough to supply the equivalent of 100,000 homes.<\/p>\n<p>Electricity network transmission services provider Powerlink announced on Tuesday it had completed its connection of the facility to Powerlink&#8217;s network, which involved building two kilometres of transmission line and various upgrades at the existing Columboola Substation.<\/p>\n<blockquote><p>\u201cAfter many months of dedicated on-ground work, our project team has been able to bring construction activities to a close \u2013 safely, on-time and on-budget,\u201d <a href=\"https:\/\/www.powerlink.com.au\/news-media\/powerline-energised-link-columboola-solar-farm-grid\">said<\/a> Powerlink Chief Executive Paul Simshauser. \u201cThe project was technically complex and required meticulous planning, with the new stretch of transmission line crossing directly under an existing 275kV line.&#8221;<\/p><\/blockquote>\n<p>Powerlink says its final testing and commissioning activities at Columboola Solar Farm will occur in the months ahead.<\/p>\n<h2>Columboola Solar Energy To Power Queensland Universities<\/h2>\n<p>Once operational, Queensland-government owned CS Energy will snap up all the output of the solar farm under an initial ten-year Power Purchase Agreement (PPA) signed back in 2020; selling it to large customers including Griffith University, CQUniversity and QUT.<\/p>\n<p>The solar farm is owned by Korean investment manager Hana Financial Investment (HFI) and is being constructed by Sterling and Wilson; which is an incredibly British sounding name, but is based in India.<\/p>\n<p>Columboola Solar Farm was originally to deliver first generation to the grid in Q3 last year and ramp up to full commercial operation this quarter; but is as often the case with major solar energy projects &#8211; particularly in the current environment &#8211; that plan turned out to be a little ambitious. It&#8217;s not clear when the photo above was taken, but there was a fair bit of work left to do at that point.<\/p>\n<h2>Western Downs And Solar Energy<\/h2>\n<p>Queensland&#8217;s Western Downs region is a hotspot for utility-scale solar development. Another and much larger project under construction not far from the Columboola site is the <a href=\"https:\/\/www.solarquotes.com.au\/blog\/western-downs-solar-mb2213\/\">Western Downs Green Power Hub<\/a>, a Neoen project boasting 460MW (ac)\/400MW (dc) solar power and 200MW\/400MWh Tesla-based battery storage capacity.<\/p>\n<p>As with Columboola, CS Energy has dibs on output from this project\u00a0 &#8211; 320MW (ac) capacity.<\/p>\n<p>In terms of currently operational utility-scale solar farms in the Western Downs region, it&#8217;s home to the 110MW (ac) Darling Downs, 120MW (ac) Gangarri\u00a0 and 19.9MW (ac) Baking Board solar farms.<\/p>\n<p>Beyond utility-scale PV, the local government area also hosts a bunch of smaller large-scale and small-scale systems, with the total capacity (all types) installed to the end of September last year estimated by the Australian Photovoltaic Institute at 333.6 MW (assumed DC) capacity. With the addition of Columboola, the Green Power Hub and whatever else has been installed since September, Western Downs LGA could breeze past the 1GW DC mark quite soon.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A major solar farm under construction between Chinchilla and Miles in Queensland&#8217;s Western Downs Region is another step closer to prime time.<\/p>\n","protected":false},"author":17,"featured_media":57762,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-57761","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.5 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Columboola Solar Farm Progress Update - SolarQuotes Blog<\/title>\n<meta name=\"description\" content=\"A major solar farm under construction between Chinchilla and Miles in Queensland&#039;s Western Downs Region is another step closer to prime time.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Columboola Solar Farm Progress Update\" \/>\n<meta property=\"og:description\" content=\"A major solar farm under construction between Chinchilla and Miles in Queensland&#039;s Western Downs Region is another step closer to prime time.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-01-11T18:56:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Columboola Solar Farm Progress Update\",\"datePublished\":\"2022-01-11T18:56:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/\"},\"wordCount\":532,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/columboola-solar-farm.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/\",\"name\":\"Columboola Solar Farm Progress Update - SolarQuotes Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/columboola-solar-farm.jpg\",\"datePublished\":\"2022-01-11T18:56:28+00:00\",\"description\":\"A major solar farm under construction between Chinchilla and Miles in Queensland's Western Downs Region is another step closer to prime time.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/columboola-solar-farm.jpg\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/columboola-solar-farm.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Columboola Solar Farm - Queensland\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/columboola-solar-farm-mb2311\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/solar-battery-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Columboola Solar Farm Progress Update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/michael\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Columboola Solar Farm Progress Update - SolarQuotes Blog","description":"A major solar farm under construction between Chinchilla and Miles in Queensland's Western Downs Region is another step closer to prime time.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/","og_locale":"en_US","og_type":"article","og_title":"Columboola Solar Farm Progress Update","og_description":"A major solar farm under construction between Chinchilla and Miles in Queensland's Western Downs Region is another step closer to prime time.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2022-01-11T18:56:28+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Columboola Solar Farm Progress Update","datePublished":"2022-01-11T18:56:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/"},"wordCount":532,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/","url":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/","name":"Columboola Solar Farm Progress Update - SolarQuotes Blog","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm.jpg","datePublished":"2022-01-11T18:56:28+00:00","description":"A major solar farm under construction between Chinchilla and Miles in Queensland's Western Downs Region is another step closer to prime time.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm.jpg","width":1200,"height":630,"caption":"Columboola Solar Farm - Queensland"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2311\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Columboola Solar Farm Progress Update"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/01\/columboola-solar-farm.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-f1D","jetpack-related-posts":[{"id":69647,"url":"https:\/\/www.solarquotes.com.au\/blog\/columboola-solar-farm-mb2781\/","url_meta":{"origin":57761,"position":0},"title":"Columboola Solar Farm (Finally) Achieves Full Output","author":"Michael Bloch","date":"January 5, 2023","format":false,"excerpt":"Renewable energy developer RES recently announced Columboola Solar Farm in Queensland has reached full generation output. Situated approximately 10 kilometres north-east of Miles in Queensland's Western Downs region, Columboola Solar Farm is a 162 MW(ac)\/202.5 MW(dc) clean power station comprised of 417,000 bifacial solar panels that make use of light\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Columboola Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/columboola-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/columboola-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/columboola-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/columboola-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/columboola-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":46071,"url":"https:\/\/www.solarquotes.com.au\/blog\/sma-australia-2020-mb1816\/","url_meta":{"origin":57761,"position":1},"title":"A Big Year For SMA&#8217;s Big Inverters In Australia","author":"Michael Bloch","date":"December 28, 2020","format":false,"excerpt":"2020 saw Germany's SMA sign contracts for around 1.6 gigawatts of central inverter capacity for use in large-scale solar installations across Australia. SMA claims to have captured market share of approximately 65 percent of the total 6.5 gigawatts of central inverter capacity committed locally by the end of 2020. \"Despite\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"SMA central inverters - Australia","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/sma-inverters-australia.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/sma-inverters-australia.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/sma-inverters-australia.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/sma-inverters-australia.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/sma-inverters-australia.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":45389,"url":"https:\/\/www.solarquotes.com.au\/blog\/sma-sustainable-business-mb1787\/","url_meta":{"origin":57761,"position":2},"title":"SMA Kicking Sustainability And Solar Business Goals","author":"Michael Bloch","date":"December 4, 2020","format":false,"excerpt":"While it's been a tough year for German solar inverter manufacturer SMA - as it has been for many other companies - it's also been a rewarding one. In addition to growth in shipments and sales, the company was recently recognised as being one of the most sustainable companies in\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Germany's SMA","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/sma-sustainable-business.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/sma-sustainable-business.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/sma-sustainable-business.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/sma-sustainable-business.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/12\/sma-sustainable-business.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":73525,"url":"https:\/\/www.solarquotes.com.au\/blog\/griffith-logan-solar-panels-mb2897\/","url_meta":{"origin":57761,"position":3},"title":"Griffith University Racking Up More Solar Panels","author":"Michael Bloch","date":"April 13, 2023","format":false,"excerpt":"Griffith University is continuing on its sustainability journey with the installation of solar panels on the rooftops of five Logan campus buildings - and there will be more to come. This significant step is part of the university's broader commitment to achieving 100% renewable power by 2029, in line with\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Griffith University Logan campus solar panels","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/04\/logan-solar-panels.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/04\/logan-solar-panels.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/04\/logan-solar-panels.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/04\/logan-solar-panels.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/04\/logan-solar-panels.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":26122,"url":"https:\/\/www.solarquotes.com.au\/blog\/sma-solar-australia-mb0839\/","url_meta":{"origin":57761,"position":4},"title":"Utility Scale Solar A Bright Spot For SMA In Australia","author":"Michael Bloch","date":"November 27, 2018","format":false,"excerpt":"SMA Solar Technology AG says the company will have commissioned 1.8GW of solar inverter capacity\u00a0associated with utility scale projects in Australia this year.\u00a0 It's been a huge year at this end of the solar sector for the company in Australia, as 2018 will bring SMA\u2019s total utility-scale PV power plant\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"SMA inverters - solar power in Australia","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/sma-australia-solar.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/sma-australia-solar.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/sma-australia-solar.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/11\/sma-australia-solar.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":44510,"url":"https:\/\/www.solarquotes.com.au\/blog\/glenellen-solar-farm-mb1748\/","url_meta":{"origin":57761,"position":5},"title":"Agrivoltaics At Glenellen Solar Farm","author":"Michael Bloch","date":"November 4, 2020","format":false,"excerpt":"The exhibition period for a proposed major solar farm in New South Wales that will incorporate \"agri-solar\" principles has commenced. Glenellen Solar Farm is a proposed 200MW(ac) project located 16km north of Albury in southern NSW, between the towns of Glenellen and Jindera in the Greater Hume local government area.\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Glenellen Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/11\/glenellen-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/11\/glenellen-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/11\/glenellen-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/11\/glenellen-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2020\/11\/glenellen-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/57761","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=57761"}],"version-history":[{"count":2,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/57761\/revisions"}],"predecessor-version":[{"id":57764,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/57761\/revisions\/57764"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/57762"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=57761"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=57761"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=57761"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}