{"id":67378,"date":"2022-11-08T05:19:50","date_gmt":"2022-11-07T18:49:50","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=67378"},"modified":"2023-02-02T17:02:21","modified_gmt":"2023-02-02T06:32:21","slug":"callide-plant-investigation-mb2705","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/","title":{"rendered":"Callide Coal Plant Crap Out Investigators Appointed"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-67379\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg\" alt=\"Callide Power Station\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Independent investigators have been appointed to delve into the recent Callide Power Station faceplant.<!--more--><\/p>\n<p>The 1.525 GW facility, situated near Biloela in Central Queensland, is made up of two black coal burning power plants. Callide B and C each have two generating units &#8211; B1 and B2, C3 and C4. Callide B has been operating since 1988 and Callide C since 2001. Queensland Government-owned CS Energy owns 100 per cent of Callide B and owns Callide C in a 50\/50 joint venture with InterGen.<\/p>\n<p>In May last year, Unit C4 &#8211; an appropriate name as it turns out &#8211; <a href=\"https:\/\/www.solarquotes.com.au\/blog\/callide-power-station-mb2011\/\">went bang in a big way<\/a>.\u00a0 A 300kg chunk of shrapnel resulting from the explosion was removed from the power station&#8217;s roof.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-67381\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-c4.jpg\" alt=\"Callide Unit C4 explosion\" width=\"900\" height=\"515\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-c4.jpg 900w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-c4-300x172.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-c4-768x439.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/p>\n<p>C4&#8217;s dummy spit had immediate and major knock-on effects; also taking the other Callide units offline, and tripping other generation and transmission infrastructure &#8211; resulting in widespread blackouts.<\/p>\n<p>After various delays, Unit B1 returned to service on June 16 2021, and B2 on June 22 last year. It wasn&#8217;t until July 2021 <a href=\"https:\/\/www.solarquotes.com.au\/blog\/callide-power-station-mb2092\/\">Unit C3 was finally returned to service<\/a>. As for Unit C4, originally it was envisioned\u00a0 it would be back up and running by May this year. The latest update indicates C4 won&#8217;t return to service until April 2023.<\/p>\n<p><strong>Update:<\/strong> In an announcement on December 22, 2022, CS Energy said Callide is now not expected to be back online until May 2023.<\/p>\n<h2>&lt;Favoured Deity Name&gt; Hates Callide<\/h2>\n<p>There have been other various burps and farts from Callide since. But on October 31 this year they became louder and wetter; quite literally on the latter. A structural failure of part of the Unit C3 cooling plant occurred, taking it offline. CS Energy <a href=\"https:\/\/www.csenergy.com.au\/news\/statement-on-callide-unit-c3\"> said on November 1<\/a>:<\/p>\n<blockquote><p>&#8220;Units B1 and B2 were unaffected by the incident and are continuing to generate electricity. &#8220;<\/p><\/blockquote>\n<p>At that stage, C3&#8217;s return to service was expected on 21 November 2022.<\/p>\n<p>But later on November 1, Unit B2 came offline after cabling in the unit\u2019s bottom ash conveying system was damaged during scheduled testing.<\/p>\n<p>On November 4, Unit B1 went offline due to a feed pump vibration. It returned to service that day, but at a low load.<\/p>\n<p>Unit B1 was still online as at yesterday and Unit B2 is forecast to return to service on 9 November. Unit C3\u2019s forecast return to service date at this point is 3 January 2023, and that will initially be at reduced capacity.\u00a0 CS Energy notes the dates are based on information available as at yesterday and may be subject to further change.<\/p>\n<p><strong>Update:<\/strong> In an announcement on January 24, 2023, CS Energy said C3 is now not expected to be back online until 30 June 2023 (300MW capacity) and then 30 September 2023 at full capacity (425MW).<\/p>\n<p>Regarding the C3 investigation, CS Energy said yesterday it has appointed two external engineering experts to investigate the root cause of the incident.<\/p>\n<blockquote><p>\u201cThese external engineers are leaders in their field and will help us understand what went wrong on the Unit C3 cooling tower and what needs to be done so that this does not happen again,\u201d <a href=\"https:\/\/www.csenergy.com.au\/news\/cs-energy-appoints-external-engineering-experts-to-investigate-unit-c3-cooling-tower\">stated CS Energy CEO Andrew Bills<\/a>.<\/p><\/blockquote>\n<p>It&#8217;s almost as though this emissions spewing clunker is screaming to be put out of its misery for good.<\/p>\n<h2>Callide &#8220;Old Fashioned&#8221;<\/h2>\n<p>On Sunday, Queensland Energy Minister Mick de Brenni indicated there was no imminent risk of blackouts. He reportedly referred to Callide as \u201cold fashioned\u201d and stated \u201cyou wouldn\u2019t build infrastructure like this going forward\u201d.<\/p>\n<blockquote>\n<p class=\"dcr-2v2zi4\">\u201cThat\u2019s why we\u2019re investing in new renewables, wind and solar,\u201d <a href=\"https:\/\/www.theguardian.com\/australia-news\/2022\/nov\/06\/no-risk-of-blackouts-despite-breakdown-of-old-fashioned-power-station-queensland-minister-says\">he reportedly said<\/a>. \u201cThe energy system of the future is not about old-fashioned, hard-to-maintain equipment, it\u2019s about new technology.\u201d<\/p>\n<\/blockquote>\n<p class=\"dcr-2v2zi4\">In late September, Queensland Premier Annastacia Palaszczuk announced the $62 billion <a href=\"https:\/\/www.solarquotes.com.au\/blog\/queensland-energy-jobs-mb2655\/\"> Queensland Energy and Jobs Plan<\/a>. The Premier said the plan would bring cheaper, cleaner and secure energy for Queenslanders. Among the elements of initiative is 11.5GW of <a href=\"https:\/\/www.solarquotes.com.au\/australia\/solar-power-qld\/\"> rooftop solar power<\/a> and 6GW of embedded batteries.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Independent investigators have been appointed to delve into the recent Callide Power Station faceplant.<\/p>\n","protected":false},"author":17,"featured_media":67379,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-67378","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Callide Coal Plant Crap Out Investigators Appointed<\/title>\n<meta name=\"description\" content=\"Independent investigators have been appointed to delve into the recent Callide Power Station faceplant.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Callide Coal Plant Crap Out Investigators Appointed\" \/>\n<meta property=\"og:description\" content=\"Independent investigators have been appointed to delve into the recent Callide Power Station faceplant.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-11-07T18:49:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-02T06:32:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Callide Coal Plant Crap Out Investigators Appointed\",\"datePublished\":\"2022-11-07T18:49:50+00:00\",\"dateModified\":\"2023-02-02T06:32:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/\"},\"wordCount\":646,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/\",\"name\":\"Callide Coal Plant Crap Out Investigators Appointed\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg\",\"datePublished\":\"2022-11-07T18:49:50+00:00\",\"dateModified\":\"2023-02-02T06:32:21+00:00\",\"description\":\"Independent investigators have been appointed to delve into the recent Callide Power Station faceplant.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Callide Power Station\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Callide Coal Plant Crap Out Investigators Appointed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Callide Coal Plant Crap Out Investigators Appointed","description":"Independent investigators have been appointed to delve into the recent Callide Power Station faceplant.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/","og_locale":"en_US","og_type":"article","og_title":"Callide Coal Plant Crap Out Investigators Appointed","og_description":"Independent investigators have been appointed to delve into the recent Callide Power Station faceplant.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2022-11-07T18:49:50+00:00","article_modified_time":"2023-02-02T06:32:21+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Callide Coal Plant Crap Out Investigators Appointed","datePublished":"2022-11-07T18:49:50+00:00","dateModified":"2023-02-02T06:32:21+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/"},"wordCount":646,"commentCount":0,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/","url":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/","name":"Callide Coal Plant Crap Out Investigators Appointed","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg","datePublished":"2022-11-07T18:49:50+00:00","dateModified":"2023-02-02T06:32:21+00:00","description":"Independent investigators have been appointed to delve into the recent Callide Power Station faceplant.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg","width":1200,"height":630,"caption":"Callide Power Station"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/callide-plant-investigation-mb2705\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Callide Coal Plant Crap Out Investigators Appointed"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/callide-power-station.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-hwK","jetpack-related-posts":[{"id":72784,"url":"https:\/\/www.solarquotes.com.au\/blog\/callide-coal-curse-mb2874\/","url_meta":{"origin":67378,"position":0},"title":"QLD Coal Power: The Callide Curse Continues","author":"Michael Bloch","date":"March 27, 2023","format":false,"excerpt":"Queensland-government owned CS Energy's joint venture partner in the troubled coal-fired Callide C power plant has run into some troubles of its own. First, a little background to the mess. Callide Power Station is coal burner in Biloela, Central Queensland. It's comprised of two power plants (B and C), and\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Callide Power Station","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/callide-power-station.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/callide-power-station.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/callide-power-station.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/callide-power-station.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/callide-power-station.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":52377,"url":"https:\/\/www.solarquotes.com.au\/blog\/callide-power-station-mb2092\/","url_meta":{"origin":67378,"position":1},"title":"Another Callide Power Station Unit Back To Polluting\u00a0","author":"Michael Bloch","date":"July 27, 2021","format":false,"excerpt":"A third generating unit of Queensland's black coal-burning Callide Power Station returned to service yesterday. Located near Biloela in Central Queensland, Callide Power Station is comprised of Callide B and C; each with two generating units. Combined, their capacity is around 1.5GW. Callide B commenced operations in 1988 and C\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Callide Power Station - Queensland","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/callide-power-station.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/callide-power-station.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/callide-power-station.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/callide-power-station.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/07\/callide-power-station.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":34009,"url":"https:\/\/www.solarquotes.com.au\/blog\/queensland-solar-statistics-mb1241\/","url_meta":{"origin":67378,"position":2},"title":"Queensland Spruiks State Solar Success Statistics","author":"Michael Bloch","date":"October 7, 2019","format":false,"excerpt":"The QLD Government is celebrating the success of solar energy in the state - and it's also been revealed a Queensland coal-fired power station is expected to close early. According to a release published yesterday, solar panels installed throughout the state can now produce twice as much electricity as Queensland's\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Queensland solar energy statistics","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/solar-power-queensland.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/solar-power-queensland.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/solar-power-queensland.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/solar-power-queensland.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/10\/solar-power-queensland.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":50642,"url":"https:\/\/www.solarquotes.com.au\/blog\/callide-power-station-mb2011\/","url_meta":{"origin":67378,"position":3},"title":"How Good Is Coal? Callide Power Station Fire","author":"Michael Bloch","date":"May 26, 2021","format":false,"excerpt":"Coal power in Australia copped yet another blow yesterday, with a fire\/explosion occurring at Callide Power Station in Queensland. Callide Power Station is located near Biloela in Central Queensland and is comprised of two black coal fired power plants, Callide B and C; each with two generating units. Callide B\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Callide Power Station fire","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/callide-power-station.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/callide-power-station.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/callide-power-station.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/callide-power-station.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/05\/callide-power-station.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":59468,"url":"https:\/\/www.solarquotes.com.au\/blog\/regional-queensland-electricity-mb2377\/","url_meta":{"origin":67378,"position":4},"title":"Regional Queensland Braces For Power Price Hike","author":"Michael Bloch","date":"March 2, 2022","format":false,"excerpt":"A draft determination from the Queensland Competition Authority indicates regional Queenslanders will be paying more for electricity in 2022\/23 - and big business will be hit particularly hard. The QCA released its draft determination on regulated retail electricity prices for regional Queensland to apply in 2022\u201323 on Friday. While not\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Electricity prices in regional Queensland","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/03\/electricity-prices-regional-qld.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/03\/electricity-prices-regional-qld.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/03\/electricity-prices-regional-qld.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/03\/electricity-prices-regional-qld.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/03\/electricity-prices-regional-qld.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":84714,"url":"https:\/\/www.solarquotes.com.au\/blog\/townsville-lrez-mb2950\/","url_meta":{"origin":67378,"position":5},"title":"Townsville Declared A QLD Local Renewable Energy Zone","author":"Michael Bloch","date":"June 26, 2024","format":false,"excerpt":"Queensland's Miles Government wants to boost rooftop solar power and energy storage capacity in Townsville, and have non-solar households sharing the benefits of locally generated clean electricity. In Townsville, solar panels are already a common sight on the rooftops of homes and businesses. The Miles Government wants the community to\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Townsville LREZ","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/06\/lrez-townsville.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/06\/lrez-townsville.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/06\/lrez-townsville.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/06\/lrez-townsville.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/06\/lrez-townsville.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/67378","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=67378"}],"version-history":[{"count":5,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/67378\/revisions"}],"predecessor-version":[{"id":70676,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/67378\/revisions\/70676"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/67379"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=67378"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=67378"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=67378"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}