{"id":69738,"date":"2023-01-09T05:15:37","date_gmt":"2023-01-08T18:45:37","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=69738"},"modified":"2023-01-09T05:15:37","modified_gmt":"2023-01-08T18:45:37","slug":"blyth-big-battery-mb2783","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/","title":{"rendered":"Blyth Big Battery Given Go-Ahead"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-69739\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png\" alt=\"Blyth Battery - South Australia\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery-300x158.png 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery-1024x538.png 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery-768x403.png 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Neoen announced late last week it&#8217;s all systems go for another of its big battery projects, this one in South Australia.<!--more--><\/p>\n<p>On Friday, the company said it had issued notices to proceed to contractors Elecnor and NHOA for the 200 MW \/ 400 MWh\u00a0 Blyth Battery, which is to be situated 7.5 km west of the small town of <a href=\"https:\/\/www.solarquotes.com.au\/location\/blyth-5462-sa\/\">Blyth<\/a> in South Australia\u2019s Mid-North region.<\/p>\n<p>The primary function of the Blyth battery energy storage system (BESS) will be to &#8220;firm&#8221; 70MW of wind power generated by Goyder South Stage 1 under a contract with BHP, for its Olympic Dam mining operation in SA.<\/p>\n<p>Firming refers to maintaining the output from a variable, intermittent renewables source such as such as wind or solar power for a committed period of time. <a href=\"https:\/\/www.solarquotes.com.au\/blog\/goyder-south-renewables-neoen-mb1651\/\">Goyder South<\/a> is a huge renewables project that will also pack a mighty solar power wallop when it is complete.<\/p>\n<p>The Blyth BESS will connect to ElectraNet\u2019s existing 275 kV network and be located directly adjacent to the existing ElectraNet Blyth West Substation.<\/p>\n<blockquote><p>&#8220;The advantage of the close proximity to the substation is that electrical connection infrastructure is minimised, which increases the performance and minimises cost,&#8221; says Neoen.<\/p><\/blockquote>\n<p>Blyth will also ultimately incorporate grid-forming inverter tech; enabling it to offer system stability services that have previously only been provided by synchronous generation such as coal and gas.<\/p>\n<p>While most grid-scale batteries use &#8220;grid-following inverters&#8221;, which are susceptible to instability in a weak grid, the use of grid forming inverters strengthens a grid by increasing the stability of the voltage waveform.\u00a0 Integrating grid-forming inverter technology at Blyth is being made possible with funding under the Australian Renewable Energy Agency&#8217;s (ARENA\u2019s) <a href=\"https:\/\/arena.gov.au\/blog\/arena-backs-eight-big-batteries-to-bolster-grid\/\">Large Scale Battery Storage Funding Round<\/a>.<\/p>\n<blockquote><p>\u201cWe are delighted to be building our second storage asset in South Australia, the state where we delivered the world\u2019s first big battery back in 2017,&#8221; said Neoen Chairman and CEO Xavier Barbaro; referring to Hornsdale Power Reserve (aka the Tesla Big Battery). &#8220;Blyth Battery will play an essential role in providing 24\/7 energy, serving as a template for future baseload contracts for our customers, both in Australia and in our other countries.&#8221;<\/p><\/blockquote>\n<p>Neoen is to also establish a community benefit-sharing scheme for the lifetime of the <a href=\"https:\/\/blythbattery.com.au\/\">Blyth Battery<\/a>, which is expected to start operations in 2025.<\/p>\n<h2>Neoen&#8217;s 5th Big Battery In Australia<\/h2>\n<p>This will be France-headquartered Neoen&#8217;s fifth large-scale BESS project either operating or under construction in Australia. Others include:<\/p>\n<ul>\n<li>Victorian Big Battery near Geelong VIC: 300 MW \/ 450 MWh capacity<\/li>\n<li>Hornsdale Power Reserve near Jamestown SA: 150 MW \/ 193.5 MWh capacity (originally 100MW \/ 129 MWh)<\/li>\n<li>Capital Battery near Fyshwick in the ACT: 100 MW \/ 200 MWh; currently under construction.<\/li>\n<\/ul>\n<p>The construction go-ahead for the fourth project &#8211; the 200 MW \/ 400 MWh <a href=\"https:\/\/www.solarquotes.com.au\/blog\/queensland-big-battery-mb2775\/\"> Western Downs Battery<\/a> in Queensland &#8211; was announced in late December 2022. That is to be located within Neoen\u2019s Western Downs Green Power Hub, adjacent to the company&#8217;s 460 MW solar farm. The Western Downs BESS is expected to be operational in 2024\/25.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Neoen announced late last week it&#8217;s all systems go for another of its big battery projects, this one in South Australia.<\/p>\n","protected":false},"author":17,"featured_media":69739,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-69738","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Blyth Big Battery Given Go-Ahead<\/title>\n<meta name=\"description\" content=\"Neoen announced late last week it&#039;s all systems go for another of its big battery projects, this one in South Australia.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Blyth Big Battery Given Go-Ahead\" \/>\n<meta property=\"og:description\" content=\"Neoen announced late last week it&#039;s all systems go for another of its big battery projects, this one in South Australia.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-08T18:45:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Blyth Big Battery Given Go-Ahead\",\"datePublished\":\"2023-01-08T18:45:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/\"},\"wordCount\":495,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/\",\"name\":\"Blyth Big Battery Given Go-Ahead\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png\",\"datePublished\":\"2023-01-08T18:45:37+00:00\",\"description\":\"Neoen announced late last week it's all systems go for another of its big battery projects, this one in South Australia.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png\",\"width\":1200,\"height\":630,\"caption\":\"Blyth Battery - South Australia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Blyth Big Battery Given Go-Ahead\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Blyth Big Battery Given Go-Ahead","description":"Neoen announced late last week it's all systems go for another of its big battery projects, this one in South Australia.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/","og_locale":"en_US","og_type":"article","og_title":"Blyth Big Battery Given Go-Ahead","og_description":"Neoen announced late last week it's all systems go for another of its big battery projects, this one in South Australia.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2023-01-08T18:45:37+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png","type":"image\/png"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Blyth Big Battery Given Go-Ahead","datePublished":"2023-01-08T18:45:37+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/"},"wordCount":495,"commentCount":1,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/","url":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/","name":"Blyth Big Battery Given Go-Ahead","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png","datePublished":"2023-01-08T18:45:37+00:00","description":"Neoen announced late last week it's all systems go for another of its big battery projects, this one in South Australia.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png","width":1200,"height":630,"caption":"Blyth Battery - South Australia"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Blyth Big Battery Given Go-Ahead"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-i8O","jetpack-related-posts":[{"id":57047,"url":"https:\/\/www.solarquotes.com.au\/blog\/solar-powered-battery-fpl-mb2276\/","url_meta":{"origin":69738,"position":0},"title":"Wraps Off The &#8220;World&#8217;s Largest&#8221; Solar Powered Battery","author":"Michael Bloch","date":"December 16, 2021","format":false,"excerpt":"Florida Power and Light Company (FPL) has unveiled what it says is the world\u2019s largest operational solar-powered battery installation in an event with lasers and drones - as you do when officially launching a completed energy storage project. The newly commissioned FPL Manatee Energy Storage Center is a 409MW\/900MWh facility\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"FPL solar powered battery facility","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/12\/solar-battery-fpl.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/12\/solar-battery-fpl.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/12\/solar-battery-fpl.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/12\/solar-battery-fpl.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/12\/solar-battery-fpl.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":68987,"url":"https:\/\/www.solarquotes.com.au\/blog\/community-big-batteries-mb2757\/","url_meta":{"origin":69738,"position":1},"title":"Bowen&#8217;s Community And Big Battery Blitz: More Details","author":"Michael Bloch","date":"December 19, 2022","format":false,"excerpt":"Buzz about batteries was again stirred up over the weekend by Federal Minister for Climate Change and Energy Chris Bowen. Here's what's happening. Community Battery Rollout - Next Steps One of the Albanese Government's election commitments was a $200 million investment over four years to deliver large batteries to around\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Community and big batteries - Chris Bowen","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/community-big-batteries-bowen.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/community-big-batteries-bowen.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/community-big-batteries-bowen.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/community-big-batteries-bowen.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/community-big-batteries-bowen.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":33405,"url":"https:\/\/www.solarquotes.com.au\/blog\/goyder-south-solar-mb1209\/","url_meta":{"origin":69738,"position":2},"title":"Another Huge Renewable Energy Park Proposed For South Australia","author":"Michael Bloch","date":"September 11, 2019","format":false,"excerpt":"Further details of a proposed $1 billion wind, solar and battery storage project for South Australia\u2019s Mid-North will be revealed today. The Adelaide Advertiser reports (paywall) French company Neoen will announce \"Goyder South\", which is to be constructed in the Burra region. The Advertiser states the total project involves 1200MW\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Goyder South - wind, solar and battery storage","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/wind-solar-burra.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/wind-solar-burra.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/wind-solar-burra.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/wind-solar-burra.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/09\/wind-solar-burra.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":16656,"url":"https:\/\/www.solarquotes.com.au\/blog\/cefc-lincoln-gap-battery-mb0299\/","url_meta":{"origin":69738,"position":3},"title":"CEFC Finances Large-Scale Battery System","author":"Michael Bloch","date":"November 13, 2017","format":false,"excerpt":"Australia's Clean Energy Finance Corporation announced this morning it will be supporting Australia's first unsubsidised large-scale grid-connected battery. The CEFC will be providing $150 million in debt finance to stage one of the Lincoln Gap wind farm in South Australia's Port Augusta region, which includes a 10MW\/10MWh battery energy storage\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Lincoln Gap - wind farm and battery storage","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/lincoln-gap-battery-storage.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/lincoln-gap-battery-storage.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/lincoln-gap-battery-storage.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/11\/lincoln-gap-battery-storage.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":61299,"url":"https:\/\/www.solarquotes.com.au\/blog\/hillston-solar-farm-mb2450\/","url_meta":{"origin":69738,"position":4},"title":"Hillston Solar Farm Hits 100% Generation Ahead Of Schedule","author":"Michael Bloch","date":"April 27, 2022","format":false,"excerpt":"Amp Power Australia's 120MW Hillston Solar Farm in south- west New South Wales is now cranking at full capacity. The local operating company of Toronto-headquartered Amp Energy said it had reached full generation in under three months from initial energisation. \"Reaching full output ahead of schedule is a testament to\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Hillston Solar Farm","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/hillston-solar-farm.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/hillston-solar-farm.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/hillston-solar-farm.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/hillston-solar-farm.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/04\/hillston-solar-farm.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":27209,"url":"https:\/\/www.solarquotes.com.au\/blog\/sa-grid-battery-mb0901\/","url_meta":{"origin":69738,"position":5},"title":"30 MW\/8 MWh Grid Scale Battery In SA Fully Operational","author":"Michael Bloch","date":"January 17, 2019","format":false,"excerpt":"The Australian Renewable Energy Agency (ARENA) says a 30 MW\/8 MWh grid-scale battery project at the Dalrymple substation on South Australia\u2019s Yorke Peninsula is now live and connected to the National Electricity Market (NEM). The Dalyrmple substation is located seven kilometres south-west of Stansbury, a small town located on the\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"ESCRI grid scale battery","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/escri-battery.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/escri-battery.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/escri-battery.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/escri-battery.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/69738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=69738"}],"version-history":[{"count":1,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/69738\/revisions"}],"predecessor-version":[{"id":69740,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/69738\/revisions\/69740"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/69739"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=69738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=69738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=69738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}