{"id":70215,"date":"2023-01-23T07:15:23","date_gmt":"2023-01-22T20:45:23","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=70215"},"modified":"2023-01-23T07:15:23","modified_gmt":"2023-01-22T20:45:23","slug":"usa-nuclear-smr-mb2799","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/","title":{"rendered":"Final Green Light For Nuclear SMR Design From US Feds"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-70216\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg\" alt=\"NuScale SMR (small modular reactor) power plant\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>It&#8217;s official &#8211; the U.S. Nuclear Regulatory Commission has published its final rule giving the thumbs-up to NuScale Power\u2019s small modular reactor, the first SMR design certified by the NRC.<!--more--><\/p>\n<p>As the term suggests, a small modular reactor is smaller in size than conventional nuclear reactors. Some of the claimed benefits of SMR-based plants compared to their larger counterparts include lower capital costs, modular design, increased safety and lower emissions.<\/p>\n<p>The approved NuScale Power design is for an advanced light-water SMR rated at 50MW capacity, but NuScale is also in the process of seeking approval to boost this to 77MW. A NuScale VOYGR SMR power plant can house up to 12 factory-built power modules &#8211; so, up to 600MW as things currently stand or 924MW should the upgraded power module design pass muster.<\/p>\n<blockquote><p>\u201cSMRs are no longer an abstract concept,\u201d <a href=\"https:\/\/www.energy.gov\/ne\/articles\/nrc-certifies-first-us-small-modular-reactor-design\"> said<\/a> Assistant Secretary for Nuclear Energy Dr. Kathryn Huff. \u201cThey are real and they are ready for deployment thanks to the hard work of NuScale, the university community, our national labs, industry partners, and the NRC.\u201d<\/p><\/blockquote>\n<h2>SMR = Pricey Power<\/h2>\n<p>On the deployment side of things, the USA&#8217;s Department of Energy is currently working with Utah Associated Municipal Power Systems (UAMPS) on a project to demonstrate a six-module <a href=\"https:\/\/www.nuscalepower.com\/en\/products\/voygr-smr-plants\"> NuScale VOYGR<\/a> plant at Idaho National Laboratory.<\/p>\n<p>But as this project has progressed, the price of electricity from the yet-to-be-built plant keeps increasing &#8211; which is no surprise where nuclear power is involved.<\/p>\n<p>The original target price was USD $55 per megawatt-hour (MWh). That crept up to $58\/ MWh in 2021. Back in November last year, we mentioned David Schlissel from the Institute for Energy Economics &amp; Financial Analysis (IEEFA) predicted prices from the project <a href=\"https:\/\/www.solarquotes.com.au\/blog\/smr-expensive-electricity-mb2723\/\">were likely to end up<\/a> in the range of $90-$100 per MWh. And that\u2019s after a $1.4 billion subsidy from the DoE and an Inflation Reduction Act (IRA) subsidy of $30 per MWh.<\/p>\n<p>A new and much more detailed cost estimate from NuScale and UAMPS released this month pegs the target price for energy from the proposed SMR project at $89\/MWh according to Mr. Schlissel. This is due to a 75% increase in the estimated construction cost for the project, which has jumped from $5.3 to $9.3 billion dollars.<\/p>\n<p>The $89\/MWh is in 2022 bucks and Mr. Schlissel says assuming a 2% inflation rate through to 2030, cost of electricity from the plant would be $102\/ MWh.<\/p>\n<blockquote><p>&#8220;The new estimate makes the NuScale SMR about as expensive on a dollars-per-kilowatt basis ($20,139\/kW) as the two-reactor Vogtle nuclear project currently being built in Georgia, undercutting the claim that SMRs will be cheap to build,&#8221; <a href=\"https:\/\/ieefa.org\/resources\/eye-popping-new-cost-estimates-released-nuscale-small-modular-reactor\">says Mr. Schlissel<\/a>.<\/p><\/blockquote>\n<p>While the cost of anything first-of-its-kind tends to be high initially, conventional nuclear power projects are notorious for cost blowouts and it would seem SMR plants will follow suit. And Mr. Schlissel warns there&#8217;s likely to be more increases as the project continues to evolve.<\/p>\n<blockquote><p>&#8220;.. no one should fool themselves into believing this will be the last cost increase for the NuScale\/UAMPS SMR.&#8221;<\/p><\/blockquote>\n<p>Cost is the major reason <a href=\"https:\/\/www.solarquotes.com.au\/blog\/submarines-nuclear-not-power-stations\/\">Australian power stations will never go nuclear<\/a> &#8211; SMR or otherwise &#8211; even if Australia&#8217;s ban on nuclear energy was lifted. Renewables are already and will continue to be the <a href=\"https:\/\/www.solarquotes.com.au\/blog\/gencost22-renewables-csiro-mb2548\/\"> cheapest new-build electricity generation<\/a> option in Australia, even when including storage and transmission costs.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>It&#8217;s official &#8211; the U.S. Nuclear Regulatory Commission has published its final rule giving the thumbs-up to NuScale Power\u2019s small modular reactor, the first SMR design certified by the NRC.<\/p>\n","protected":false},"author":17,"featured_media":70216,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-70215","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Final Green Light For Nuclear SMR Design From US Feds<\/title>\n<meta name=\"description\" content=\"The U.S. Nuclear Regulatory Commission has published its final rule giving the thumbs-up to NuScale Power\u2019s small modular reactor (SMR).\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Final Green Light For Nuclear SMR Design From US Feds\" \/>\n<meta property=\"og:description\" content=\"The U.S. Nuclear Regulatory Commission has published its final rule giving the thumbs-up to NuScale Power\u2019s small modular reactor (SMR).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-22T20:45:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Final Green Light For Nuclear SMR Design From US Feds\",\"datePublished\":\"2023-01-22T20:45:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/\"},\"wordCount\":555,\"commentCount\":5,\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/\",\"name\":\"Final Green Light For Nuclear SMR Design From US Feds\",\"isPartOf\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg\",\"datePublished\":\"2023-01-22T20:45:23+00:00\",\"description\":\"The U.S. Nuclear Regulatory Commission has published its final rule giving the thumbs-up to NuScale Power\u2019s small modular reactor (SMR).\",\"breadcrumb\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#primaryimage\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg\",\"width\":1200,\"height\":630,\"caption\":\"NuScale SMR (small modular reactor) power plant\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Final Green Light For Nuclear SMR Design From US Feds\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#website\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"contentUrl\":\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SolarQuotes\/\",\"https:\/\/x.com\/solar_quotes\",\"https:\/\/www.instagram.com\/solarquotes\/\",\"https:\/\/au.linkedin.com\/company\/solarquotes\",\"https:\/\/www.youtube.com\/user\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Final Green Light For Nuclear SMR Design From US Feds","description":"The U.S. Nuclear Regulatory Commission has published its final rule giving the thumbs-up to NuScale Power\u2019s small modular reactor (SMR).","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/","og_locale":"en_US","og_type":"article","og_title":"Final Green Light For Nuclear SMR Design From US Feds","og_description":"The U.S. Nuclear Regulatory Commission has published its final rule giving the thumbs-up to NuScale Power\u2019s small modular reactor (SMR).","og_url":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2023-01-22T20:45:23+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Final Green Light For Nuclear SMR Design From US Feds","datePublished":"2023-01-22T20:45:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/"},"wordCount":555,"commentCount":5,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/","url":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/","name":"Final Green Light For Nuclear SMR Design From US Feds","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg","datePublished":"2023-01-22T20:45:23+00:00","description":"The U.S. Nuclear Regulatory Commission has published its final rule giving the thumbs-up to NuScale Power\u2019s small modular reactor (SMR).","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg","width":1200,"height":630,"caption":"NuScale SMR (small modular reactor) power plant"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/usa-nuclear-smr-mb2799\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Final Green Light For Nuclear SMR Design From US Feds"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/nuclear-smr-usa.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-igv","jetpack-related-posts":[{"id":67933,"url":"https:\/\/www.solarquotes.com.au\/blog\/smr-expensive-electricity-mb2723\/","url_meta":{"origin":70215,"position":0},"title":"Small Modular Reactors: Pricey Power?","author":"Michael Bloch","date":"November 22, 2022","format":false,"excerpt":"Even with generous subsidies from the feds, a proposed SMR (Small Modular Reactor) project in the USA appears to be following the trend set by bigger nuclear power stations planned or under construction - increasingly expensive electricity. An SMR is a small nuclear power plant that can be pre-fabricated off-site\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Small Modular Reactor (SMR) electricity cost.","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/smr-power-cost.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/smr-power-cost.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/smr-power-cost.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/smr-power-cost.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/11\/smr-power-cost.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":62520,"url":"https:\/\/www.solarquotes.com.au\/blog\/smr-nuclear-waste-mb2503\/","url_meta":{"origin":70215,"position":1},"title":"Small Modular Reactors Big On Nuclear Waste?","author":"Michael Bloch","date":"June 7, 2022","format":false,"excerpt":"Leader of the Opposition Peter Dutton says he's not afraid to have a debate about nuclear energy. That's great, but do we *really* need to have another one? Mr. Dutton was commenting on his choice of\u00a0Shadow Minister for Climate Change and Energy, Ted O'Brien MP.\u00a0 Back in 2019, Mr. O'Brien\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Small Modular Reactor (SMR) nuclear waste","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/06\/smr-nuclear-waste.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/06\/smr-nuclear-waste.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/06\/smr-nuclear-waste.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/06\/smr-nuclear-waste.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/06\/smr-nuclear-waste.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":68442,"url":"https:\/\/www.solarquotes.com.au\/blog\/talk-time-nuclear-mb2739\/","url_meta":{"origin":70215,"position":2},"title":"Ted O&#8217;Brien Says It&#8217;s Time To Talk Nuclear (Again!)","author":"Michael Bloch","date":"December 5, 2022","format":false,"excerpt":"Nuclear power booster Ted O'Brien has launched a website and survey in an effort to see his small modular reactor (SMR) dreams come true in Australia. Ted O'Brien is currently the Federal Member for Fairfax and Shadow Minister for Climate Change and Energy. He's big on nuclear energy. Among his\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Nuclear power in Australia","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/nuclear-power-conversation.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/nuclear-power-conversation.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/nuclear-power-conversation.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/nuclear-power-conversation.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/nuclear-power-conversation.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":50855,"url":"https:\/\/www.solarquotes.com.au\/blog\/productivity-commission-nuclear-mb2021\/","url_meta":{"origin":70215,"position":3},"title":"NSW Productivity Commission Has &#8220;Lost The Plot&#8221; On Nuclear Power","author":"Michael Bloch","date":"June 3, 2021","format":false,"excerpt":"The Electrical Trades Union has weighed in on the New South Wales Productivity Commission's recommendation to lift the ban on nuclear electricity generation for small modular reactors. The recommendation was one of many contained in the Commission's 371-page \"Rebooting the economy\" whitepaper released last week. What's A Small Modular Reactor?\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Nuclear power and the NSW Productivity Commission","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/nuclear-productivity-commission.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/nuclear-productivity-commission.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/nuclear-productivity-commission.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/nuclear-productivity-commission.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/06\/nuclear-productivity-commission.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":48343,"url":"https:\/\/www.solarquotes.com.au\/blog\/canavan-nuclear-smr-mb1913\/","url_meta":{"origin":70215,"position":4},"title":"Canavan Keeping The Nuclear SMR Vaporware Dream Alive\u00a0","author":"Michael Bloch","date":"March 12, 2021","format":false,"excerpt":"Coal power's demise and the 10-year anniversary of the Fukushima disaster in Japan have put the nuclear energy debate in Australia in the spotlight again. The Fukushima Daiichi nuclear disaster that began unfolding on March 11, 2011 was the most serious nuclear accident since the Chernobyl disaster in 1986. Its\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Matt Canavan, Fukushima and nuclear power in Australia","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/03\/canavan-nuclear-power.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/03\/canavan-nuclear-power.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/03\/canavan-nuclear-power.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/03\/canavan-nuclear-power.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/03\/canavan-nuclear-power.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":64081,"url":"https:\/\/www.solarquotes.com.au\/blog\/greens-labor-climate-mb2580\/","url_meta":{"origin":70215,"position":5},"title":"Greens To Support &#8220;Dutton-Proofed&#8221; Labor Climate Bill","author":"Michael Bloch","date":"August 4, 2022","format":false,"excerpt":"Australian Greens Leader Adam Bandt says his party will now support Labor's Climate Change Bill 2022 in the House of Representatives and the Senate. Speaking at the National Press Club yesterday, Mr. Bandt said backing of the bill is now doable given changes that have been negotiated.\u00a0The Greens notes those\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Climate Change Bill 2022","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/08\/labor-greens-climate.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/08\/labor-greens-climate.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/08\/labor-greens-climate.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/08\/labor-greens-climate.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/08\/labor-greens-climate.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/70215","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=70215"}],"version-history":[{"count":1,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/70215\/revisions"}],"predecessor-version":[{"id":70217,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/70215\/revisions\/70217"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/70216"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=70215"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=70215"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=70215"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}