{"id":77118,"date":"2023-07-20T14:06:24","date_gmt":"2023-07-20T03:36:24","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=77118"},"modified":"2023-07-20T14:08:01","modified_gmt":"2023-07-20T03:38:01","slug":"grid-batteries-aspley-muswellbrook","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/","title":{"rendered":"Tesla Megapacks Included in NSW&#8217;s Latest Giant Battery Approvals"},"content":{"rendered":"<div id=\"attachment_77185\" style=\"width: 1210px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-77185\" class=\"wp-image-77185 size-full\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close.jpg\" alt=\"close up of a Tesla Megapack\" width=\"1200\" height=\"628\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close-300x157.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close-1024x536.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close-768x402.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><p id=\"caption-attachment-77185\" class=\"wp-caption-text\">Tesla Megapacks &#8211; like these will be installed near Muswellbrook, NSW. The Aplsey battery manufacturer is TBC.<\/p><\/div>\n<p>Two more grid-scale battery projects have been approved in NSW renewable energy zones.<!--more--><\/p>\n<h2>Apsley: The New Home to a 120 MW \/ 240 MWh Battery<\/h2>\n<p>First, <a href=\"https:\/\/www.solarquotes.com.au\/location\/apsley-2820-nsw\/\">Apsley<\/a>, a Central West NSW town where Transgrid will build a 120 MW \/ 240 MWh battery on a 6-hectare site.<\/p>\n<p>Apsley is a small rural town in the Upper Hunter Region of New South Wales, Australia. It is located about 243 km north of Sydney.<\/p>\n<h2>Muswellbrook\u2019s Massive 150 MW \/ 300 MWh Tesla Megapack Installation<\/h2>\n<p>The second battery will be a whopping 150 MW \/ 300 MWh in <a href=\"https:\/\/www.solarquotes.com.au\/location\/muswellbrook-2333-nsw\/\">Muswellbrook<\/a> on a 1.5-hectare site adjacent to the Ausgrid substation. It will use Tesla Megapacks\u2014presumably 75 Megapacks at 4 MWh each and a hardware cost of about AUD 200 million.<\/p>\n<p>Muswellbrook is predominantly known for coal mining, and the town is home to one operating coal-fired plant, Bayswater Power Station &#8211; scheduled to close between 2030 and 2033.<\/p>\n<p>Muswellbrook is also home to the Liddell Coal Fired Power Station, which closed in April and is converting to a renewable energy hub.<\/p>\n<h2>Strategic Locations within NSW\u2019s REZs<\/h2>\n<p>Both Apsley and Muswellbrook are located within NSW renewable energy zones (REZs) \u2013 the Central-West Orana REZ and the Hunter Central Coast REZ.<\/p>\n<p>The NSW government\u2019s <a href=\"https:\/\/www.nsw.gov.au\/media-releases\/green-light-for-2-new-batteries\">media release<\/a> says the projects will<\/p>\n<blockquote><p>\u201ccreate 132 jobs\u201d and \u201cinject $280 million into NSW\u2019s economy\u201d.<\/p><\/blockquote>\n<p>The government said these are among 27 renewable, transmission and storage projects proposed for NSW that would provide 9 GW of energy storage and 5.5 MW of firming.<\/p>\n<p>Minister for Energy Penny Sharpe pointed out:<\/p>\n<blockquote><p>\u201cBatteries are not only critical to supporting our state\u2019s transition to net zero, they will assist us to get there sooner.\u201d<\/p><\/blockquote>\n<p>She noted that the energy transformation \u201cneeds to occur as soon as possible\u201d.<\/p>\n<p>If the major proposals currently before the NSW government\u2019s Department of Planning all come to fruition, a flood of batteries will be built.<\/p>\n<p>There are at least 27 other locations currently under consideration, according to the government\u2019s <a href=\"https:\/\/www.planningportal.nsw.gov.au\/major-projects\">Major Projects<\/a> site.<\/p>\n<p>These include batteries at Eathorpe, Brandy Hill, Armidale, Smithfield, Wellington, Beresfield, Lismore, Bathurst, Narromine, Bellambi Heights, Eraring, Awaba, Calala, Colonga, Belhaven, Tomago, Mt Piper, Coleambally, Ridgey Creek, Lithgow, Wellington, Balranald, Warren, Dubbo, Wallerawang, Broken Hill and Lismore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two more grid-scale battery projects have been approved in NSW renewable energy zones.<\/p>\n","protected":false},"author":23,"featured_media":77185,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[551],"tags":[],"class_list":["post-77118","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-storage","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tesla Megapacks Included in NSW&#039;s Latest Giant Battery Approvals<\/title>\n<meta name=\"description\" content=\"More giant batteries have been confirmed for regional NSW, with 240 MWh for Apsley and 300 MWh of Tesla Megapacks for Muswellbrook.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tesla Megapacks Included in NSW&#039;s Latest Giant Battery Approvals\" \/>\n<meta property=\"og:description\" content=\"More giant batteries have been confirmed for regional NSW, with 240 MWh for Apsley and 300 MWh of Tesla Megapacks for Muswellbrook.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-20T03:36:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-20T03:38:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Richard Chirgwin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/\"},\"author\":{\"name\":\"Richard Chirgwin\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/d2e4d6f75c9033945224b9de834d9be6\"},\"headline\":\"Tesla Megapacks Included in NSW&#8217;s Latest Giant Battery Approvals\",\"datePublished\":\"2023-07-20T03:36:24+00:00\",\"dateModified\":\"2023-07-20T03:38:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/\"},\"wordCount\":386,\"commentCount\":3,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/tesla-megapack-close.jpg\",\"articleSection\":[\"Battery Storage\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/\",\"name\":\"Tesla Megapacks Included in NSW's Latest Giant Battery Approvals\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/tesla-megapack-close.jpg\",\"datePublished\":\"2023-07-20T03:36:24+00:00\",\"dateModified\":\"2023-07-20T03:38:01+00:00\",\"description\":\"More giant batteries have been confirmed for regional NSW, with 240 MWh for Apsley and 300 MWh of Tesla Megapacks for Muswellbrook.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/tesla-megapack-close.jpg\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/tesla-megapack-close.jpg\",\"width\":1200,\"height\":628,\"caption\":\"A Tesla Megapack - like this one will be installed near Aspley\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/grid-batteries-aspley-muswellbrook\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Battery Storage\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/battery-storage\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tesla Megapacks Included in NSW&#8217;s Latest Giant Battery Approvals\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/d2e4d6f75c9033945224b9de834d9be6\",\"name\":\"Richard Chirgwin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r\",\"caption\":\"Richard Chirgwin\"},\"description\":\"Joining the SolarQuotes blog team in 2019, Richard is a journalist with more than 30 years of experience covering a wide range of technology topics, including electronics, telecommunications, computing, science and solar. When not writing for us, he runs a solar-powered off-grid eco-resort in NSW\u2019s blue mountains. Read Richard's full bio.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/rchirgwin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tesla Megapacks Included in NSW's Latest Giant Battery Approvals","description":"More giant batteries have been confirmed for regional NSW, with 240 MWh for Apsley and 300 MWh of Tesla Megapacks for Muswellbrook.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/","og_locale":"en_US","og_type":"article","og_title":"Tesla Megapacks Included in NSW's Latest Giant Battery Approvals","og_description":"More giant batteries have been confirmed for regional NSW, with 240 MWh for Apsley and 300 MWh of Tesla Megapacks for Muswellbrook.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2023-07-20T03:36:24+00:00","article_modified_time":"2023-07-20T03:38:01+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close.jpg","type":"image\/jpeg"}],"author":"Richard Chirgwin","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/"},"author":{"name":"Richard Chirgwin","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/d2e4d6f75c9033945224b9de834d9be6"},"headline":"Tesla Megapacks Included in NSW&#8217;s Latest Giant Battery Approvals","datePublished":"2023-07-20T03:36:24+00:00","dateModified":"2023-07-20T03:38:01+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/"},"wordCount":386,"commentCount":3,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close.jpg","articleSection":["Battery Storage"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/","url":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/","name":"Tesla Megapacks Included in NSW's Latest Giant Battery Approvals","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close.jpg","datePublished":"2023-07-20T03:36:24+00:00","dateModified":"2023-07-20T03:38:01+00:00","description":"More giant batteries have been confirmed for regional NSW, with 240 MWh for Apsley and 300 MWh of Tesla Megapacks for Muswellbrook.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close.jpg","width":1200,"height":628,"caption":"A Tesla Megapack - like this one will be installed near Aspley"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/grid-batteries-aspley-muswellbrook\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"Battery Storage","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/battery-storage\/"},{"@type":"ListItem","position":3,"name":"Tesla Megapacks Included in NSW&#8217;s Latest Giant Battery Approvals"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/d2e4d6f75c9033945224b9de834d9be6","name":"Richard Chirgwin","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c8c88b57f89cd5928211105579c715a4131736eea9b88222359e97824cb5917b?s=96&d=monsterid&r=r","caption":"Richard Chirgwin"},"description":"Joining the SolarQuotes blog team in 2019, Richard is a journalist with more than 30 years of experience covering a wide range of technology topics, including electronics, telecommunications, computing, science and solar. When not writing for us, he runs a solar-powered off-grid eco-resort in NSW\u2019s blue mountains. Read Richard's full bio.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/rchirgwin\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/07\/tesla-megapack-close.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-k3Q","jetpack-related-posts":[{"id":69432,"url":"https:\/\/www.solarquotes.com.au\/blog\/queensland-big-battery-mb2775\/","url_meta":{"origin":77118,"position":0},"title":"Green Light For Big Battery At QLD Green Power Hub","author":"Michael Bloch","date":"January 2, 2023","format":false,"excerpt":"Neoen has given the all clear for construction of a huge battery system to commence at its Western Downs Green Power Hub project site in Queensland. The France-headquartered renewable energy project developer, owner and operator announced on Thursday notices to proceed had been issued to Tesla and UGL to start\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Western Downs big battery","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/telsa-megapack-western-downs.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/telsa-megapack-western-downs.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/telsa-megapack-western-downs.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/telsa-megapack-western-downs.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/telsa-megapack-western-downs.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":69738,"url":"https:\/\/www.solarquotes.com.au\/blog\/blyth-big-battery-mb2783\/","url_meta":{"origin":77118,"position":1},"title":"Blyth Big Battery Given Go-Ahead","author":"Michael Bloch","date":"January 9, 2023","format":false,"excerpt":"Neoen announced late last week it's all systems go for another of its big battery projects, this one in South Australia. On Friday, the company said it had issued notices to proceed to contractors Elecnor and NHOA for the 200 MW \/ 400 MWh\u00a0 Blyth Battery, which is to be\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Blyth Battery - South Australia","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/01\/blyth-battery.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":52667,"url":"https:\/\/www.solarquotes.com.au\/blog\/big-battery-blaze-mb2104\/","url_meta":{"origin":77118,"position":2},"title":"Victorian Liberals Fire Up Over Big Battery Blaze","author":"Michael Bloch","date":"August 5, 2021","format":false,"excerpt":"Victoria's Shadow Minister for Energy and Renewables isn't impressed with the Andrews Labor Government's handling of the Victorian Big Battery fire. Just to briefly recap: The Victorian Big Battery is a 300 MW \/ 450 MWh energy storage project consisting of 210 Tesla Megapacks being constructed at a site near\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Victorian Big Battery fire - Tesla Megapack","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/big-battery-fire.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/big-battery-fire.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/big-battery-fire.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/big-battery-fire.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/08\/big-battery-fire.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":53788,"url":"https:\/\/www.solarquotes.com.au\/blog\/moss-landing-battery-mb2148\/","url_meta":{"origin":77118,"position":3},"title":"&#8220;Overheating&#8221; Event At Moss Landing Energy Storage Facility","author":"Michael Bloch","date":"September 8, 2021","format":false,"excerpt":"Late on Saturday evening, a major energy storage project in the USA was taken offline after an incident involving some battery modules. At 300MW\/1,200MWh,\u00a0 Phase 1 of Moss Landing Energy Storage Facility in Monterey County, California is the world\u2019s largest operational battery energy storage system (BESS). LG Energy Solution supplied\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Moss Landing Energy Storage Facility","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/09\/battery-facility-vistra.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/09\/battery-facility-vistra.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/09\/battery-facility-vistra.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/09\/battery-facility-vistra.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2021\/09\/battery-facility-vistra.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":68987,"url":"https:\/\/www.solarquotes.com.au\/blog\/community-big-batteries-mb2757\/","url_meta":{"origin":77118,"position":4},"title":"Bowen&#8217;s Community And Big Battery Blitz: More Details","author":"Michael Bloch","date":"December 19, 2022","format":false,"excerpt":"Buzz about batteries was again stirred up over the weekend by Federal Minister for Climate Change and Energy Chris Bowen. Here's what's happening. Community Battery Rollout - Next Steps One of the Albanese Government's election commitments was a $200 million investment over four years to deliver large batteries to around\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Community and big batteries - Chris Bowen","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/community-big-batteries-bowen.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/community-big-batteries-bowen.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/community-big-batteries-bowen.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/community-big-batteries-bowen.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2022\/12\/community-big-batteries-bowen.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":27209,"url":"https:\/\/www.solarquotes.com.au\/blog\/sa-grid-battery-mb0901\/","url_meta":{"origin":77118,"position":5},"title":"30 MW\/8 MWh Grid Scale Battery In SA Fully Operational","author":"Michael Bloch","date":"January 17, 2019","format":false,"excerpt":"The Australian Renewable Energy Agency (ARENA) says a 30 MW\/8 MWh grid-scale battery project at the Dalrymple substation on South Australia\u2019s Yorke Peninsula is now live and connected to the National Electricity Market (NEM). The Dalyrmple substation is located seven kilometres south-west of Stansbury, a small town located on the\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"ESCRI grid scale battery","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/escri-battery.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/escri-battery.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/escri-battery.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/01\/escri-battery.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/77118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=77118"}],"version-history":[{"count":7,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/77118\/revisions"}],"predecessor-version":[{"id":77190,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/77118\/revisions\/77190"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/77185"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=77118"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=77118"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=77118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}