{"id":92998,"date":"2025-07-02T06:03:25","date_gmt":"2025-07-01T20:33:25","guid":{"rendered":"https:\/\/www.solarquotes.com.au\/blog\/?p=92998"},"modified":"2025-07-02T06:03:25","modified_gmt":"2025-07-01T20:33:25","slug":"cec-solar-approvals-mb3216","status":"publish","type":"post","link":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/","title":{"rendered":"Approved Solar Products: How Long Does CEC Listing Take?"},"content":{"rendered":"<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-92999\" src=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals.jpg\" alt=\"CEC solar product approvals\" width=\"1200\" height=\"630\" srcset=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals.jpg 1200w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals-300x158.jpg 300w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals-1024x538.jpg 1024w, https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>We&#8217;ve often heard solar manufacturers and importers lament the lengthy process for solar panels, inverters and batteries to get a coveted Clean Energy Council approval. And now we have a better idea of how long it&#8217;s currently taking.<!--more--><\/p>\n<p>The Clean Energy Council is gatekeeper for solar products (small-scale renewables) connecting to the grid in Australia.<\/p>\n<blockquote><p>&#8220;As the product accreditation body, it is our role to protect Australian families by ensuring products meet high standards of quality, safety and reliability,&#8221; states the organisation. &#8220;Applications undergo a thorough and rigorous review process to ensure compliance with quality and safety standards.&#8221;<\/p><\/blockquote>\n<p>Approval is a very big deal as without it systems are not eligible for some incentives, such as the just-launched <a href=\"https:\/\/www.solarquotes.com.au\/battery-storage\/federal-rebate\/\">Cheaper Home Batteries program<\/a> and the <a href=\"https:\/\/www.solarquotes.com.au\/panels\/rebate\/\">national solar panel rebate<\/a>; both of which can knock thousands off the up-front cost of purchase. And when it comes to solar inverters and batteries, most (all?) electricity networks won&#8217;t allow them to connect the grid unless they have this accreditation. It&#8217;s also worth mentioning the gatekeeper role is a <a href=\"https:\/\/www.solarquotes.com.au\/blog\/end-cec-product-approval\/\">nice little earner<\/a> for the organisation and is very important to the ongoing viability of the CEC.<\/p>\n<p>The CEC has been accrediting <a href=\"https:\/\/www.solarquotes.com.au\/panels\/\">solar panels<\/a> and <a href=\"https:\/\/www.solarquotes.com.au\/inverters\/\">inverters<\/a> since 2011, and <a href=\"https:\/\/www.solarquotes.com.au\/battery-storage\/comparison-table\/\"> batteries<\/a> since 2021. And for as long as I can remember, there have been gripes concerning the timeframe involved in getting new gear approved.<\/p>\n<p>While a rushed job is often a bad job and it&#8217;s super-important solar components are of good quality<sup class='endnote'><a href='https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/#en-92998-1' id='enref-92998-1' onclick='return hhEndnotes_show(92998)'>1<\/a><\/sup>, I had previously seen some manufacturers claim waiting up to a year to complete the process.<\/p>\n<p>In 2020, then-Minister for Energy and Emissions Reduction Angus Taylor ordered a review of Australia&#8217;s Small-Scale Renewable Energy Scheme (SRES) that included scrutinising the approval process for and managing ongoing compliance of panels and solar inverters. The review was carried out by the Clean Energy Regulator, which after a lengthy investigation arrived at the conclusion the CEC should continue in this capacity \u2014 with a significant change being accountability to the Regulator.<\/p>\n<p><a href=\"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-product-listing-mb3042\/\">Amid some protests<\/a>, that came to pass in late 2024. But the Regulator made it clear a number of improvements would need to be made, including more rapid application processing times.<\/p>\n<h2>CEC Reboot Progress<\/h2>\n<p>At the time the Clean Energy Council was battling to maintain its solar guardian status, the organisation said it was already making changes in this regard; including doubling the capacity of its Products team, with more staff to come on board. It also committed to streamlining processes and providing applicants with transparent application tracking, along with having stronger focus on customer service and response times.<\/p>\n<p>So, now the CEC has had a renewed lease on the job for some time, how are things going on listing timeframes?<\/p>\n<p>The organisation has recently started publishing information on the backlog for equipment approvals based on the previous month to help manufacturers plan ahead, with timings updated at the beginning of each month. As the calendar has only just flipped over to July, processing times for June aren&#8217;t available just yet for all categories in terms of *beginning* the engineering technical assessment process:<\/p>\n<ul>\n<li><b>Solar panels:<\/b> 3 weeks in May.<\/li>\n<li><b>Solar inverters:<\/b> 13 weeks in June (up from 11 in May).<\/li>\n<li><b>Batteries:<\/b> 12 weeks in May.<\/li>\n<\/ul>\n<p>And in each category, full accreditation was typically taking a *further* 2 to 6 months (quite a range), depending on application completeness says the CEC \u2014 up to 9 months from go-to-whoa in the case of inverters and batteries.<\/p>\n<p>So, if you&#8217;re hankering after solar gear you&#8217;ve seen overseas that&#8217;s not available in Australia yet and the manufacturer claims the hold-up is with the CEC, there&#8217;s a good chance this is indeed the case.<\/p>\n<p>Further information on the CEC Approved Products Program <a href=\"https:\/\/cleanenergycouncil.org.au\/industry-programs\/products-program\">can be found here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We&#8217;ve often heard solar manufacturers and importers lament the lengthy process for solar panels, inverters and batteries to get a coveted Clean Energy Council approval. And now we have a better idea of how long it&#8217;s currently taking.<\/p>\n","protected":false},"author":17,"featured_media":92999,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[678],"tags":[],"class_list":["post-92998","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-battery-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Approved Solar Products: How Long Does CEC Listing Take?<\/title>\n<meta name=\"description\" content=\"Solar manufacturers often lament the lengthy process to get coveted Clean Energy Council approval. Here&#039;s how long it&#039;s currently taking.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Approved Solar Products: How Long Does CEC Listing Take?\" \/>\n<meta property=\"og:description\" content=\"Solar manufacturers often lament the lengthy process to get coveted Clean Energy Council approval. Here&#039;s how long it&#039;s currently taking.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/\" \/>\n<meta property=\"og:site_name\" content=\"SolarQuotes Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarQuotes\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-01T20:33:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michael Bloch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@solar_quotes\" \/>\n<meta name=\"twitter:site\" content=\"@solar_quotes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/\"},\"author\":{\"name\":\"Michael Bloch\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\"},\"headline\":\"Approved Solar Products: How Long Does CEC Listing Take?\",\"datePublished\":\"2025-07-01T20:33:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/\"},\"wordCount\":659,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/cec-product-approvals.jpg\",\"articleSection\":[\"General Solar &amp; Storage News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/\",\"name\":\"Approved Solar Products: How Long Does CEC Listing Take?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/cec-product-approvals.jpg\",\"datePublished\":\"2025-07-01T20:33:25+00:00\",\"description\":\"Solar manufacturers often lament the lengthy process to get coveted Clean Energy Council approval. Here's how long it's currently taking.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/cec-product-approvals.jpg\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/cec-product-approvals.jpg\",\"width\":1200,\"height\":630,\"caption\":\"CEC solar product approvals\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/cec-solar-approvals-mb3216\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General Solar &amp; Storage News\",\"item\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/category\\\/solar-battery-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Approved Solar Products: How Long Does CEC Listing Take?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"name\":\"SolarQuotes Blog\",\"description\":\"An independent reckoning of the Aussie solar scene\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#organization\",\"name\":\"SolarQuotes\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/solarquotes-logo.png\",\"width\":592,\"height\":600,\"caption\":\"SolarQuotes\"},\"image\":{\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SolarQuotes\\\/\",\"https:\\\/\\\/x.com\\\/solar_quotes\",\"https:\\\/\\\/www.instagram.com\\\/solarquotes\\\/\",\"https:\\\/\\\/au.linkedin.com\\\/company\\\/solarquotes\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/SolarQuotesAustralia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/#\\\/schema\\\/person\\\/66afd571aa00c2e442f0192ebac2f6f1\",\"name\":\"Michael Bloch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r\",\"caption\":\"Michael Bloch\"},\"description\":\"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.\",\"url\":\"https:\\\/\\\/www.solarquotes.com.au\\\/blog\\\/author\\\/michael\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Approved Solar Products: How Long Does CEC Listing Take?","description":"Solar manufacturers often lament the lengthy process to get coveted Clean Energy Council approval. Here's how long it's currently taking.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/","og_locale":"en_US","og_type":"article","og_title":"Approved Solar Products: How Long Does CEC Listing Take?","og_description":"Solar manufacturers often lament the lengthy process to get coveted Clean Energy Council approval. Here's how long it's currently taking.","og_url":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/","og_site_name":"SolarQuotes Blog","article_publisher":"https:\/\/www.facebook.com\/SolarQuotes\/","article_published_time":"2025-07-01T20:33:25+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals.jpg","type":"image\/jpeg"}],"author":"Michael Bloch","twitter_card":"summary_large_image","twitter_creator":"@solar_quotes","twitter_site":"@solar_quotes","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/#article","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/"},"author":{"name":"Michael Bloch","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1"},"headline":"Approved Solar Products: How Long Does CEC Listing Take?","datePublished":"2025-07-01T20:33:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/"},"wordCount":659,"commentCount":1,"publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals.jpg","articleSection":["General Solar &amp; Storage News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/","url":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/","name":"Approved Solar Products: How Long Does CEC Listing Take?","isPartOf":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/#primaryimage"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/#primaryimage"},"thumbnailUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals.jpg","datePublished":"2025-07-01T20:33:25+00:00","description":"Solar manufacturers often lament the lengthy process to get coveted Clean Energy Council approval. Here's how long it's currently taking.","breadcrumb":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/#primaryimage","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals.jpg","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals.jpg","width":1200,"height":630,"caption":"CEC solar product approvals"},{"@type":"BreadcrumbList","@id":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-approvals-mb3216\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.solarquotes.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"General Solar &amp; Storage News","item":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},{"@type":"ListItem","position":3,"name":"Approved Solar Products: How Long Does CEC Listing Take?"}]},{"@type":"WebSite","@id":"https:\/\/www.solarquotes.com.au\/blog\/#website","url":"https:\/\/www.solarquotes.com.au\/blog\/","name":"SolarQuotes Blog","description":"An independent reckoning of the Aussie solar scene","publisher":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.solarquotes.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.solarquotes.com.au\/blog\/#organization","name":"SolarQuotes","url":"https:\/\/www.solarquotes.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","contentUrl":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2019\/05\/solarquotes-logo.png","width":592,"height":600,"caption":"SolarQuotes"},"image":{"@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SolarQuotes\/","https:\/\/x.com\/solar_quotes","https:\/\/www.instagram.com\/solarquotes\/","https:\/\/au.linkedin.com\/company\/solarquotes","https:\/\/www.youtube.com\/user\/SolarQuotesAustralia"]},{"@type":"Person","@id":"https:\/\/www.solarquotes.com.au\/blog\/#\/schema\/person\/66afd571aa00c2e442f0192ebac2f6f1","name":"Michael Bloch","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","url":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c65d1fbade4404d88617552594a54366d8ca4a78bd617a48e64f9340c0b5dc09?s=96&d=monsterid&r=r","caption":"Michael Bloch"},"description":"Michael caught the solar power bug after purchasing components to cobble together a small off-grid PV system in 2008. He's been reporting on Australian and international solar energy news ever since.","url":"https:\/\/www.solarquotes.com.au\/blog\/author\/michael\/"}]}},"jetpack_featured_media_url":"https:\/\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/07\/cec-product-approvals.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2FF2s-obY","jetpack-related-posts":[{"id":72631,"url":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-product-listing-mb2870\/","url_meta":{"origin":92998,"position":0},"title":"CEC To Duke It Out For Approved Solar Product Listing Role","author":"Michael Bloch","date":"March 22, 2023","format":false,"excerpt":"Australia's Clean Energy Council (CEC) has signalled it wishes to continue in its role of keeper of the \"single source of truth\" on approved solar products. For a solar power system to be eligible for Australia's solar rebate, it must use CEC-approved solar panels and inverters. The Clean Energy Council\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Australian approved solar products listings","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/approved-solar-products.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/approved-solar-products.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/approved-solar-products.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/approved-solar-products.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2023\/03\/approved-solar-products.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":93872,"url":"https:\/\/www.solarquotes.com.au\/blog\/cec-approved-products-mb3247\/","url_meta":{"origin":92998,"position":1},"title":"Inside The CEC&#8217;s Approved Solar Products Program","author":"Michael Bloch","date":"August 14, 2025","format":false,"excerpt":"The Clean Energy Council's (CEC's) Approved Product lists are big. Really big. Discover how many products are listed, the number of applications rejected, plus other related facts and figures. The Clean Energy Council is gatekeeper for solar products in Australia \u2014 listing solar panels, inverters, and batteries meeting Australian standards.\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Clean Energy Council solar product listing","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/08\/cec-product-listings.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/08\/cec-product-listings.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/08\/cec-product-listings.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/08\/cec-product-listings.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2025\/08\/cec-product-listings.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":22646,"url":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-panel-expiry-mb0650\/","url_meta":{"origin":92998,"position":2},"title":"CEC Flags Solar Panel &#8220;Expiry Date&#8221; Deadline","author":"Michael Bloch","date":"July 3, 2018","format":false,"excerpt":"While there's no best-before or use-by dates for solar panels, there is an expiry date on PV modules that impacts on eligibility for Australia's solar rebate. In order for a solar power system to be eligible for Australia's major solar subsidy, which is based on Small-scale Technology Certificates (STCs), the\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"CEC solar panel expiry reminder","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/cec-panel-expiry.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/cec-panel-expiry.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/cec-panel-expiry.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2018\/07\/cec-panel-expiry.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":14189,"url":"https:\/\/www.solarquotes.com.au\/blog\/home-battery-standards-australia-0171\/","url_meta":{"origin":92998,"position":3},"title":"CEC Challenges Home Battery Storage Standards Overkill","author":"Michael Bloch","date":"August 17, 2017","format":false,"excerpt":"Australia's Clean Energy Council has lodged a submission with Standards Australia in an effort to change draft home battery standards it views as overkill and that will threaten residential energy storage uptake. Earlier this year, Standards Australia published a draft standard for home battery storage that will require certain types\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Home solar battery standards in Australia","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/battery-storage-australia.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/battery-storage-australia.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/battery-storage-australia.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/08\/battery-storage-australia.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":85286,"url":"https:\/\/www.solarquotes.com.au\/blog\/cec-solar-listings-mb2965\/","url_meta":{"origin":92998,"position":4},"title":"CEC May Retain Approved Solar Product Gatekeeper Status","author":"Michael Bloch","date":"July 17, 2024","format":false,"excerpt":"The Clean Energy Regulator has proposed to nominate the Clean Energy Council (CEC) to continue as the solar panel and inverter product listing body under Australia's Small-scale Renewable Energy Scheme (SRES). For a solar power system to qualify for Australia's solar rebate (and some state incentives), the solar panels and\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar product listing nomination","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/07\/solar-product-nomination.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/07\/solar-product-nomination.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/07\/solar-product-nomination.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/07\/solar-product-nomination.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2024\/07\/solar-product-nomination.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":12611,"url":"https:\/\/www.solarquotes.com.au\/blog\/australia-solar-battery-standards-mb0088\/","url_meta":{"origin":92998,"position":5},"title":"CEC Approved Solar Battery List On The Horizon","author":"Michael Bloch","date":"June 21, 2017","format":false,"excerpt":"Australia's Clean Energy Council is seeking battery supplier cooperation as part of preparation for including solar energy storage solutions on its Approved Products List. The CEC is asking battery suppliers that have tested their products to IEC 62619 to share the information with the Council. The IEC (International Electrotechnical Commission)\u2026","rel":"","context":"In &quot;General Solar &amp; Storage News&quot;","block_context":{"text":"General Solar &amp; Storage News","link":"https:\/\/www.solarquotes.com.au\/blog\/category\/solar-battery-news\/"},"img":{"alt_text":"Solar batteries in Australia","src":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/06\/australia-battery-installation-standards.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/06\/australia-battery-installation-standards.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/06\/australia-battery-installation-standards.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.solarquotes.com.au\/blog\/wp-content\/uploads\/2017\/06\/australia-battery-installation-standards.png?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/92998","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/comments?post=92998"}],"version-history":[{"count":6,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/92998\/revisions"}],"predecessor-version":[{"id":93005,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/posts\/92998\/revisions\/93005"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media\/92999"}],"wp:attachment":[{"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/media?parent=92998"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/categories?post=92998"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solarquotes.com.au\/blog\/wp-json\/wp\/v2\/tags?post=92998"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}