Solar’s Hidden Metering Cost – And Tips To Avoid It

old queensland meter board

Inaccessible, no hinge, ceramic fuses, disintegrating chipboard, duct tape! This is a hamburger with the lot.

Solar Electricity Meters – The Situation Is Unhinged

Recently I fielded a question from a frustrated customer who couldn’t believe she was given so many different opinions about what she needed to do with her retail electricity meter. It seemed that even the eight solar industry professionals had eight different ideas. It can be a minefield.

Utility metering is like an unwanted hot potato. In the days of yore, the network authorities (DNSPs) used to handle this task. But since implementing “Power Of Choice” metering contestability rules, the ball shifted into the electricity retailers’ court. Now, it’s a responsibility that everyone in the electricity industry wants to dodge.

Here’s an example from Queensland.

The Problem : An Old, Non-Compliant Meter Position

Despite the customer having a remotely read meter that nobody had visited in 5 years, concerns were raised that a new one needed to be installed, which meant possible asbestos removal, a new box, a hinged panel for access to the wiring behind, and maybe even the huge expense of complete relocation to the front of the house. This can even mean service upgrades to the house, and in one instance, I have seen quotes for $15,000 to directional bore under a roadway because a legacy overhead supply cable didn’t meet current rules.

Located in the laundry, no hinges, asbestos, ceramic fuses… this place got demolished.

The Solution: Get Your Retailer Involved

If you’re in the throes of getting solar panels, or it’s on the list of things to do soon, reach out to your electricity retailer. Ask if they can program your meter for solar remotely. If your meter is modern enough (i.e. it’s a smart meter) and there’s an internet connection available, they will likely be able to carry out the task without any technician needing to darken your door.

However, if the electricity retailer advises that your meter cannot be reprogrammed for solar, they’re legally entitled to charge you for a new one. I think it’s the height of hypocrisy that they want your money to make their business cheaper to run, so don’t give in too easily.

Switchboard in laundry cupboard

Amazingly the retailer changed this meter to the latest remote read 4G network-connected unit, (without the customer initiating it) despite no hinges and tiny cotton/rubber consumer mains. The wiring in the roof was a death trap.

 

This is the death trap mentioned in the previous image. Disturbing wiring like this kills people. When old metal conduits fall apart, they can shear through the crumbly rubber insulation of the live wires inside. With the earth path broken, anyone touching the conduit can be electrocuted.

Switching Electricity Retailers Can Save You Paying

If you do need a new meter, consider shopping for an electricity retailer offering a free meter change as an incentive to earn your business. This customer-acquisition strategy is not uncommon among retailers as it costs about $500 in marketing costs for an electricity retailer to sign up a new customer. Tell them you are keen to sign up – but not if you must pay for the new meter.

The Rules of Engagement: Who’s Responsible for Your Meter?

Electricity retailers can change meters at their discretion. The key is that if they initiate it themselves, there seem to be fewer rules that apply. You need to encourage them to make the change without actually asking for a solar upgrade in the first place.

If you, the customer, initiate a meter change due to a solar application, they consider it a consumer driven upgrade. The authorities see it as an opportunity to get everything brought up to current specification at your expense, so brace yourself for potential complexities.

To assist you, we’ve compiled a handy guide on what can be involved if you need to upgrade your switchboard.

These panels are hinged, but the black one is still likely to be asbestos. It’s time these were overhauled.

It’s Not All Bad News

Navigating the complexities of utility metering shouldn’t be so hard, but it becomes a manageable task with the right information. Remember, there’s always a solution, even if it means switching retailers to get the best service. Smart metering gives you the customer more tools and more options to monitor consumption and cost, while also offering the networks more detailed information to better manage the energy transition, uptake of electric mobility and electrification of everything else.

One of the best things about owning a smart meter is you can download almost real-time consumption data (if you know where to download your smart meter data), and then analyse it with powerful, free tools.

 


 

Appendix: An example of the rules.

If You’re Having Trouble Sleeping; Read on…

Your DNSP may dictate the rules, but the meter is provided by a subcontractor working for the electricity retailer. The subcontractor could be any of numerous companies, such as Intellihub, ActiveStream, Vector, TMS Group, and Plus ES.

However, the ease or difficulty of the process largely depends on the electricity retailer’s initiative and approach. It can come down to the mechanic on the day. Pragmatists may install whatever they have at hand and move on, while others can be sticklers for the rules. And as you are about to find out – the rules are many.

For customers with an unquenchable thirst for knowledge, you can delve further into metering intricacies by visiting various online resources such as

The Metering Rules Are Onerous: Queensland As An Example

To understand why the professionals in the example at the beginning of this post were so confused about the requirements for a new, compliant meter, I thought sharing some of the rules would be helpful.

In Queensland, you can find the metering rules at various online resources, including Energex’s contractor information, the Queensland Electricity Metering Manual, and the Queensland Electricity Connection Manual (QECM).

For a quick summary, this is the part where you have to supply the box, for two different authorities (the DNSP and the retailer) to put their stuff in, and it has to meet their rules.

Queensland Electricity Metering Manual
2. METERING REQUIREMENTS
General: This section includes metering requirements, for specific information contact the metering provider.

 

Where a customer directs a retailer to request metering or tariff changes, any alterations to the
customer’s switchboard installation or meter enclosure shall be the customer’s responsibility (e.g. removal of asbestos contaminated waste).

 

Metering equipment deemed to be necessary by the metering provider to record electricity
consumption shall be supplied and maintained by the metering provider and shall remain their property.

 

Network devices deemed to be necessary to control electricity consumption shall be supplied and maintained by the distributor and shall remain their property

 

All metering and control equipment shall be back-wired and mounted on a hinged panel attached to a metering enclosure or a switchboard frame.

The QECM connection manual provides a detailed list of metering rules, spanning seven pages from page 70 onwards. It outlines the responsibilities of customers for meter housing and maintenance, suitable locations for meter installation, and mounting specifications for metering equipment. I’ve extracted some of the appropriate parts here :

Queensland Electricity Connection Manual
Page 70 of 127 Manual 01811 Ver 3
Joint document between Energex and Ergon Energy

 

Metering and Control Equipment – Accommodation
The customer shall provide and maintain at their expense, suitable space, housing,
mounting and connecting facilities to accommodate meters and control equipment for
each supply arrangement (e.g. general and controlled supplies).

 

The customer shall provide safe and ready access so that meters and control
equipment may be fixed, read, tested, adjusted and removed without difficulty at any
reasonable time but generally between the hours of 8.00am to 5.00pm Monday to
Friday. 

 

Unless otherwise approved by the distributor, or as varied by Section 6.9.4, all meters
and control equipment supplied for any one installation (as defined in the National
Electricity Rules) shall be located in one readily accessible position, preferably on an
outside wall at the front of the building.

 

Direct connected meters shall be positioned in the same location as the Main switch
and MEN point to allow required testing to be undertaken by the distributor.

 

Residential Properties
On single or multiple residential premises a meter position suitable to the distributor
shall satisfy the following criteria:

 

(a) unless otherwise approved in writing by the distributor, meters shall be erected on
the side of the premises facing a street from which there is pedestrian access or
within the first 2 m along an adjacent side of the premises. (refer to Drawing QECM
6.5); and-.
(b) meters shall not be located behind any fence in an urban area, other than the
perimeter fence located at the extremities of the property boundary.

 

The following locations are unsuitable for the installation of all metering equipment:
(r) Secured private areas.

 

Metering and Control Equipment – Mounting
Mounting Arrangement
All meters, network devices and metering isolation links must be mounted on a side
hinged panel so that the metering and control equipment always remains in the vertical
plane. Meters and network devices must be mounted vertically with cable connections
at the bottom.

 

Panel Fixings
(a) Meter panels shall be constructed of a durable, non-conducting, fire resistant
material with low water absorption properties and shall not contain asbestos.

 

Alterations requiring a replacement meter panel shall comply with the above.
Existing meter panels in good condition that do not contain asbestos do not
require replacement however insulated fire-retardant backing boards with low
water absorption properties and not containing asbestos must be installed behind
all new and retrofitted electronic equipment associated with the customers
metering and control equipment on existing panels that are not constructed of fire
resistant material.

 

 

About Anthony Bennett

Anthony joined the SolarQuotes team in 2022. He’s a licensed electrician, builder, roofer and solar installer who for 14 years did jobs all over SA - residential, commercial, on-grid and off-grid. A true enthusiast with a skillset the typical solar installer might not have, his blogs are typically deep dives that draw on his decades of experience in the industry to educate and entertain. Read Anthony's full bio.

Comments

  1. Thank you for your article which provided an answer to my long standing question about which heat pump hot water system brands are worth considering, given the proliferation of horror stories.

  2. Peter McDougall says

    Origin are about to change my metering system although I have an I.credit 500B installed when we put solar on years ago and we had to pay for the meter. At that time the electrician left the old time clock and meter for the off peak for the backup to our solar hot water system.
    I take it that will all go and the new meter will control the off peak as well.
    My question is what else will they be able to control remotely ?
    eg, will they be able to control solar feed in because it is becoming obvious they don’t want our solar input a lot of the time . Our FIT has lately been reduced again also limiting to 14kw/hrs per day then drops to a ridiculously
    Low level.
    I’m sure information on the above would be very informative to us here in the NSW Essential / Origin area. Thank You Peter McDougall

    • Anthony Bennett says

      Hi Peter,

      A remotely read internet connected meter can control off peak if it’s programmed for that and going forward, as “off peak” is changed from midnight to midday, the network will likely change the time & duration of controlled loads to better suit the glut of cheap solar we now have. This is a good thing.

      Some people are uncomfortable with the idea that the retailers can switch off the supply to your house if you don’t pay the bill, however the more important part is that modern smart meters can measure network impedance and because they talk to each other there is an ability to detect and shut down a very dangerous fault condition.

      If your supply suffers what electricians call a “loose neutral” then anything that is connected to the protective earth circuit (like the metal casing of your fridge, washing machine or toaster… and the house plumbing!) will actually become live. The latest retail smart meters will detect this and turn the house off.

      Retailers and DNSPs in NSW can’t throttle solar systems at the moment. Going forward they’ll likely follow SA, Qld & soon Victoria in deploying flexible exports. This isn’t a metering function but a solar equipment update for new installs.

      Have a look through our FAQs for more information

  3. Steven Fennell says

    I got a 1KVA installed at the very onset of solar subsidies. Given I live on an island in the Southern Morton Bay area I was dumbstruck to see a tradesman in the only taxi on the island turn up and while the cab waited took out the off peak meter.

    I got no advance notice …………..no how’s it going nothing.

  4. Probably a silly question but it’s bugging me so here goes. I asked a local electrician about solar and was told I had too many trees. I’m no expert but in my opinion there’s only one tree that would possibly be tall enough to affect some of the afternoon light. But I’ve been reading (on here) about panels with microinverters and that could be a solution. In spite of that though, I live in a cold area and all the trees are deciduous so during the cold months, there are no leaves. My main goal of getting solar is to reduce my winter heating costs (I have R/C air cons). All comments/suggestions welcome.

    • Anthony Bennett says

      Hi Marlene,

      The best way to know is consult a solar specialist who has a Suneye or Solar Pathfinder, but sadly many installers don’t even own one. Microinverters are great for complex roofs where you have small groups or single panels facing different directions but I would prefer a Fronius or SMA sting inverter myself if it can be made to work.

      I’ve seldom ever seen a place where solar doesn’t make sense, and if you’re talking about winter then you need to cover the roof with as much as possible. You may only get 10% yield some days but that’s 10% more than nothing and in overcast conditions shade doesn’t matter anyway.

      • Thank you for this advice. It confirms what I thought about getting solar. I mean, I have a roof, no buildings close by and maybe one tree that might need a trim. I’ll see if I can find someone with proper instruments. Thanks again.

  5. We declined a smart meter recently but I am told that eventually everyone in Qld. will have one installed. I can foresee in future there will be 5 or more levels of time usage with different payment tiers in a 24 hr. period. With all the fees solar owners have to pay, we got a $78 credit on the quarterly bill; however, if it is under $100, Energex won’t deposit it to our bank a/c as requested.

  6. We haven’t had our meter read since March 2022 because SA Power said they saw our dog on the property and are now refusing to come past the gate! They won’t accept a self read and so have told me that the only option is to get a smart meter so that it can be read remotely.

    We are in Crafers West, SA, have 10kW of solar panels,13.5 kWH of batteries, 2 phase power and currently export more power than we use. Obviously with a smart meter we will automatically be put on TOU rate. Do you see any disadvantage for us to do this? We have recently switched to OVO who are currently offering one of the lowest flat rates.

    • Finn Peacock says

      With a battery, ToUs can work to your advantage – but it depends on how much grid you use and when. If you have a chat with bill-hero they can analyse your bill and advise what it would be on the best ToU compared to OVO flat rate. They charge about $70 per year for this service – but only if they can save you more than $70 per year on your bill.

    • Anthony Bennett says

      Hi Andrew,

      Dumb meters can’t do TOU. Smart meters mean you can be on TOU, and that’s likely where everyone will head, but the retailer has the option of offering block pricing. Most retailers will accept self reads but SAPN like to see the meter once a year at least.

Speak Your Mind

Please keep the SolarQuotes blog constructive and useful with these 5 rules:

1. Real names are preferred - you should be happy to put your name to your comments.
2. Put down your weapons.
3. Assume positive intention.
4. If you are in the solar industry - try to get to the truth, not the sale.
5. Please stay on topic.

Please solve: 19 + 6 

Get The SolarQuotes Weekly Newsletter