Thinking Of Installing EV Chargers At Work? Read This First


Say Hello to the Future of Workplace Amenities – The EV Charger

Imagine a world where arriving home from work includes a fully charged electric car, and the humdrum petrol station detour becomes a thing of the past. Sound far-fetched? Well, not if your workplace is visionary enough to install EV chargers.

Forget about a fuel card or a Christmas party; it’ll be the cheapest company morale you’ll ever buy, especially when charged from your commercial solar system or just cheap daytime grid electricity. Heck, if you line your ducks up, the grid will often pay your company to charge your employees’ cars as daytime electricity prices increasingly go negative.

I know; it sounds like a scene from a sci-fi novel. But trust me, with a progressive approach and a little planning, you can make this future a reality. Let’s delve into EV charging at work.

Why You’ll Be Boss of the Month for Installing EV Chargers

Installing EV chargers at your workplace is a win-win situation. Not only will your employees and customers (especially those cashed-up ones cruising around in their electric cars) thank you for it, but it’s also a great way to chip in for the greater good. 1.

The Importance of Daytime EV Charging

I have sat through a lot of conferences & webinars recently and listened to a lot of clever people, and I can’t stress this point enough;

It’s essential that we get folks to charge their EVs during the day.

This is all part of the big picture for Australia’s energy goals. You might’ve heard of the ‘duck curve’ – well, smoothing that out is vital for our power networks, reducing carbon intensity, and making our economy more stable. Sunny Australia doesn’t need Saudi Arabia, if we just focus on storing the energy available to us instead of importing fossils from extremist theocracies.

 

SA Power Networks (SAPN) are already planning what the network needs.

Encouraging daytime EV charging is like hitching a ride on a wave of cheap solar energy flooding the grid. It’s a smart move, and it means we’re making the most of the huge battery storage capacity sitting in our rapidly growing fleet of electric cars across Australia.

It bolsters the stability of our power networks during minimum demand events and, as Vehicle To Home rolls out, is set to provide increasing support when our infrastructure is under strain due to the evening peak. Your employees can tootle home and siphon off some ‘fuel’ to cook tea, run the TV and keep the fridge cold.

How Many EV Chargers Does My Workplace Need?

I would recommend that whatever plan is hatched, it should anticipate that every car parking space will one day need a charger. If you have to dig up the asphalt, make sure there are spare conduits and drawstrings to add more capacity easily. Not just more copper for the chargers themselves, but data cables for connectivity too.

What’s The Difference Between Level 1, Level 2, and Level 3 DC Fast Charging Stations?

Level 1 is a trickle charger plugged into an ordinary power point. It will charge at just over 2 kW, so an 8-hour day will put about 16 kWh into an EV. That’s all of Irene the iMiev’s battery, half of a Mini Cooper’s and about a quarter of a Tesla Model Y’s battery.

level 1 ev charger for mini electric

If your employees are happy trickle charging – you just need to provide a standard 10A socket for them to plug their ‘Level 1’ mobile connector into.

Level 2 is a hard-wired AC connection that will charge at 7kW (32A) on a single-phase supply and up to 22kW on a 3-phase supply (32A per phase) – although most cars on sale in Australia max out at 11 kW (16A per phase) from 3-phase Level 2 chargers.

Level 2 E chargers

Wall-mounted Level 2 EV chargers are almost 4x faster than Level 1 and look more professional than powerbricks sitting on the floor.

Level 3 can shoot high-voltage DC directly into the battery at speeds from 50kW to well over 100kW. These are much more expensive to install, often requiring large infrastructure works, and sometimes attracting crippling ‘demand charges’ from your electricity retailer because they are so peaky.

level 3 workplace charger

A Level 3, DC fast charger, installed at Whyalla Veterinary Clinic

What Charging Speed Suits My Workplace?

Seeing as you’re at work for 8 hours a day 2 you’re not likely to need fast charging. A standard power point and a “granny charger” might be just what the accountant ordered. I would still insist that if you have to install infrastructure, it might as well be future-proofed with enough conduit/cable/data to handle a “proper” charger later. The labour costs will be similar, whether it’s a standard general-purpose outlet or a 3-phase 32A one.

Using the EVSE supplied by the factory will save $1000 on a wall-mounted unit. It’ll charge 100km in a Tesla Model 3, and let’s be honest; it’s a waste of your life if you commute that far daily.

On the other hand, Level 2 chargers look more professional and are the only way to get built-in smarts for off-peak/solar charging and billing. They also make it easier for customers and short-term visitors to top up on the go.

What Do EV Charging Stations Cost?

Assuming no major infrastructure changes are required, expect Level 2 chargers to start at about $2500 per charger, installed. For Level 3 chargers, expect to pay well over $10,000 per charger plus infrastructure upgrades.

Do We Need Costly Electrical Upgrades?

If you are putting in multiple Level 2 chargers or Level 3 chargers, the cost of upgrading the electrical feed to your premises could be substantial.

A Level 1 charger needs 10 amps, and a Level 2 charger needs 32 amps. That’s on top of the amps your office needs to get its work done. So depending on how many chargers you want, you may be looking at upgrading your electrical supply.

Getting from 63A to 100A per phase may not be too hard because standard utility meters will handle that. Going over 100amps means getting network engineering approval, using current transformers and installing a meter box the size of your fridge.

Bear in mind though that if you are planning a substantial solar power system, some of this work may be inevitable. If you want a 100kW solar setup, you’ll need 3 phase, 150amps and 70mm² cables. If that sounds like gobbledygook then think of solid copper wires, as thick as your little finger.

While it may appear to be madness, the benefit could well be that after all this expensive electrical work, you’ll find an EV delivery van is actually now viable to run from your address, (plus an electric forklift) which unlocks a lot of savings in fuel and maintenance. Being able to fast charge while they’re loading up for the afternoon delivery run can effectively double the range of your EV.

Save Money By Sharing Your Existing Supply Between Chargers

You can often avoid expensive electrical upgrades by installing chargers that share the supply available. It won’t be as fast, but when chargers cooperate to share a load, the feature is called ‘load balancing’, and it’s available in chargers from the likes of Schneider or Zekicharge, to name just a couple.

My last employer had around a dozen car parks and a 100amp 3-phase grid connection, meaning that three 32 amp chargers would use the whole supply from the street, leaving nothing for the hardest working part of the business, the coffee machine.

Things would be alleviated by the 30kW rooftop solar system, but not at 6:30 am when the queue for caffeine was most critical. So I would recommend that load balancing (often achieved via OPCC connectivity) will be very handy in the future.

How Can I Manage Charger Usage?

Can they be restricted to employee use only? 

Your company’s generosity will dictate whether you have to use some authorised payment system and track every watt so the bean counters can allot the cost to the correct driver. Or you might just list the charger on Plugshare for the public to find and let anyone have a crack at any time of day or night.

Access control can either be through a personal PIN, a swipecard/fob, or by simply recognising the car’s digital signature when it plugs in.

Who Handles Charging Time Limits or Schedules?

With a compatible tariff or commercial solar system, smart chargers can be configured only to allow charging when grid electricity is cheap, green or both.

Perhaps the simplest way would be a dumb charger and a dumb time switch that limits it to daylight hours, or a smart charger so that the on-site rooftop solar can do the work without paying for network energy.

Who Installs Workplace EV Chargers?

Unlike solar, any licenced electrician can install an EV charging station. But suppose you are installing a smart charger, especially if you want it to play nice with onsite solar, or a variable grid tariff. In that case, I’d recommend an electrician with EV charger experience. SolarQuotes can help you by getting up to 3 quotes for EV charger installation from sparkies we trust to do it properly.

What About Repairs and Upkeep?

EV chargers don’t need any special maintenance, but I have seen savvy customers occasionally clean the pins in the socket using a cotton bud and some light solvent in a spray can. And you should bear in mind that if the general public are involved, a commercial-grade charger will likely be more durable than one aimed at a domestic customer. The original installer should be your first port of call if they need repairing, but be aware though, most EV chargers are only warranted for two years.

Final Thoughts on Workplace EV Charging

So there you have it, all you need to know to install EV chargers at your workplace. A place where your employees thank you daily for fueling up their electric rides, and your customers who zip around in their EVs appreciate your forward-thinking approach. Remember, it’s not just about the convenience, it’s about being part of the bigger picture – smoothing out Australia’s ‘duck curve’ and boosting the economy.

As with everything worthwhile, installing EV chargers takes a bit of thought and effort. I’ve covered the different types of chargers, from the trickle charger to the lightning-fast DC Fast Chargers. You also know now that the costs can vary depending on whether you’re setting up Level 2 chargers or those power-hungry Level 3 DC chargers. But don’t forget, you might be able to avoid costly electrical upgrades with chargers that share the load, or even make some extra income for the business with the right charger and a tariff that often pays you to charge your employees’ cars during the daytime peak.

Footnotes

  1. Kudos to companies like Sungrow who have realised there’s a better bandwagon when you visit their warehouse. In fact, I’ve just put them on Plugshare so you can find them too... and Plugshare has led me to Komatsu doing the same thing, so on it goes
  2. or 10 hours, because I can recommend the 4-day work week if the management will listen
About Anthony Bennett

Anthony joined the SolarQuotes team in 2022. He’s a licensed electrician, builder, roofer and solar installer who for 14 years did jobs all over SA - residential, commercial, on-grid and off-grid. A true enthusiast with a skillset the typical solar installer might not have, his blogs are typically deep dives that draw on his decades of experience in the industry to educate and entertain. Read Anthony's full bio.

Comments

  1. Robert Cutcher says

    Best article for weeks. And only one joke! (There were others? – Must have gone over my head)

    • Anthony Bennett says

      Thanks Robert,

      I’ll take credit for the joke and lament that dozens more didn’t make it through editing. More credit is due to Finn though, he had to forge a hot mess into an article you could actually read. We’d be lost without good oversight.

  2. As a comparison, $2500 is what it costs to get a meter and a double power point installed.So is this subsidised?

    The EV landscape is fraught with risk as it is. If the law prohibits daytime charging in the future (as in the UK), where does that leave us?
    .
    Arguably putting it in the wall makes the whole “place” “occupied” by an “Electricity Suppy Authority”. I can’t see that being abused.

    • Finn Peacock says

      Q. As a comparison, $2500 is what it costs to get a meter and a double power point installed. So is this subsidised?
      A. No, that is not subsidised with charger hardware that costs about $1,000. The installation cost depends on where the charger is going relative to the switchboard. Further away = more expensive.

      Q. The EV landscape is fraught with risk as it is.
      Really? Compared to relying on imported fuel and being at the mercy of the global oil price?

      A. If the law prohibits daytime charging in the future (as in the UK), where does that leave us?
      Can you provide a link to the daytime charging ban in the UK? The grid wants us to charge from the grid during the day – that’s the cheapest and most plentiful electricity. And if you are connected to your own solar – no one can stop you charging.
      .
      Q. Arguably putting it in the wall makes the whole “place” “occupied” by an “Electricity Suppy Authority”. I can’t see that being abused.
      A. I think you are overthinking it.

  3. George Kaplan says

    The problem with this is workers almost never get carparks – those are reserved for managers, executives, CEOs, and board members who almost never turn up.

    Since those are also the folk with 6 figure priced vehicles, usually paid for by the company (if private) or the taxpayer (if government), do they really need more perks?

    Oh I’ve no doubt some organisations will jump on the idea as cheap PR, but most workers will not benefit even if they do save to buy an EV of their own.

    • Finn Peacock says

      “workers almost never get carparks”

      Big call.

      Not my experience.

    • Anthony Bennett says

      I hope George,

      Where that might change is that EV parking/charging is increasingly being managed by apps that let you book a spot to park. The management class may find they have to share EV spaces with the greater motoring public because in some cases, occupying a charger with no good reason will see you fined $3200. Hopefully that kind of outcome will see a shift in thinking, much like covid has shifted perceptions about working from home.

      Any place I’ve ever worked has had free parking for the workers, unless it was a CBD address with no onsite parking at all. I tried to ride my bike whenever I could, which helps everyone.

  4. I imagine a future scenario as follows:

    1/ Most will have EVs

    2/ Most will have charging available for their EVs at home and at work.

    3/ Most EVs will therefore have a lot of spare battery capacity in the evening time.

    4/ Most EVs will be able to put power back into the grid in the evening peak, using only a fraction of their capacity.

    I believe virtual power station arrangements could incentivise the above scenario, putting to use the large storage capacity of most EVs being well above the power consumption needs of the average household by a huge margin. For example, a 2023 Tesla Model 3 is either a 50 kWh or 82 kWh battery, and the average household consumption per whole day is couples with children 17 kWh/day per household.

    • In Nimbin, at Rainbow power, they have abt 100Kw of panels on a N facing wall. Employee & public Level 2 charging available!
      This seems to be a good compromise.
      For the rest, OCPP is the answer: that can manage access & payment too, as well as keeping accounts for employees buying cars with Novated Leasing (so the power could be charged back at retail cost against the novated lease.)
      For employers, the management can be performed by one of the commercial players as a service (eg ChargeHQ?)

      My 2c worth: I feel all level 2 chargers should be OCPP compliant. This allows some management of the grid in the future. (I run a ZJBeny OCPP charger managed by Home Assistant. Easier than installing more control electronics, since HA has the capability of managing the charge rate & time.)

      • Anthony Bennett says

        Hi Doug,

        I reckon that’s 5c worth these days, not only because SAPN are already running demand response trials with OCPP, but because I think it’ll be come mandatory in the future to have some network oversight of what will almost invariably be the single biggest load in the household.

        How easy do you find HA is to work with? Is there a 101 guide you can recommend? I understand people like it because being local in network terms means uncle Jeff from Amazon doesn’t know your every waking move and the house still functions even if the internet doesn’t.

        Cheers

    • Anthony Bennett says

      I think you’re on the money Jacob,

      In fact so does Simon Holmes a Court, in the recent Smart Energy Conference presentation from Climate 200, he made the point that Australia’s grid energy storage conundrum could be solved with the battery capacity in just 10% of our fully electrified light vehicle fleet.

      I think another way to put that is once we’ve rolled out EVs, you only need half of them, willing to use 20% of their battery, to trade energy and get paid for it. Seeing as cars generally spend 95% of their time parked, having them plugged in shouldn’t be insurmountable. We just have to clear a few regulatory obstacles to get cars plugged in on the street and educate the people who still think faster horses are preferable to cars.

      Cheers

Speak Your Mind

Please keep the SolarQuotes blog constructive and useful with these 5 rules:

1. Real names are preferred - you should be happy to put your name to your comments.
2. Put down your weapons.
3. Assume positive intention.
4. If you are in the solar industry - try to get to the truth, not the sale.
5. Please stay on topic.

Please solve: 30 + 8 

Get The SolarQuotes Weekly Newsletter